HC.OP-SO.SM-0001(Q), Rev. 17, Isolation Systems Operation
ML110060159
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 10/29/2008
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
References
LR-N10-0355 HC.OP-SO.SM-0001(Q), Rev 17
Download: ML110060159 (43)


Text

PSEG Internal Use Only PSEG NUCLEAR L.L.C.

Page 1 of 1 HOPE CREEK GENERATING STATION HC.OP-SO.SM-0001(Q) - Rev. 17 ISOLATION SYSTEMS OPERATION USE CATEGORY: II

  • Biennial Review Performed: Yes No NA 9
  • Packages and Affected Document Numbers incorporated into this revision:

CP No.

CP Rev.

AD No.

Rev No.

None 9

  • The following OTSCs were incorporated into this revision: None REVISION

SUMMARY

  • Adds a qualifier to Step 5.3.2.A to perform this step only if a Group 1 isolation has occurred.

Group 1 will not need a reset unless it has tripped, and performance of this step could cause a scram if the isolation had not occurred. This is additional information and is editorial.

(70086941-0010)

IMPLEMENTATION REQUIREMENTS Effective Date 10/29/08 None

HC.OP-SO.SM-0001(Q)

Hope Creek Page 1 of 42 Rev. 17 ISOLATION SYSTEMS OPERATION TABLE OF CONTENTS Section Title Page 1.0 PURP OSE.............................................................................................................2 2.0 PREREQUI SITES.................................................................................................2 3.0 PRECAUTIONS

& LIMITATIONS..........................................................................2 4.0 EQUIPMENT REQUIRED.....................................................................................3 5.0 PROC EDURE.......................................................................................................4 5.1 Placing the Isolation Systems in Standby...................................................4 5.2 Isolation Systems Manual/or Automatic Initiation/Observation...................7 5.3 Resetting the Isolation Systems...............................................................38 6.0 RECO RDS..........................................................................................................42 7.0 REFERE NCES....................................................................................................42 ATTACHMENTS None

HC.OP-SO.SM-0001(Q)

Hope Creek Page 2 of 42 Rev. 17 1.0 PURPOSE This procedure outlines the steps necessary for the operation of the Isolation System.

2.0 PREREQUISITES 2.1 Placing the Isolation Systems in Standby 2.1.1.

Reactor Protection System is in service to provide isolation signals to PCIS.

2.1.2.

Nuclear Boiler System is in service IAW HC.OP-SO.BB-0001, to provide isolation signals to PCIS.

2.2 Isolation Systems Manual or Automatic Initiation/Observation None 2.3 Resetting the Isolation Systems 2.3.1.

System has been initiated IAW Section 5.2 of this procedure.

2.3.2.

System is ready to be reset.

3.0 PRECAUTIONS AND LIMITATIONS 3.1 Precautions 3.1.1.

DO NOT override any Isolation OR Trip without approval of the SM/CRS. ____

3.1.2. WHEN an isolation occurs, its effect upon the individual system in which it occurs should be evaluated for follow up action in that system. ____

3.1.3.

BC-HVF008 AND BC-HVF009 will isolate on a loss of power to either the A channel OR the D Channel of NSSSS.

3.1.4.

All half isolation signals from Core Spray OR NS4 into PCIS logics, will cause the isolation logic tripped light to flash.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 3 of 42 Rev. 17 3.2 Limitations 3.2.1.

ENSURE compliance with the Isolation Actuation Instrumentation operability requirements of Technical Specifications 3/4.3.2.

3.2.2.

ENSURE compliance with the Containment Isolation Valves operability requirements of Technical Specifications 3/4.6.3.

3.3 Interlocks 3.3.1.

Isolation actions will not occur on any valve or pump transferred to the Remote Shutdown Panel.

4.0 EQUIPMENT REQUIRED None

HC.OP-SO.SM-0001(Q)

Hope Creek Page 4 of 42 Rev. 17 5.0 PROCEDURE NOTE All operations are performed from 10C650 and 10C651C unless otherwise noted.

5.1 Placing the Isolation System in Standby 5.1.1.

ENSURE all prerequisites have been satisfied IAW Section 2.1 of this procedure.

NOTE The following is only a guideline and Plant conditions, Mode or System Testing may cause some condition other than stated. The SM/CRS should be notified of any discrepancies not accounted for.

5.1.2.

CHECK the following annunciators are deenergized:

A.

All Isolation Signal Annunciators, unless signal is in a bypassed condition (REFER to Table SM-001 through SM-020). ____

B.

NSSSS MSIV LOGIC A (B,C and D) INITIATED (C8-A1(2,3,4)) ____

C.

NSSSS INBD ISLN SYS OUT OF SVCE (C8-A5)

D.

NSSSS OUTBD ISLN SYS OUT OF SVCE (C8-B5)

E.

NSSSS TRIP UNIT TROUBLE (C8-C5)

F.

NSSSS ISLN SIG-MANUAL ISOLATION (C8-B1)

G.

NSSSS MANUAL ISLN SW ARMED (C8-C1)

H.

CORE SPRAY PUMP A(B,C and D) AUTO START (B3-A1(3,2,4) ____

I.

CORE SPRAY LOGIC A(B,C and D) OUT OF SVCE (B3-B1(3,2,4) ____

J.

CORE SPRAY MANUAL INIT SW ARMED (B3-C5)

K.

LVL 2/DW PRESS ISLN OUT OF SVCE (B3-D5)

Continued on next page

HC.OP-SO.SM-0001(Q)

Hope Creek Page 5 of 42 Rev. 17 5.1.2 (continued)

L.

RHR LPCI LOOP A(C,B and D) INITIATED (A6-A3(4),

A7-A3(4)) ____

M.

RHR LOGIC A(C,B and D) OUT OF SERVICE (A6-A1(2), A7-A1(2))

N.

RHR MAN INIT SWITCH ARMED (A6-B5)

O.

HPCI OUT OF SERVICE (B1-B5)

P.

RCIC OUT OF SERVICE (B1-B2)

NOTE The following is only a guideline and Plant conditions, Mode or System Testing may cause some condition other than stated. The SM/CRS should be notified of any discrepancies not accounted for.

5.1.3.

CHECK the following Status Lights are off.

A.

CNTMT ISLN MAN INITIATION CHANNEL A(B,C and D)

TRIPPED ____

B.

NSSSS LOGIC A(B,C and D) MSIV TRIP LOGIC TRIPPED ____

C.

NSSSS TRIP UNIT IN CAL OR GROSS FAIL D.

NSSSS OUT OF SERVICE A and D LOGICS E.

CORE SPRAY LOGIC PWR FAIL F.

CORE SPRAY TRIP UNIT IN CAL OR GROSS FAIL G.

CORE SPRAY TRIP UNIT OUT OF FILE OR PWR FAIL H.

CORE SPRAY OUT OF SERVICE I.

RHR LOGIC PWR FAIL J.

