ML083650169 | 30 December 2008 | Correction to Amendment No. 175 Regarding Technical Specification Requirements for Inoperable Inverters | |
ML083590170 | 24 December 2008 | Request for Additional Information-Hope Creek Generating Station Technical Specification Changes to Add LCO 3.0.8 on the Inoperability of Snubbers | |
ML090360415 | 19 December 2008 | Draft - RO & SRO Written Exam (Folder 2) | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Half scram Stroke time Post Accident Monitoring Hydrostatic Squib Locked High Radiation Area Scram Discharge Volume Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Power change |
ML083230988 | 18 December 2008 | Issuance of Amendment 175 Technical Specification Requirements for Inoperable Inverters | Safe Shutdown Fire Barrier Fire Protection Program |
HCH-2008-156, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report | 18 December 2008 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report | NJPDES |
LR-N10-0355, Hope Creek, HC.IC-CC.SE-0003(Q) - Rev. 27, Nuclear Instrumentation System - Channel C Source Range Monitor C51-K600C | 16 December 2008 | Hope Creek, HC.IC-CC.SE-0003(Q) - Rev. 27, Nuclear Instrumentation System - Channel C Source Range Monitor C51-K600C | |
ML110050433 | 16 December 2008 | Hope Creek, HC.IC-CC.SE-0003(Q) - Rev. 27, Nuclear Instrumentation System - Channel C Source Range Monitor C51-K600C | |
TAC:ME0230 | 11 December 2008 | ||
LR-N08-0266, Submittal of Relief Request Associated with the Second Inservice Inspection (ISI) Interval | 11 December 2008 | Submittal of Relief Request Associated with the Second Inservice Inspection (ISI) Interval | Nondestructive Examination |
ML083460139 | 10 December 2008 | NRC Office of Investigations Case No. 1-2008-014 | |
ML083380590 | 3 December 2008 | Draft Request for Additional Information | |
ML083460136 | 3 December 2008 | New Jersey Department of Environmental Protection'S Bureau of Nuclear Engineering Comment on PSEG Nuclear Llc'S License Amendment Request to Remove Restrictions on Operation of the Hydrogen Water Chemistry System at Low Power. | |
ML090360406 | 28 November 2008 | Draft - Written Examination Outlines (Folder 2) | Locked High Radiation Area Pressure boundary leak |
ML090720629 | 28 November 2008 | Final Outlines (Folder 3) | High Radiation Area Pressure boundary leak |
TAC:U01693 | 24 November 2008 | ||
ML090360400 | 24 November 2008 | NRC Comments on Draft Licensee-Developed (Hope Creek) Exam (Written & Operating Tests) (Folder 2) | |
LR-N08-0249, Units I and 2, Response to RAI - Request for Authorization to Use Delta Protection French Designed Respiratory Protection Equipment | 21 November 2008 | Units I and 2, Response to RAI - Request for Authorization to Use Delta Protection French Designed Respiratory Protection Equipment | Mururoa |
LR-N08-0257, Clarification to Final Safety Evaluation for Extended Power Uprate, License Amendment No. 174 | 21 November 2008 | Clarification to Final Safety Evaluation for Extended Power Uprate, License Amendment No. 174 | |
ML110050560 | 21 November 2008 | Hope Creek, HC.OP-AR.ZZ-0001(Q), Rev. 19, Overhead Annunciator Window Box A1 | |
LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0001(Q), Rev. 19, Overhead Annunciator Window Box A1 | 21 November 2008 | Hope Creek, HC.OP-AR.ZZ-0001(Q), Rev. 19, Overhead Annunciator Window Box A1 | |
ML083660156 | 21 November 2008 | Submittal of Initial Operator Licensing Examination Outline | |
HCH-2008-147, Transmittal of New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for October 2008 | 20 November 2008 | Transmittal of New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for October 2008 | NJPDES |
ML083450496 | 18 November 2008 | License Amendment Request (LAR) H08-04 | |
IR 05000354/2008201 | 13 November 2008 | ||
ML083040315 | 12 November 2008 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2-Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
IR 05000354/2008004 | 12 November 2008 | IR 05000354-08-004; on 07/01/2008 - 09/30/2008; Hope Creek Generating Station; Post-Maintenance Testing | High winds High Radiation Area Ultimate heat sink Fire Barrier Internal Flooding Temporary Modification Significance Determination Process Operability Determination Flow Induced Vibration Power Uprate |
