Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000400/200800819 December 2008IR 05000400-08-008, on 09/22-26/2008 and 10/06-10/2008, Shearon Harris Nuclear Power Plant, Unit 1; Triennial Fire Protection InspectionSafe Shutdown
Fire Barrier
Enforcement Discretion
Operator Manual Action
Emergency Lighting
Significance Determination Process
Job Performance Measure
Hemyc
Continuous fire watch
Fire Protection Program
Manual Operator Action
ML08311049517 December 2008Issuance of Renewed Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit 1License Renewal
ML08312023717 December 2008Carolina Power & Light Company North Carolina Eastern Municipal Power Agency Docket No. 50-400 Shearon Harris Nuclear Power Plant, Unit 1 Renewed Facility Operating LicenseSafe Shutdown
Safeguards Contingency Plan
Fire Protection Program
ML08312024317 December 2008U.S. Nuclear Regulatory Commission Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1 Notice of Issuance of Renewed Facility Operating License No. NPF-63 for an Additional 20-Year Period Record of Decision Docket No.License Renewal
Press Release-08-226, NRC Approves License Renewal for Shearon Harris Nuclear Power Plant for an Additional 20 Years17 December 2008Press Release-08-226: NRC Approves License Renewal for Shearon Harris Nuclear Power Plant for an Additional 20 YearsLicense Renewal
HNP-08-121, Supplement 2 to Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)11 December 2008Supplement 2 to Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)
M091103, SRM-M091103B - Briefing on Fire Protection Lessons Learned from Shearon Harris10 December 2008SRM-M091103B - Briefing on Fire Protection Lessons Learned from Shearon Harris
ML09344125810 December 2008SRM-M091103B - Briefing on Fire Protection Lessons Learned from Shearon Harris
ML0832602619 December 2008Ria Regarding Relief Request 13R-02 for the Third Ten Year Inservice Inspection Interval
ML0830302284 December 2008G20080710/LTR-08-0546/EDATS: SECY- 2008-0599 - William J. Shack Ltr. Report on the Safety Aspects of the License Renewal Application for the Shearon Harris Nuclear Power Plant, Unit 1Aging Management
License Renewal
ML0833907094 December 2008Requalification Program Inspection - Shearon Harris Nuclear Plant
ML0834001814 December 2008NFPA 805 Pilot License Amendment Request Review and Infrastructure Update
HNP-08-118, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.7.5a, Ultimate Heat Sink Main Reservoir Minimum Level3 December 2008Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.7.5a, Ultimate Heat Sink Main Reservoir Minimum LevelUltimate heat sink
Coatings
B.5.b
Earthquake
ML1019402762 December 2008Nuclear Condition Report for Tritium in Groundwater
ML09002042030 November 2008NUREG-1916 Vol. 2, Safety Evaluation Report - Related to the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1.Boric Acid
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Aging Management
Stress corrosion cracking
Moisture barrier
License Renewal
Earthquake
Turbine Missile
Pressure Boundary Leakage
Fire Protection Program
Power Uprate
Thermal fatigue
ML09005017230 November 2008NUREG-1916, Volume 1, (1:2) Cover - Chpt 2, Safety Evaluation Report Related to the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1Safe Shutdown
Boric Acid
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
Emergency Lighting
Aging Management
Stress corrosion cracking
Moisture barrier
License Renewal
Earthquake
Fire Protection Program
Power change
ML09006073730 November 2008NUREG-1916, Volume 1, (2:2) Chpt 3 - End, Safety Evaluation Report Related to the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1Safe Shutdown
Boric Acid
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Stroke time
Weld Overlay
Coatings
Temporary Modification
VT-2
Aging Management
Local Leak Rate Testing
Foreign Material Exclusion
Flow Accelerated Corrosion
Stress corrosion cracking
Eddy Current Testing
Operability Determination
Moisture barrier
License Renewal
Maintenance Rule Program
Biofouling
Through-Wall Leak
Through-Wall Leakage
Fire Protection Program
Dissimilar Metal Weld
Eddy-Current Testing
Thermography
Thermal fatigue
TAC:MD433320 November 2008
ML08324021120 November 2008Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Transients
ML08319006218 November 2008Carolina Power and Light Company - Request for Withholding of Proprietary Information from Public DisclosureAffidavit
TAC:ME001218 November 2008
ML08296015317 November 2008Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment RequestProbabilistic Risk Assessment
Operator Manual Action
Emergency Lighting
Hemyc
Fire Protection Program
HNP-08-113, Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)14 November 2008Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)Operator Manual Action
Multiple Spurious Operation
Fire Protection Program
ML08309007412 November 2008Summary of Category 2 Public Meeting Held to Discuss National Fire Protection Association Standard 805 Pilot Plant Process: Current Lessons Learned from the Pilot License Amendment Request Reviews (TAC Nos. MD8807, MD8832, MD8833, & MD8834)Enforcement Discretion
Fire Protection Program
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28
ML0831106806 November 2008September 10, 2008, Generic Fundamentals Examination Section LetterGeneric Fundamentals Examination
ML0831809865 November 2008LTR-08-0587 - Ltr. William Shack, Summary Report - 556th Meeting of the ACRS, October 2-3, 2008, and Other Related Activities of the CommitteeHigh winds
Probabilistic Risk Assessment
Aging Management
License Renewal
Power Uprate
ML08308000531 October 2008Meeting Slides, Progress Energy Public Meeting, NRC Region II VisitB.5.b
License Renewal
Dissimilar Metal Weld
Power change
Siren
Power Uprate
ML08308000331 October 2008Summary of Public Meeting with Carolina Power and Light and Florida Power Corporation Regarding Organizational Alignment within the CompanyLicense Renewal
IR 05000400/200800430 October 2008IR 05000400-08-004, on 07/01/08 - 09/30/08, Shearon Harris Nuclear Power Plant, Unit 1; Access Controls to Radiologically Significant AreasBoric Acid
High Radiation Area
Fire Barrier
Weld Overlay
Hydrostatic
Locked High Radiation Area
Significance Determination Process
Operability Determination
Dissimilar Metal Weld
Substantial potential for an overexposure
Overexposure
HNP-08-099, Relief Request from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Service Water System24 October 2008Relief Request from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Service Water SystemTime of Discovery
Ultimate heat sink
Grab sample
Coatings
Functionality Assessment
Operability Determination
Through-Wall Leak
TAC:ME001324 October 2008
ML08297065816 October 2008G20080710/LTR-08-0546/EDATS: SECY-2008-0599 - Ltr., William J. Shack, Report on the Safety Aspects of the License Renewal Application for the Shearon Harris Nuclear Power Plant, Unit 1Weld Overlay
Aging Management
Moisture barrier
License Renewal
Power Uprate
HNP-08-098, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.14 October 2008Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.Operability Determination
Operability Assessment
ML08295048613 October 2008CFR 26 Unsatisfactory Fitness-For-Duty Program Blind Performance Testing Result
ML0828301376 October 2008License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26Safe Shutdown
Fitness for Duty