RHR TRIP UNIT IN CAL OR GROSS FAIL K.

RHR TRIP UNIT OUT OF FILE OR PWR FAIL L.

RHR OUT OF SERVICE M.

HPCI LOGIC PWR FAIL Continued on next page

HC.OP-SO.SM-0001(Q)

Hope Creek Page 6 of 42 Rev. 17 5.1.3 (continued)

N.

HPCI TRIP UNIT IN CAL OR GROSS FAIL O.

HPCI TRIP UNIT OUT OF FILE OR PWR FAIL P.

HPCI OUT OF SERVICE Q.

HPCI ISLN INIT R.

HPCI INVERTER FAIL S.

HPCI AREA TEMP MON LOGIC PWR FAIL T.

RCIC LOGIC PWR FAIL U.

RCIC TRIP UNIT IN CAL OR GROSS FAIL V.

RCIC TRIP UNIT OUT OF FILE OR PWR FAIL W.

RCIC OUT OF SERVICE X.

RCIC ISLN INIT Y.

RCIC INVERTER FAIL Z.

RCIC AREA TEMP MON LOGIC PWR FAIL 5.1.4.

ENSURE CNTMT ISLN MAN INITIATION CHANNEL A,(B,C and D) SWITCHES are not ARMED.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 7 of 42 Rev. 17 5.2 Isolation Systems Manual or Automatic Initiation/Observation NOTE The Manual Isolation PBs listed in the Tables SM-001 through SM-020 are as follows:

NSSSS:

NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC A(B,C,D)

(10C651C)

CNTMT:

CNTMT ISLN MAN INITIATION CHANNEL A(B,C,D) (10C651C)

RHR:

RHR LOOP A(B,C,D) MANUAL INIT (10C650A)

CS:

CORE SPRAY LOGIC A(B,C,D) MAN INIT (10C650B and C)

HPCI:

HPCI ISLN LOGIC A TRIP (10C650B)

RCIC:

RCIC ISLN LOGIC B TRIP (10C650B)

HD-9598A(B): CONTROL ROOM VENTILATION CONTROL SPLY/EXH (10C650E)

CAUTION DO NOT override any Isolation or Trip without approval of the SM/CRS.

5.2.1.

Upon receipt AND validation of Isolation signal, OBSERVE the required actions for that particular isolation, have occurred IAW Table SM-001 through SM-020.

5.2.2. IF all operations have not occurred, PERFORM required operations IAW applicable SOP.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 8 of 42 Rev. 17 OBSERVE the Group 1 Valves listed in Table SM-001 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-001 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

AB-HVF022A INBD MSIV A

  1. NSSSS X X X

X X

AB-HVF022B INBD MSIV B

  1. NSSSS X X X

X X

AB-HVF022C INBD MSIV C

  1. NSSSS X X X

X X

AB-HVF022D INBD MSIV D

  1. NSSSS X X X

X X

AB-HVF028A OUTBD MSIV A

  1. NSSSS X X X

X X

AB-HVF028B OUTBD MSIV B

  1. NSSSS X X X

X X

AB-HVF028C OUTBD MSIV C

  1. NSSSS X X X

X X

AB-HVF028D OUTBD MSIV D

  1. NSSSS X X X

X X

AB-HVF016 CTMT INBD STM LINE DRAIN HDR ISLN INBOARD A NSSSS X X X

X X

AB-HVF019 CTMT INBD STM LINE DRAIN HDR ISLN OUTBOARD D NSSSS X X X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" B - CONDENSER VACUUM - LOW 21.5 inches Hg. Abs.

C - MAIN STEAM LINE PRESSURE - LOW 756 psig D - MAIN STEAM LINE FLOW - HIGH 162.8 psid E - MAIN STEAM TUNNEL TEMPERATURE - HIGH 160°F

  1. - Correct two of four
  • - Can receive a Half Isolation from D NSSSS Manual Isolation

" - Isolation can be bypassed by ISLN OVRD PB.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 9 of 42 Rev. 17 OBSERVE the Group 2 Valves listed in Table SM-002 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-002 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

BB-SV4310 REAC RECIRC LOOP B SAMPLE LINE ISLN INBD VLV A NSSSS X

X BB-SV4311 REAC RECIRC LOOP B SAMPLE LINE ISLN OUTBD VLV D NSSSS X

X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 2

-38" B - MAIN STEAM LINE RADIATION - HIGH, HIGH 3.0 X Full Power Background NOTE IF isolation is due to MAIN STEAM RADIATION-HIGH, HIGH signal, OBSERVE AIR REMOVAL MECH VAC PMP A and BP105 STOP is on.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 10 of 42 Rev. 17 NOTE BC-HVF008 and BC-HVF009 will isolate on a loss of power to either the A channel or the D channel of NSSSS.

OBSERVE the Group 3 Valves listed in Table SM-003 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-003 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

BC-HVF024A RHR LOOP A TEST RTN MOV A RHR X

X BC-HVF024B RHR LOOP B TEST RTN MOV B RHR X

X BC-HVF010A RHR LOOP C TEST RTN MOV C RHR X

X BC-HVF010B RHR LOOP D TEST RTN MOV D RHR X

X BC-HVF027A RHR LOOP A SUPP POOL SPRAY HDR ISLN MOV A RHR X

X BC-HVF027B RHR LOOP B SUPP POOL SPRAY HDR ISLN MOV B RHR X

X BC-HVF009 SHUTDOWN COOLING INBD ISLN MOV A NSSSS X

X BC-HVF008 SHUTDOWN COOLING OUTBD ISLN MOV D NSSSS X

X BC-HVF015A RHR LOOP A RTN TO RECIRC LOOP A ISLN MOV D NSSSS X

X BC-HVF015B RHR LOOP B RTN TO RECIRC LOOP B ISLN MOV D NSSSS X

X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 3 12.5" B - REACTOR VESSEL PRESSURE (SHUTDOWN COOLING) - HIGH 82 psig C - REACTOR VESSEL WATER LEVEL 1

-129" D - DRYWELL PRESSURE - HIGH 1.68 psig

HC.OP-SO.SM-0001(Q)

Hope Creek Page 11 of 42 Rev. 17 OBSERVE the Group 4 Valves listed in Table SM-004 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-004 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

BE-HVF015A LOOP A TEST RETURN VALVE A CS X

X BE-HVF015B LOOP B TEST RETURN VALVE B CS X

X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" B - DRYWELL PRESSURE - HIGH 1.68 psig

HC.OP-SO.SM-0001(Q)

Hope Creek Page 12 of 42 Rev. 17 OBSERVE the Group 5 Valves listed in Table SM-005 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-005 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

