Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML08365016930 December 2008Correction to Amendment No. 175 Regarding Technical Specification Requirements for Inoperable Inverters
ML08359017024 December 2008Request for Additional Information-Hope Creek Generating Station Technical Specification Changes to Add LCO 3.0.8 on the Inoperability of Snubbers
ML09036041519 December 2008Draft - RO & SRO Written Exam (Folder 2)Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Loop seal
High Radiation Area
Half scram
Stroke time
Post Accident Monitoring
Hydrostatic
Squib
Locked High Radiation Area
Scram Discharge Volume
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Power change
ML08323098818 December 2008Issuance of Amendment 175 Technical Specification Requirements for Inoperable InvertersSafe Shutdown
Fire Barrier
Fire Protection Program
HCH-2008-156, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report18 December 2008New Jersey Pollutant Discharge Elimination System Discharge Monitoring ReportNJPDES
LR-N10-0355, Hope Creek, HC.IC-CC.SE-0003(Q) - Rev. 27, Nuclear Instrumentation System - Channel C Source Range Monitor C51-K600C16 December 2008Hope Creek, HC.IC-CC.SE-0003(Q) - Rev. 27, Nuclear Instrumentation System - Channel C Source Range Monitor C51-K600C
ML11005043316 December 2008Hope Creek, HC.IC-CC.SE-0003(Q) - Rev. 27, Nuclear Instrumentation System - Channel C Source Range Monitor C51-K600C
TAC:ME023011 December 2008
LR-N08-0266, Submittal of Relief Request Associated with the Second Inservice Inspection (ISI) Interval11 December 2008Submittal of Relief Request Associated with the Second Inservice Inspection (ISI) IntervalNondestructive Examination
ML08346013910 December 2008NRC Office of Investigations Case No. 1-2008-014
ML0833805903 December 2008Draft Request for Additional Information
ML0834601363 December 2008New Jersey Department of Environmental Protection'S Bureau of Nuclear Engineering Comment on PSEG Nuclear Llc'S License Amendment Request to Remove Restrictions on Operation of the Hydrogen Water Chemistry System at Low Power.
ML09036040628 November 2008Draft - Written Examination Outlines (Folder 2)Locked High Radiation Area
Pressure boundary leak
ML09072062928 November 2008Final Outlines (Folder 3)High Radiation Area
Pressure boundary leak
TAC:U0169324 November 2008
ML09036040024 November 2008NRC Comments on Draft Licensee-Developed (Hope Creek) Exam (Written & Operating Tests) (Folder 2)
LR-N08-0249, Units I and 2, Response to RAI - Request for Authorization to Use Delta Protection French Designed Respiratory Protection Equipment21 November 2008Units I and 2, Response to RAI - Request for Authorization to Use Delta Protection French Designed Respiratory Protection EquipmentMururoa
LR-N08-0257, Clarification to Final Safety Evaluation for Extended Power Uprate, License Amendment No. 17421 November 2008Clarification to Final Safety Evaluation for Extended Power Uprate, License Amendment No. 174
ML11005056021 November 2008Hope Creek, HC.OP-AR.ZZ-0001(Q), Rev. 19, Overhead Annunciator Window Box A1
LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0001(Q), Rev. 19, Overhead Annunciator Window Box A121 November 2008Hope Creek, HC.OP-AR.ZZ-0001(Q), Rev. 19, Overhead Annunciator Window Box A1
ML08366015621 November 2008Submittal of Initial Operator Licensing Examination Outline
HCH-2008-147, Transmittal of New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for October 200820 November 2008Transmittal of New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for October 2008NJPDES
ML08345049618 November 2008License Amendment Request (LAR) H08-04
IR 05000354/200820113 November 2008
ML08304031512 November 2008and Salem Nuclear Generating Station, Unit Nos. 1 and 2-Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients
IR 05000354/200800412 November 2008IR 05000354-08-004; on 07/01/2008 - 09/30/2008; Hope Creek Generating Station; Post-Maintenance TestingHigh winds
High Radiation Area
Ultimate heat sink
Fire Barrier
Internal Flooding
Temporary Modification
Significance Determination Process
Operability Determination
Flow Induced Vibration
Power Uprate