ML082900870 | 5 November 2008 | Correction to the Safety Evaluation for Amendment 174 Extended Power Uprate | High Radiation Area Weld Overlay |
IR 05000272/2008404 | 4 November 2008 | IR 05000272-08-404, 05000311-08-404 & 05000354-08-404; on 08/25/2008-09/26/2008; PSEG Nuclear LLC; Salem and Hope Creek Generating Stations, Problem Identification and Resolution Inspection | Significance Determination Process Affidavit |
IR 05000272/2008006 | 3 November 2008 | IR 05000272-08-006, IR 05000311-08-006, & IR 05000354-08-006, on 09/19/2008, Salem and Hope Creek Generating Stations (Letter Only) | B.5.b Mitigating Strategies |
LR-N08-0224, Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1 | 31 October 2008 | Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1 | Finite Element Analysis Liquid penetrant |
LR-N08-0256, Comment (3) of Jeffrie Keenan, on Behalf of PSEG Nuclear LLC, on Draft Regulatory Guide DG-5026, Fatigue Management for Nuclear Power Plant Personnel. | 31 October 2008 | Comment (3) of Jeffrie Keenan, on Behalf of PSEG Nuclear LLC, on Draft Regulatory Guide DG-5026, Fatigue Management for Nuclear Power Plant Personnel. | |
ML083100827 | 31 October 2008 | Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and Affidavit | MELLLA Power change |
LR-N08-0224, Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and Affidavit | 31 October 2008 | Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and Affidavit | MELLLA Power change |
ML083100828 | 31 October 2008 | Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0 | Finite Element Analysis |
LR-N08-0224, Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0 | 31 October 2008 | Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0 | Finite Element Analysis |
LR-N08-0247, Stations, Report of HHS-Certified Laboratory Testing Error Investigation and Corrective Action | 30 October 2008 | Stations, Report of HHS-Certified Laboratory Testing Error Investigation and Corrective Action | |
LR-N10-0355, Hope Creek, HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation. | 29 October 2008 | Hope Creek, HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation. | |
ML110060159 | 29 October 2008 | Hope Creek, HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation. | |
LR-N08-0224, Hope Creek - License Conditions 2.C.(22)2.c, FOL 2.C.(22)2.f, 2.C.(22)6 and Technical Specification 6.9.1.1 | 27 October 2008 | Hope Creek - License Conditions 2.C.(22)2.c, FOL 2.C.(22)2.f, 2.C.(22)6 and Technical Specification 6.9.1.1 | |
ML083100826 | 27 October 2008 | Hope Creek - License Conditions 2.C.(22)2.c, FOL 2.C.(22)2.f, 2.C.(22)6 and Technical Specification 6.9.1.1 | |
ML082980183 | 23 October 2008 | Draft Request for Additional Information | |
HCH-2008-131, Pollutant Discharge Elimination System, Discharge Monitoring Report, NJPDES Permit NJ0025411 | 22 October 2008 | Pollutant Discharge Elimination System, Discharge Monitoring Report, NJPDES Permit NJ0025411 | NJPDES |
ML082970174 | 22 October 2008 | Draft Request for Additional Information, Upcoming Conference Call | Mururoa |
LR-N08-0237, Response to Request for Additional Information Regarding Proposed License Amendment - Technical Specification Requirements for Inoperable Inverters | 20 October 2008 | Response to Request for Additional Information Regarding Proposed License Amendment - Technical Specification Requirements for Inoperable Inverters | |
LR-N08-0243, Special Report Update - North Plant Vent Radiation Monitoring System (Rms) | 17 October 2008 | Special Report Update - North Plant Vent Radiation Monitoring System (Rms) | |
ML082470063 | 16 October 2008 | Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Hope Creek Generating Station | Hydrostatic Probabilistic Risk Assessment VT-2 Incorporated by reference Large early release frequency Exemption Request Dissimilar Metal Weld |
ML082760758 | 14 October 2008 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Audit of the Licensee'S Management of Regulatory Commitments | Safe Shutdown |
ML082970219 | 13 October 2008 | Hope Creek Station Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | Safe Shutdown Past operability |
ML082810557 | 10 October 2008 | Westinghouse Electric Co., Request for Withholding Information from Public Disclosure for Hope Creek Generating Station | |
ML082800266 | 6 October 2008 | MR-1-2008-0010 - Plant Management Change for PSEG |