FD-HVF002 INBD HPCI STM ISLN MOV X X X

X X

X X

FD-HVF100 HPCI W/U VLV X X X

X X

X X

FD-HVF003 OUTBD HPCI STM ISLN MOV

  • HPCI X X X

X X

X X

BJ-HVF042 HPCI PMP SUCT FROM SUPP CHB

  • HPCI X X X X X X X FD-HVF075 HPCI VAC BRKR ISLN #

X X

FD-HVF079 HPCI VAC BRKR ISLN #

X X

ISOLATION SETPOINT A - HPCI STEAM LINE DIFFERENTIAL PRESSURE (FLOW) - HIGH 1032 inches H2O (3 to 13 second time delay)

B - HPCI STEAM SUPPLY PRESSURE - LOW 100 psig C - HPCI TURBINE EXH DIAPHRAGM PRESS HIGH 10 psig D - HPCI PUMP ROOM TEMPERATURE - HIGH 160°F E - HPCI PUMP ROOM VENTILATION DUCTS DIFFERENTIAL TEMPERATURE - HIGH 70°F F - HPCI PIPE ROUTING AREA TEMPERATURE - HIGH 160°F (15 minute time delay)

G - HPCI TORUS COMPARTMENT TEMPERATURE - HIGH 128°F (15 minute time delay)

H - DRYWELL PRESSURE - HIGH 1.68 psig

  • - Only if Initiation signal is sealed in.
  1. Both isolation signals required for an isolation to occur.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 13 of 42 Rev. 17 OBSERVE the Group 6 Valves listed in Table SM-006 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-006 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

FC-HVF007 RCIC STM INBD ISLN MOV X X X

X X

X X

FC-HVF076 RCIC WARMUP VLV X X X

X X

X X

FC-HVF008 RCIC STM OUTBD ISLN MOV

  • RCIC X X X X X X X FC-HVF062 RCIC VAC BRKR ISLN VLV #

X X

FC-HVF084 RCIC VAC BRKR ISLN VLV #

X X

ISOLATION SETPOINT A - RCIC STEAM LINE DIFFERENTIAL PRESSURE (FLOW) - HIGH 598 inches H2O (3 to 13 second time delay)

B - RCIC STEAM SUPPLY PRESSURE - LOW 64.5 psig (4 second time delay)

C - RCIC TURBINE EXHAUST DIAPHRAGM PRESSURE - HIGH 10 psig D - RCIC PUMP ROOM TEMPERATURE - HIGH 160°F E - RCIC PUMP ROOM VENTILATION DUCTS DIFFERENTIAL TEMPERATURE - HIGH 70°F F - RCIC PIPE ROUTING AREA TEMPERATURE - HIGH 160°F (30 minute time delay)

G - RCIC TORUS COMPARTMENT TEMPERATURE - HIGH 128°F (30 minute time delay)

H - DRYWELL PRESSURE - HIGH 1.68 psig

  • - Only if Initiation signal is sealed in.
  1. Both isolation signals required for an isolation to occur.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 14 of 42 Rev. 17 OBSERVE the Group 7 Valves listed in Table SM-007 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-007 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

BG-HVF001 RWCU PMP SUCT CONT INBD ISOLATION VALVE A NSSSS X X X

X X

X X

BG-HVF004 RWCU PMP SUCT CONT OUTBD ISOLATION VALVE D NSSSS X X X X X X X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 2

-38" B - RWCU DIFFERENTIAL FLOW - HIGH

> 56 gpm (45 sec time delay)

C - RWCU AREA TEMPERATURE - HIGH (PIPE CHASE, ROOM 4402) 160°F D - RWCU AREA TEMPERATURE - HIGH (PUMP ROOM & HEAT EXCHANGER ROOMS) 140°F E - RWCU AREA TEMPERATURE - HIGH (PIPE CHASE, ROOM 4505) 135°F F - RWCU AREA VENTILATION DIFFERENTIAL TEMPERATURE - HIGH 60°F G - STANDBY LIQUID CONTROL SYSTEM INITIATED N/A

HC.OP-SO.SM-0001(Q)

Hope Creek Page 15 of 42 Rev. 17 OBSERVE the Group 8 Valves listed in Table SM-008 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-008 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

EE-HV4680 TORUS WATER CLEANUP SUPP POOL SPLY INBD ISLN

  • A CNTMT X

X X

EE-HV4681 TORUS WATER CLEANUP SUPP POOL SPLY OUTBD ISLN

  • B CNTMT X

X X

EE-HV4652 TORUS WATER CLEANUP SUPP POOL RTN INBD ISLN

  • A CNTMT X

X X

EE-HV4679 TORUS WATER CLEANUP SUPP POOL RTN OUTBD ISLN

  • B CNTMT X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 2

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  • - Can receive a Half Isolation from the corresponding NSSSS Manual Isolation

HC.OP-SO.SM-0001(Q)

Hope Creek Page 16 of 42 Rev. 17 OBSERVE the Group 9 Valves listed in Table SM-009 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-009 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

"HB-HVF003 DRYWELL FLOOR DRAIN SUMP BT267 ISLN VLV

  • D CNTMT X

X X

"HB-HVF004 DRYWELL FLOOR DRAIN SUMP BT267 ISLN VLV

  • B CNTMT X

X X

"HB-HVF019 DRYWELL EQPT DRAIN SUMP AT267 ISLN VLV

  • C CNTMT X

X X

"HB-HVF020 DRYWELL EQPT DRAIN SUMP AT267 ISLN VLV

  • B CNTMT X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 2

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  • - Can receive a Half Isolation from the corresponding NSSSS Manual Isolation

" - Isolation can be bypassed by ISLN OVRD PB

HC.OP-SO.SM-0001(Q)

Hope Creek Page 17 of 42 Rev. 17 OBSERVE the Group 10 Valves listed in Table SM-010 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-010 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

GB-HV9531B1 CONTAINMENT CLG ISLN LOOP A INBD SPLY C CS X

X GB-HV9531B3 CONTAINMENT CLG ISLN LOOP B INBD SPLY C CS X

X GB-HV9531A1 CONTAINMENT CLG ISLN LOOP A OUTBD SPLY D CS X

X GB-HV9531A3 CONTAINMENT CLG ISLN LOOP B OUTBD SPLY D CS X

X GB-HV9531B2 CONTAINMENT CLG ISLN LOOP A INBD RTN C CS X

X GB-HV9531B4 CONTAINMENT CLG ISLN LOOP B INBD RTN C CS X

X GB-HV9531A2 CONTAINMENT CLG ISLN LOOP A OUTBD RTN D CS X

X GB-HV9531A4 CONTAINMENT CLG ISLN LOOP B OUTBD RTN D CS X

X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" B - DRYWELL PRESSURE - HIGH 1.68 psig

HC.OP-SO.SM-0001(Q)

Hope Creek Page 18 of 42 Rev. 17 OBSERVE the Group 11 Valves listed in Table SM-011 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-011 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

BF-HV3800A REACTOR RECIRCULATION SEAL PURGE WTR VALVE PMP A D CS X

X BF-HV3800B REACTOR RECIRCULATION SEAL PURGE WTR VALVE PMP B D CS X

X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" B - DRYWELL PRESSURE - HIGH 1.68 psig

