Oconee Site Flood Protection NRC Meeting with Duke Energy Carolinas, LLC November 5, 2008 r~jU.S.NRC
ý_.r'R.ýtn.
Purpose
- Discuss concerns with SSF licensing basis
- Discuss short-term interim measures for ONS operation
- Discuss a long-term solution to the question of flood protection at the ONS site
- i-IU.S.NRC se ae mat2 off iuiat U-se oiiVy -Se/6uA eI'te44fo Fol~i 1
6f'ic I a0 y- ý cr*
tl Iýn mi o
Qllfat
'e t
Concerns With SSF Licensing Basis SSF has protection against 5-ft or lower flood heights
- The only inundation study on record had calculated flood heights in excess of 5 feet
" NRC issued 10 CFR 50.54(f) letter
" Licensee response insufficient based on:
- Assertion that dam failures are not part of licensing basis
- Duke's response in dismissing various credible failure modes of Jocassee Dam
<ý*U,S.NRC
ýa Short-term Operation
- Basis for continued operation
- Low initiating event frequency
- Accident sequence progression timelines
- Additional information
- Plans for further modeling
- Interim guidance
- Bases for the proposed February 2009 modifications 1ýjU.S.NRC
%u
-bSei..t.y R Iaorr kn off~ioiad UseQn`@\\SecuLriWke'at
ýdlnf~orml'al
}
2n 2
KýficalU~se\\
- Siecar-ityRela d lnf raOn-a I6I>
Long-term Operation
" Technical arguments in 10 CFR 50.54(f) response are, insufficient Argument on probabilities of failure inadequate Inundation study not sufficient for licensing basis
" Technical basis needs to be re-established Submittal from Duke in 1 year NRC review in 1 year
- Analytical approach, if proposed, needs to follow current NRC guidance or have a clear basis for any deviation
" Engineered approach, if proposed, must have an adequate, conservative technical basis.
eQOI
<>S RUetejin
- tmNR,
,Offi/ciUse n1-'Se e
dn ai'ion 3