ML0829008705 November 2008Correction to the Safety Evaluation for Amendment 174 Extended Power UprateHigh Radiation Area
Weld Overlay
IR 05000272/20084044 November 2008IR 05000272-08-404, 05000311-08-404 & 05000354-08-404; on 08/25/2008-09/26/2008; PSEG Nuclear LLC; Salem and Hope Creek Generating Stations, Problem Identification and Resolution InspectionSignificance Determination Process
Affidavit
IR 05000272/20080063 November 2008IR 05000272-08-006, IR 05000311-08-006, & IR 05000354-08-006, on 09/19/2008, Salem and Hope Creek Generating Stations (Letter Only)B.5.b Mitigating Strategies
LR-N08-0224, Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 131 October 2008Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1Finite Element Analysis
Liquid penetrant
LR-N08-0256, Comment (3) of Jeffrie Keenan, on Behalf of PSEG Nuclear LLC, on Draft Regulatory Guide DG-5026, Fatigue Management for Nuclear Power Plant Personnel.31 October 2008Comment (3) of Jeffrie Keenan, on Behalf of PSEG Nuclear LLC, on Draft Regulatory Guide DG-5026, Fatigue Management for Nuclear Power Plant Personnel.
ML08310082731 October 2008Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and AffidavitMELLLA
Power change
LR-N08-0224, Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and Affidavit31 October 2008Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and AffidavitMELLLA
Power change
ML08310082831 October 2008Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0Finite Element Analysis
LR-N08-0224, Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 031 October 2008Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0Finite Element Analysis
LR-N08-0247, Stations, Report of HHS-Certified Laboratory Testing Error Investigation and Corrective Action30 October 2008Stations, Report of HHS-Certified Laboratory Testing Error Investigation and Corrective Action
LR-N10-0355, Hope Creek, HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation.29 October 2008Hope Creek, HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation.
ML11006015929 October 2008Hope Creek, HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation.
LR-N08-0224, Hope Creek - License Conditions 2.C.(22)2.c, FOL 2.C.(22)2.f, 2.C.(22)6 and Technical Specification 6.9.1.127 October 2008Hope Creek - License Conditions 2.C.(22)2.c, FOL 2.C.(22)2.f, 2.C.(22)6 and Technical Specification 6.9.1.1
ML08310082627 October 2008Hope Creek - License Conditions 2.C.(22)2.c, FOL 2.C.(22)2.f, 2.C.(22)6 and Technical Specification 6.9.1.1
ML08298018323 October 2008Draft Request for Additional Information
HCH-2008-131, Pollutant Discharge Elimination System, Discharge Monitoring Report, NJPDES Permit NJ002541122 October 2008Pollutant Discharge Elimination System, Discharge Monitoring Report, NJPDES Permit NJ0025411NJPDES
ML08297017422 October 2008Draft Request for Additional Information, Upcoming Conference CallMururoa
LR-N08-0237, Response to Request for Additional Information Regarding Proposed License Amendment - Technical Specification Requirements for Inoperable Inverters20 October 2008Response to Request for Additional Information Regarding Proposed License Amendment - Technical Specification Requirements for Inoperable Inverters
LR-N08-0243, Special Report Update - North Plant Vent Radiation Monitoring System (Rms)17 October 2008Special Report Update - North Plant Vent Radiation Monitoring System (Rms)
ML08247006316 October 2008Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Hope Creek Generating StationHydrostatic
Probabilistic Risk Assessment
VT-2
Incorporated by reference
Large early release frequency
Exemption Request
Dissimilar Metal Weld
ML08276075814 October 2008and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Audit of the Licensee'S Management of Regulatory CommitmentsSafe Shutdown
ML08297021913 October 2008Hope Creek Station Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.Safe Shutdown
Past operability
ML08281055710 October 2008Westinghouse Electric Co., Request for Withholding Information from Public Disclosure for Hope Creek Generating Station
ML0828002666 October 2008MR-1-2008-0010 - Plant Management Change for PSEG