HC.OP-SO.SM-0001(Q)

Hope Creek Page 19 of 42 Rev. 17 OBSERVE the Group 12 Valves listed in Table SM-012 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-012 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

"GS-HV4956 CONT ATMOSPHERE CPCS RTN TO CNTMT DPMR

  • A CNTMT X

X X

"GS-HV4979 CONT ATMOSPHERE CPCS RTN TO CNTMT DMPR

  • D CNTMT X

X X

"GS-HV4951 CONT ATMOSPHERE CNTMT TO CPCS BYPASS

  • D CNTMT X

X X

"GS-HV4950 CONT ATMOS CNTMT TO CPCS OUTBD DPMR

  • D CNTMT X

X X

"GS-HV4952 CONT ATMOS CNTMT TO CPCS INBD DMPR

  • A CNTMT X

X X

"GS-HV4980 CONT ATMOS CPCS RTN TO SUPP CHMBR

  • D CNTMT X

X X

"GS-HV4958 CONT ATMOSPHERE CPCS RTN TO SUPP CHMBR

  • A CNTMT X

X X

"GS-HV4963 CONT ATMOSPHERE SUPP CHMBR N2 M/U EXH

  • D CNTMT X

X X

"GS-HV4962 CONT ATMOS SUPP CHMBR TO CPCS OUTBD EXH

  • D CNTMT X

X X

"GS-HV4964 CONT ATMOSPHERE SUPP CHMBR TO CPCS INBD EXH

  • A CNTMT X

X X

"GS-HV4974 CONT ATMOSPHERE N2 M/U SPLY ISLN

  • D CNTMT X

X X

"GS-HV4978 CONT ATMOSPHERE N2 SPLY HDR ISLN

  • D CNTMT X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 2

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  • - Can receive a Half Isolation from the corresponding NSSSS Manual Isolation

" - Isolation can be bypassed by ISLN OVRD PB

HC.OP-SO.SM-0001(Q)

Hope Creek Page 20 of 42 Rev. 17 OBSERVE the Group 13 Valves listed in Table SM-013 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-013 (1 of 2)

VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

"GS-HV4955A CONT ATMOS A H2/O2 ANLZR UPR DRYWL SUCT

  • A CNTMT X

X X

"GS-HV4983A CONT ATMOS A H2/O2 ANLZR UPR DRYWL SUCT

  • C CNTMT X

X X

"GS-HV4984A CONT ATMOS A H2/O2 ANLZR UPR DRYWL SUCT

  • C CNTMT X

X X

"GS-HV5019A CONT ATMOS A H2/O2 ANLZR UPR DRYWL SUCT

  • A CNTMT X

X X

"GS-HV4955B CONT ATMOS B H2/O2 ANLZR UPR DRYWL SUCT

  • B CNTMT X

X X

"GS-HV4983B CONT ATMOS B H2/O2 ANLZR UPR DRYWL SUCT

  • D CNTMT X

X X

"GS-HV4984B CONT ATMOS B H2/O2 ANLZR UPR DRYWL SUCT

  • D CNTMT X

X X

"GS-HV5019B CONT ATMOS B H2/O2 ANLZR UPR DRYWL SUCT

  • B CNTMT X

X X

"GS-HV4965A CONT ATMOS A H2/O2 ANLZR UPR SUPP CHMBR SUCT

  • C CNTMT X

X X

"GS-HV4959A CONT ATMOS A H2/O2 ANLZR UPR SUPP CHMBR SUCT

  • A CNTMT X

X X

"GS-HV4965B CONT ATMOS B H2/O2 ANLZR UPR SUPP CHMBR SUCT

  • D CNTMT X

X X

"GS-HV4959B CONT ATMOS B H2/O2 ANLZR UPR SUPP CHMBR SUCT

  • B CNTMT X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 2

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  • - Can receive a Half Isolation from the corresponding NSSSS Manual Isolation

" - Isolation can be bypassed by ISLN OVRD PB

HC.OP-SO.SM-0001(Q)

Hope Creek Page 21 of 42 Rev. 17 OBSERVE the Group 13 Valves listed in Table SM-013 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-013 (2 of 2)

VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

"GS-HV4966A CONT ATMOS A H2/O2 ANLZR LWR SUPP CHMBR SUCT

  • A CNTMT X

X X

"GS-HV5022A CONT ATMOS A H2/O2 ANLZR LWR SUPP CHMBR SUCT

  • C CNTMT X

X X

"GS-HV4966B CONT ATMOS B H2/O2 ANLZR LWR SUPP CHMBR SUCT

  • B CNTMT X

X X

"GS-HV5022B CONT ATMOS B H2/O2 ANLZR LWR SUPP CHMBR SUCT

  • D CNTMT X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 2

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  • - Can receive a Half Isolation from the corresponding NSSSS Manual Isolation

" - Isolation can be bypassed by ISLN OVRD PB

HC.OP-SO.SM-0001(Q)

Hope Creek Page 22 of 42 Rev. 17 OBSERVE the Group 14 Valves listed in Table SM-014 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-014 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

"GS-HV5050A CONT ATMOS CNTMT H2 RECOMB AS205 INL

  • A CNTMT X

X X

"GS-HV5052A CONT ATMOS CNTMT H2 RECOMB AS205 INL

  • C CNTMT X

X X

"GS-HV5050B CONT ATMOS CNTMT H2 RECOMB BS205 INL

  • B CNTMT X

X X

"GS-HV5052B CONT ATMOS CNTMT H2 RECOMB BS205 INL

  • D CNTMT X

X X

"GS-HV5053A CONT ATMOS CNTMT H2 RECOMB AS205 OTL

  • C CNTMT X

X X

"GS-HV5054A CONT ATMOS CNTMT H2 RECOMB AS205 OTL

  • A CNTMT X

X X

"GS-HV5053B CONT ATMOS CNTMT H2 RECOMB BS205 OTL

  • D CNTMT X

X X

"GS-HV5054B CONT ATMOS CNTMT H2 RECOMB BS205 OTL

  • B CNTMT X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 2

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  • - Can receive a Half Isolation from the corresponding NSSSS Manual Isolation

" - Isolation can be bypassed by ISLN OVRD PB

HC.OP-SO.SM-0001(Q)

Hope Creek Page 23 of 42 Rev. 17 OBSERVE the Group 15 Valves listed in Table SM-015 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-015 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

"KL-HV5152A INSTRUMENT GAS SUPPLY HDR A INBD ISLN

+A CNTMT X

X X

"KL-HV5152B INSTRUMENT GAS SUPPLY HDR B INBD ISLN

+D CNTMT X

X X

"KL-HV5126A INSTRUMENT GAS SUPPLY HDR A OUTBD ISLN

+C CNTMT X

X X

"KL-HV5126B INSTRUMENT GAS SUPPLY HDR B OUTBD ISLN

+B CNTMT X

X X

KL-HV5148 INSTRUMENT GAS CPRSR SUCT INBD ISLN

+A CNTMT X

X X

KL-HV5147 INSTRUMENT GAS AK202 CPRSR SUCT OUTBD ISLN

+C CNTMT X

X X

KL-HV5162 INSTRUMENT GAS BK202 CPRSR SUCT OUTBD ISLN

+D CNTMT X

X X

KL-HV5154 INSTRUMENT GAS SUPP CH B OUTBD ISLN

  • D CNTMT X

X X

KL-HV5155 INSTRUMENT GAS SUPP CH B OUTBD ISLN

  • A CNTMT X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" B - REACTOR VESSEL WATER LEVEL 2

-38" C - DRYWELL PRESSURE - HIGH 1.68 psig D - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

+ - Also Isolates from the corresponding Core Spray Manual Initiation PB.

