ML083450496

From kanterella
Jump to navigation Jump to search
License Amendment Request (LAR) H08-04
ML083450496
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/18/2008
From: Mulligan P
State of NJ, Dept of Environmental Protection
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LAR-H08-04
Download: ML083450496 (2)


Text

atnt of New Arne DESARTIEN OF ENVIROIINS L EPITON omn o~Rrnvlronmenta" ar a Tea m JON S. CORZINE LISA P. JACKSON Governor Radiation Protection and Release Prevention Element Commissioner Bureau of Nuclear Engineering PO Box 415 Trenton, New Jersey 08625-0415 Phone: (609) 984-7700 Fax: (609) 984-7513 November 18, 2008 United States Nuclear Regulatory Commission Document Control -Desk Washington, DC 20555-0001 Gentlemen:

Subject:

Hope Creek Generating Station (HCGS)

Docket No. 50-354 License Amendment Request,(LAR) H08-04 PSEG NuclearLLC (PSEG)ý submitted the subject, amendment:request to the-Nuclear Regulatory Commission (NRC)' on July 30, 2008. The proposed amendment would revise the applicable, Technical Specification Action statement by increasing the allowable outagetime from 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for one or two inoperable inverters in oneAC power distribution channel.

The New Jersey Department of Environmental Protection's Bureau of Nuclear Engineering reviewed the request in accordance with the requirements of 10 CFR 50.91(b). We have no comments.

If you have any questions; please contdct Jerry H~mphreys at-(609)984-7469:.: -

Sincerely, Patrick Mulligan Manager Bureau of Nuclear Engineering Ar-)0 New Jersey Is An Equal Opportunity Employer 0 Printedon Recycled Paper and Recyclable

c: P. Bauldauf, New Jersey DEP, Assistant Director N. McNamara, NRC Region I State Liaison Officer R. Ennis, NRC Hope Creek Project Manager B. Welling, NRC Senior Resident Inspector, Hope Creek M. Gaffney, PSEG Hope Creek Regulatory Assurance C. Neely, PSEG Director - Regulatory Assurance