  • - Can receive a Half Isolation Signal from the corresponding NSSSS Manual Isolation

" - Isolation can be bypassed by ISLN OVRD PB

HC.OP-SO.SM-0001(Q)

Hope Creek Page 24 of 42 Rev. 17 OBSERVE the Group 16 Valves listed in Table SM-016 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-016 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

ED-HV2554 RACS REAC RECIRC PUMP COOLING ISLN INBOARD SPLY D CS X

X ED-HV2553 RACS REAC RECIRC PUMP COOLING ISLN OUTBOARD SPLY B CS X

X ED-HV2556 RACS REAC RECIRC PUMP COOLING ISLN INBOARD RTN D CS X

X ED-HV2555 RACS REAC RECIRC PUMP COOLING ISLN OUTBOARD RTN B CS X

X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" B - DRYWELL PRESSURE - HIGH 1.68 psig

HC.OP-SO.SM-0001(Q)

Hope Creek Page 25 of 42 Rev. 17 OBSERVE the Group 17 Valves listed in Table SM-017 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-017 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

SE-SVJ004A1 TIP TUBE PATH ISLN A NSSSS X

X SE-SVJ004A2 TIP TUBE PATH ISLN A NSSSS X

X SE-SVJ004A3 TIP TUBE PATH ISLN A NSSSS X

X SE-SVJ004A4 TIP TUBE PATH ISLN A NSSSS X

X SE-SVJ004A5 TIP TUBE PATH ISLN A NSSSS X

X SE-HV5161 INSTRUMENT GAS TIP PURGE

  • D CNTMT X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 2

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  • - Can receive a Half Isol Signal from the D NSSSS Manual Isol.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 26 of 42 Rev. 17 OBSERVE the Group 18 Valves listed in Table SM-018 have closed under the Manual or Automatic Isolation Signals specified.

TABLE SM-018 VALVE NO.

NOMENCLATURE MANUAL AUTO ISOLATIONS ISOLATION A B C D E

F G

H I

SK-HV5018 CONTAINMENT ATMOSPHERE LEAK DET

  • A CNTMT X

X X

SK-HV4953 CONTAINMENT ATMOSPHERE LEAK DET

  • D CNTMT X

X X

SK-HV4957 CONTAINMENT ATMOSPHERE LEAK DET

  • A CNTMT X

X X

SK-HV4981 CONTAINMENT ATMOSPHERE LEAK DET

  • D CNTMT X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 2

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  • - Can receive a Half Isolation Signal from the corresponding NSSSS Manual Isolation

HC.OP-SO.SM-0001(Q)

Hope Creek Page 27 of 42 Rev. 17 OBSERVE the Group 19 Dampers listed in Table SM-019 have closed under the Manual or Automatic Isolation Signals and other Actions have occurred for Equipment listed as specified.

TABLE SM-019 (1 of 3)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D

  1. GR-HD9414A REACTOR BLDG SPLY/EXH ISLN INBD EXH CLOSE
  • C CNTMT X X X X
  1. GR-HD9414B REACTOR BLDG SPLY/EXH ISLN OUTBD EXH CLOSE
  • D CNTMT X X X X
  1. GU-HD9370A REACTOR BLDG SPLY/EXH ISLN OUTBD SPLY CLOSE
  • C CNTMT X X X X
  1. GU-HD9370B REACTOR BLDG SPLY/EXH ISLN INBD SPLY CLOSE
  • D CNTMT X X X X GT-HD9372A DRYWELL PURGE EXH DRYWELL VENT CLOSE
  • A CNTMT X X X X GT-HD9372C DRYWELL PURGE SPLY CLOSE
  • A CNTMT X

X X

X GU-HD9395A FRVS RECIRC BYPASS CLOSE

  • A CNTMT X

X X

X GU-HD9395B FRVS RECIRC BYPASS CLOSE

  • B CNTMT X

X X

X 52-44024 RBVS SUPPLY FAN AVH300 TRIP

  • D CNTMT X

X X

X 52-41024 RBVS SUPPLY FAN BVH300 TRIP

  • A CNTMT X

X X

X 52-43024 RBVS SUPPLY FAN CVH300 TRIP

  • C CNTMT X

X X

X 52-48024 RBVS EXHAUST FAN AV301 TRIP

  • D CNTMT X

X X

X 52-42024 RBVS EXHAUST FAN BV301 TRIP

  • B CNTMT X

X X

X 52-45034 RBVS EXHAUST FAN CV301 TRIP

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REFUEL FLOOR EXHAUST RADIATION - HIGH 2 X 10-3 uCi/cc D - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  1. - Group 19 Dampers
  • - Can receive a Half Isolation Signal from the corresponding NSSSS Manual Isolation

HC.OP-SO.SM-0001(Q)

Hope Creek Page 28 of 42 Rev. 17 OBSERVE the Group 19 Dampers listed in Table SM-019 have closed under the Manual or Automatic Isolation Signals and other Actions have occurred for Equipment listed as specified.

TABLE SM-019 (2 of 3)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D 52-45014 RADIOACTIVE WASTE EXHAUST FAN 0AV305 TRIP

  • A CNTMT X X X X 52-46014 RADIOACTIVE WASTE EXHAUST FAN 0BV305 TRIP
  • B CNTMT X X X X 52-47014 RADIOACTIVE WASTE EXHAUST FAN 0CV305 TRIP
  • C CNTMT X X X X 52-47024 RADIOACTIVE WASTE SUPPLY FAN AV316 TRIP
  • C CNTMT X X X X 52-44034 RADIOACTIVE WASTE SUPPLY FAN BV316 TRIP
  • D CNTMT X X X X 52-45024 SEAL AIR COMPRESSOR 10K100 TRIP

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REFUEL FLOOR EXHAUST RADIATION - HIGH 2 X 10-3 uCi/cc D - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  1. - Group 19 Dampers
  • - Can receive a Half Isolation Signal from the corresponding NSSSS Manual Isolation

HC.OP-SO.SM-0001(Q)

Hope Creek Page 29 of 42 Rev. 17 OBSERVE the Group 19 Dampers listed in Table SM-019 have closed under the Manual or Automatic Isolation Signals and other Actions have occurred for Equipment listed as specified.

TABLE SM-019 (3 of 3)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D GU-AV206 FRVS VENT FAN A START

  • A CNTMT X

X X

X GU-BV206 FRVS VENT FAN B START

  • B CNTMT X

X X

X GU-AV213 FRVS RECIRCULATION FAN A

    • START
  • A CNTMT X X X X GU-BV213 FRVS RECIRCULATION FAN B
    • START
  • B CNTMT X X X X GU-CV213 FRVS RECIRCULATION FAN C
    • START
  • C CNTMT X X X X GU-DV213 FRVS RECIRCULATION FAN D
    • START
  • D CNTMT X X X X GU-EV213 FRVS RECIRCULATION FAN E
    • START
  • A CNTMT X X X X GU-FV213 FRVS RECIRCULATION FAN F
    • START
  • D CNTMT X X X X EG-AP210 SAFETY AUXILIARIES COOLING PUMP A START
  • A CNTMT X X X X EG-BP210 SAFETY AUXILIARIES COOLING PUMP B START

-38" B - DRYWELL PRESSURE - HIGH 1.68 psig C - REFUEL FLOOR EXHAUST RADIATION - HIGH 2 X 10-3 uCi/cc D - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

  • - Can receive a Half Isolation Signal from the corresponding NSSSS Manual Isolation
    • - Time delay on Start Signal

HC.OP-SO.SM-0001(Q)

Hope Creek Page 30 of 42 Rev. 17 OBSERVE the Equipment or Valves listed in Table SM-020 have met their required Action under the Manual or Automatic Isolation Signals TABLE SM-020 (1 of 8)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D "52-232094 INSTRUMENT GAS CPRSR AK202 TRIP

+C CNTMT X X X "52-242094 INSTRUMENT GAS CPRSR BK202 TRIP

+D CNTMT X X X "52-41011 RACS PMP AP209 BRKR TRIP A CS X

X "52-42011 RACS PMP BP209 BRKR TRIP B CS X

X "52-43014 CRD PMP AP207 BRKR TRIP C CS X

X "52-44014 CRD PMP BP207 BRKR TRIP D CS X

X "52-41014 MCC 10B313 BRKR TRIP A CS X

X "52-42014 MCC 10B323 BRKR TRIP B CS X

X "52-47011 MCC 10B272 BRKR TRIP C CS X

X "52-48011 MCC 10B282 BRKR TRIP D CS X

X "52-45011 MCC 10B252 BRKR TRIP A CS X

X "52-46011 MCC 10B262 BRKR TRIP B CS X

X "52-47031 MCC 00B474 BRKR TRIP C CS X

X 52-451023 INVERTER 10D496 B/U PWR (PA SYST)

TRIP A CS X

X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" C - DRYWELL PRESSURE - HIGH 1.68 psig D - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

+ - Also Isolates from the corresponding Core Spray Manual Initiation PB

  • - Can receive a Half Isolation from the corresponding NSSSS Manual Isolation

" - Isolation can be bypassed by TRIP OVRD PB

HC.OP-SO.SM-0001(Q)

Hope Creek Page 31 of 42 Rev. 17 OBSERVE the Equipment or Valves listed in Table SM-020 have met their required Action under the Manual or Automatic Isolation Signals TABLE SM-020 (2 of 8)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D 52-471023 INVERTER 0AD495 B/U PWR (SECURITY)

TRIP C CS X

X 52-441043 INVERTER 10D485 B/U PWR (PROCESS COMPUTER)

TRIP D CS X

X EA-HV2371A SACS LOOP A COOLING SACS EXCH A1 OUT OPEN A CS X

X EA-HV2371B SACS LOOP B COOLING SACS EXCH B1 OUT OPEN B CS X

X EA-HV2355A SACS LOOP A COOLING SACS EXCH A2 OUT OPEN C CS X

X EA-HV2355B SACS LOOP B COOLING SACS EXCH B2 OUT OPEN D CS X

X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" B - REACTOR VESSEL WATER LEVEL 2

-38" C - DRYWELL PRESSURE - HIGH 1.68 psig D - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc E - REACTOR VESSEL WATER LEVEL 3 12.5" F - CONTROL ROOM SUPPLY RADIATION - HIGH 2 X 10-5 u/Ci/cc

+ - Also Isolates from the corresponding Core Spray Manual Initiation PB

  • - Can receive a Half Isolation from the corresponding NSSSS Manual Isolation

" - Isolation can be bypassed by TRIP OVRD PB

HC.OP-SO.SM-0001(Q)

Hope Creek Page 32 of 42 Rev. 17 OBSERVE the Equipment or Valves listed in Table SM-020 have met their required Action under the Manual or Automatic Isolation Signals TABLE SM-020 (3 of 8)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D EA-HV2198A SERVICE WATER A PUMP DISCHARGE OPEN A CS X

X EA-HV2198B SERVICE WATER B PUMP DISCHARGE OPEN B CS X

X EA-HV2198C SERVICE WATER C PUMP DISCHARGE OPEN C CS X

X EA-HV2198D SERVICE WATER D PUMP DISCHARGE OPEN D CS X

X EA-HV2203 SERVICE WATER LOOP A RACS HX HDR SPLY CLOSE A CS X

X EA-HV2204 SERVICE WATER LOOP B RACS HX HDR SPLY CLOSE B CS X

X EA-HV2207 RACS HX COOLING INLET VALVE CLOSE C CS X

X EA-HV2346 RACS HX COOLING OUTLET VALVE CLOSE C CS X

X EG-HV2522A SACS TACS INBD SPLY/RTN LOOP A SPLY CLOSE A CS X

X EG-HV2522B SACS TACS INBD SPLY/RTN LOOP B SPLY CLOSE B CS X

X EG-HV2522C SACS TACS OUTBD SPLY/RTN LOOP A SPLY CLOSE C CS X

X EG-HV2522D SACS TACS OUTBD SPLY/RTN LOOP B SPLY CLOSE D CS X

X EG-HV2496A SACS TACS INBD SPLY/RTN LOOP A RTN CLOSE A CS X

X EG-HV2496B SACS TACS INBD SPLY/RTN LOOP B RTN CLOSE B CS X

X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" B - REACTOR VESSEL WATER LEVEL 2

-38" C - DRYWELL PRESSURE - HIGH 1.68 psig

HC.OP-SO.SM-0001(Q)

Hope Creek Page 33 of 42 Rev. 17 OBSERVE the Equipment or Valves listed in Table SM-020 have met their required Action under the Manual or Automatic Isolation Signals TABLE SM-020 (4 of 8)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D EG-HV2496C SACS TACS OUTBD SPLY/RTN LOOP A RTN CLOSE C CS X

X EG-HV2496D SACS TACS OUTBD SPLY/RTN LOOP B RTN CLOSE D CS X

X EG-HV2317A FUEL POOLING COOLING HX INL CROSS CONN CLOSE A CS X

X EG-HV2317B FUEL POOLING COOLING HX INL CROSS CONN CLOSE B CS X

X EG-HV7922A FUEL POOLING COOLING HX OTL CROSS CONN CLOSE A CS X

X EG-HV7922B FUEL POOLING COOLING HX OTL CROSS CONN CLOSE B CS X

X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" C - DRYWELL PRESSURE - HIGH 1.68 psig

HC.OP-SO.SM-0001(Q)

Hope Creek Page 34 of 42 Rev. 17 OBSERVE the Equipment or Valves listed in Table SM-020 have met their required Action under the Manual or Automatic Isolation Signals TABLE SM-020 (5 of 8)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D EG-HV2453A INSTRUMENT GAS COMPRESSOR CLNG WTR A SPLY CROSS CONN CLOSE C CS X

X EG-HV2453B INSTRUMENT GAS COMPRESSOR CLNG WTR B SPLY CROSS CONN CLOSE D CS X

X EG-HV2321A INSTRUMENT GAS COMP COOLING WTR A RTN CROSS CONN CLOSE C CS X

X EG-HV2321B INSTRUMENT GAS COMP COOLING WTR B RTN CROSS CONN CLOSE D CS X

X ED-HV2598 REAC AUXILIARIES COOLING REAC BLDG ISLN RTN CLOSE A CS X

X ED-HV2599 REAC AUXILIARIES COOLING REAC BLDG ISLN SPLY CLOSE A CS X

X "GS-HV5035 CONT ATMOSPHERE CACS N2 SUP HDR ISLN CLOSE

  • D CNTMT X X X "GS-HV5055A CONT ATMOSPHERE RHR LP A TO H2 RECOMB CLOSE
  • A CNTMT X X X "GS-HV5055B CONT ATMOSPHERE RHR LP B TO H2 RECOMB CLOSE
  • B CNTMT X X X "GS-HV5057A CONT ATMOSPHERE H2 RECOMB A RHR INL ISLN CLOSE

-129" B - REACTOR VESSEL WATER LEVEL 2

-38" C - DRYWELL PRESSURE - HIGH 1.68 psig D - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

+ - Also Isolates from the corresponding Core Spray Manual Initiation PB

  • - Can receive a Half Isolation from the corresponding NSSSS Manual Isolation

" - Isolation can be bypassed by ISLN OVRD PB

HC.OP-SO.SM-0001(Q)

Hope Creek Page 35 of 42 Rev. 17 OBSERVE the Equipment or Valves listed in Table SM-020 have met their required Action under the Manual or Automatic Isolation Signals TABLE SM-020 (6 of 8)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D "GS-HV5057B CONT ATMOSPHERE H2 RECOMB B RHR INL ISLN CLOSE

  • D CNTMT X X X "KL-HV5172A CONT ATMOSPHERE A INSTR GAS EMER SUP CLOSE
  • A CNTMT X X X "KL-HV5172B CONT ATMOSPHERE B INSTR GAS EMER SUP CLOSE
  • B CNTMT X X X "KL-HV5156A INSTRUMENT GAS SPLY HDRS A&B CROSS CONN CLOSE
  • C CNTMT X X X "KL-HV5156B INSTRUMENT GAS SPLY HDRS A&B CROSS CONN CLOSE
  • D CNTMT X X X KL-HV5124A INSTRUMENT GAS CNTMT SPLY HDR A ISLN CLOSE

+C CNTMT X X X KL-HV5124B INSTRUMENT GAS CNTMT SPLY HDR B ISLN CLOSE

+D CNTMT X X X ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" B - REACTOR VESSEL WATER LEVEL 2

-38" C - DRYWELL PRESSURE - HIGH 1.68 psig D - REACTOR BUILDING EXHAUST RADIATION - HIGH 1 X 10-3 uCi/cc

+ - Also Isolates from the corresponding Core Spray Manual Initiation PB

  • - Can receive a Half Isolation from the corresponding NSSSS Manual Isolation

" - Isolation can be bypassed by ISLN OVRD PB

HC.OP-SO.SM-0001(Q)

Hope Creek Page 36 of 42 Rev. 17 OBSERVE the Equipment or Valves listed in Table SM-020 have met their required Action under the Manual or Automatic Isolation Signals TABLE SM-020 (7 of 8)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D E

F BC-HVF040 RHR LOOP B DSCH TO LIQ RW ISLN MOV CLOSE D NSSSS X

X BC-HVF049 RHR LOOP B DSCH TO LIQ RW ISLN MOV CLOSE A NSSSS X

X BC-HVF079A RHR// HX A SAMPLE LINE INBD ISLN CLOSE A NSSSS X

X BC-HVF080A RHR HX A SAMPLE LINE OUTBD ISLN CLOSE D NSSSS X

X BC-HVF079B RHR HX B SAMPLE LINE INBD ISLN CLOSE A NSSSS X

X BC-HVF080B RHR HX B SAMPLE LINE OUTBD ISLN CLOSE D NSSSS X

X GK-HD9598A CONTROL AREA EXH FANS INL ISLN DMPR CLOSE

@HD-9598A X

X X

GK-HD9598B CONTROL AREA EXH FANS INL ISLN DMPR CLOSE

@HD-9598B X

X X

GK-HD9588AA CONTROL AREA SPLY/EXH OPR MODE CLOSE

@HD-9598A X

X X

GK-HD9588AB CONTROL AREA SPLY/EXH OPR MODE CLOSE

@HD-9598B X

X X

GK-HD9588BA CONTROL AREA SPLY/EXH OPR MODE CLOSE

@HD-9598A X

X X

GK-HD9588BB CONTROL AREA SPLY/EXH OPR MODE CLOSE

@HD-9598B X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" C - DRYWELL PRESSURE - HIGH 1.68 psig E - REACTOR VESSEL WATER LEVEL 3 12.5" F - CONTROL ROOM SUPPLY RADIATION - HIGH 2 X 10-5 u/Ci/cc

@ - Also Isolates from the Core Spray Manual Initiation PB (Logic C for handswitch HD-9598A and Logic D for handswitch HD-9598B)

HC.OP-SO.SM-0001(Q)

Hope Creek Page 37 of 42 Rev. 17 OBSERVE the Equipment or Valves listed in Table SM-020 have met their required Action under the Manual or Automatic Isolation Signals TABLE SM-020 (8 of 8)

EQUIPMENT NOMENCLATURE ACTION MANUAL AUTO ISOLATIONS NUMBER ISOLATION A B C D E

F GK-AV400 CONTROL RM EMER FILTER UNIT START

@HD-9598A X

X X

GK-BV400 CONTROL RM EMER FILTER UNIT START

@HD-9598B X

X X

GK-AV402 CONTROL AREA EXH FAN A STOP

@HD-9598A X

X X

GK-BV402 CONTROL AREA EXH FAN B STOP

@HD-9598A X

X X

ISOLATION SETPOINT A - REACTOR VESSEL WATER LEVEL 1

-129" C - DRYWELL PRESSURE - HIGH 1.68 psig F - CONTROL ROOM SUPPLY RADIATION - HIGH 2 X 10-5 u/Ci/cc

@ - Also Isolates from the Core Spray Manual Initiation PB (Logic C for handswitch HD-9598A and Logic D for handswitch HD-9598B)

HC.OP-SO.SM-0001(Q)

Hope Creek Page 38 of 42 Rev. 17 5.3 Resetting the Isolation Systems 5.3.1.

ENSURE that all prerequisites have been satisfied IAW Section 2.3 of this procedure.

5.3.2.

To reset the Nuclear Steam Supply Shutoff System, PERFORM the following:

A. IF MSIVs have closed on a Group 1 isolation, THEN ENSURE the following MSIV control switches are in CLOSE:

HVF028A OUTBD MSIV A HVF028B OUTBD MSIV B HVF028C OUTBD MSIV C HVF028D OUTBD MSIV D HVF022A INBD MSIV A HVF022B INBD MSIV B HVF022C INBD MSIV C HVF022D INBD MSIV D B.

ENSURE conditions causing the Isolation have been corrected. ____

C. IF vacuum is > 21.5 inches Hg. Abs.,

THEN PLACE DIVISION 1 and 2 and 3 and 4 CONDENSER LOW VACUUM BYPASS Switches to BYP (Control Room Panels 10C609 and 10C611).

(continued on next page)

HC.OP-SO.SM-0001(Q)

Hope Creek Page 39 of 42 Rev. 17 5.3.2 (continued)

D.

PRESS the following PBs:

1.

NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC A RESET. MSIV TRIP LOGIC TRIPPED goes off.

2.

NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC B RESET. MSIV TRIP LOGIC TRIPPED goes off.

3.

NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC C RESET. MSIV TRIP LOGIC TRIPPED goes off.

4.

NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC D RESET. MSIV TRIP LOGIC TRIPPED goes off.

5.3.3.

To reset the Containment Isolation System, PERFORM the following:

A.

ENSURE conditions causing the Isolation have been corrected, AND NS4 has been reset.

B.

PRESS the following PBs:

1.

CNTMT ISLN MAN INITIATION CHANNEL A RESET.

TRIPPED goes off.

2.

CNTMT ISLN MAN INITIATION CHANNEL B RESET.

TRIPPED goes off.

3.

CNTMT ISLN MAN INITIATION CHANNEL C RESET.

TRIPPED goes off.

4.

CNTMT ISLN MAN INITIATION CHANNEL D RESET.

TRIPPED goes off.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 40 of 42 Rev. 17 5.3.4.

To reset the Core Spray Isolation Signals, PERFORM the following:

A.

ENSURE conditions causing Core Spray Initiation have been corrected.

B.

PRESS the following PBs:

1.

LOOP A INITIATION RESET. A INIT AND SEALED IN goes off.

2.

LOOP B INITIATION RESET. B INIT AND SEALED IN goes off.

3.

LOOP C INITIATION RESET. C INIT AND SEALED IN goes off.

4.

LOOP D INITIATION RESET. D INIT AND SEALED IN goes off.

5.3.5.

To reset the RHR Isolation signals, PERFORM the following:

A.

ENSURE conditions causing LPCI Initiation have been corrected. ____

B.

PRESS the following PBs:

1.

LOOP A INITIATION RESET. A INIT AND SEALED IN goes off.

2.

LOOP B INITIATION RESET. B INIT AND SEALED IN goes off.

3.

LOOP C INITIATION RESET. C INIT AND SEALED IN goes off.

4.

LOOP D INITIATION RESET. D INIT AND SEALED IN goes off.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 41 of 42 Rev. 17 NOTE Re-opening of containment isolation valves normally requires deliberate operator action on a valve by valve basis. Re-setting the following isolation signal will result in the automatic re-opening of containment isolation valve BJ-HV-F042 PMP SUCT FROM SUPP CHB IF a CST low level 103 - 10 (approx. 68,000 gal) OR Suppression Chamber high level (78.5 inches) (K42) exist AND BJ-HV-F042 handswitch is not in AUTO OPEN OVRD and no HPCI Div 1 Isolation signal (K51A) is present.

5.3.6.

To reset HPCI Isolation Signals, PERFORM the following:

A.

ENSURE conditions causing HPCI Isolation have been corrected. ____

B.

ENSURE the handswitchs for FD-HV-F002 INBD HPCI STM ISLN MOV AND FD-HV-F003 OUTB HPCI STM ISLN MOV are in CLOSE.

C.

INSERT key AND TURN to RESET, THEN RETURN to NORM on the following keyswitches:

1.

ISOLATION LOGIC A. ISLN LOGIC A TRIPPED goes off.

2.

ISOLATION LOGIC C. ISLN LOGIC C TRIPPED goes off.

5.3.7.

To reset RCIC Isolation Signals, PERFORM the following:

A.

ENSURE conditions causing RCIC Isolation have been corrected. ____

B.

ENSURE the handswitchs for FC-HV-F007 RCIC STM INBD ISLN VLV AND FC-HV-F008 RCIC STM OUTBD ISLN VLV are in CLOSE.

C.

INSERT key AND TURN to RESET AND THEN RETURN to NORM on the following keyswitches:

1.

ISOLATION LOGIC B. ISLN LOGIC B TRIPPED goes off.

2.

ISOLATION LOGIC D. ISLN LOGIC D TRIPPED goes off.

HC.OP-SO.SM-0001(Q)

Hope Creek Page 42 of 42 Rev. 17 6.0 RECORDS None

7.0 REFERENCES

7.1 Logic Diagrams:

  • J-10-0 Shts. 2, 4, 6, 7, 8, 13, 14, 15, 16, 17
  • J-11-0 Shts. 4, 6, 7, 8, 9, 19, 24
  • J-57-0 Shts. 2, 3, 4, 5, 12, 13, 14
  • H-83-0 Shts. 4, 6, 12, 14
  • H-84-0 Shts. 3, 4
  • H-87-0 Sht. 4
  • H-89-0 Shts. 5, 7, 10, 11
  • J-102-0 Shts. 1, 2, 3, 4, 5, 6, 7, 8, 9
  • J-105-0 Shts. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
  • J-107-0 Shts. 2, 3 7.2 Electrical Diagrams:
  • E-3133 Sht. 1, Sht. 2 7.3 Panel Drawings:
  • J-0650-1 Shts. 2, 3, 4, 5, 13, 14, 17, 18
  • J-0651-1 Shts. 2, 6, 8, 12 7.4 Other Documents
  • CR 990423133
  • CR971127121
  • 80007192
  • GEK-90300, Volume V, Part 1.