CAROLINA POWER & LIGHT COMPANY NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 RENEWED FACILITY OPERATING LICENSE Renewed License No. NPF-63
- 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for renewal of the license filed by the Carolina Power & Light Company (CP&L) for itself, and the North Carolina Eastern Municipal Power Agency (the licensee), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B.
Construction of the Shearon Harris Nuclear Power Plant, Unit 1, (the facility) has been substantially completed in conformity with Construction Permit No.
CPPR-158 and the application, as amended, the provisions of the Act, and the regulations of the Commission; C.
Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1); and (2) time-limited aging analysis that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations; D.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D. below);
E.
There is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below);
Renewed License No. NPF-63 F.
Carolina Power & Light Company is technically qualified to engage in the activities authorized by this license in accordance with the Commission's regulations set forth in 10 CFR Chapter I; G.
The licensees have satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; H.
The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public; I.
After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this Renewed Facility Operating License No.
NPF-63, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied; J.
The receipt, possession and use of source, byproduct and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40, and 70.
- 2.
Based on the foregoing findings and the Partial Initial Decisions issued by the Atomic Safety and Licensing Board dated February 20, 1985, August 20, 1985, December 11, 1985, and April 28, 1986, regarding this facility and pursuant to approval by the Nuclear Regulatory Commission at a meeting on January 8, 1987, Facility Operating License No. NPF-63, which supersedes the license for fuel loading and low power testing, License No. NPF-53 issued on October 24, 1986, is hereby issued to the Carolina Power & Light Company and the North Carolina Eastern Municipal Power Agency (the licensees) as follows:
A.
This license applies to the Shearon Harris Nuclear Power Plant, Unit 1, a pressurized water reactor and associated equipment (the facility) owned by the North Carolina Eastern Municipal Power Agency and the Carolina Power & Light Company, and operated by the Carolina Power & Light Company. The facility is located on the licensees' site in Wake and Chatham Counties, North Carolina, approximately 16 miles southwest of the nearest boundary of Raleigh, and is described in Carolina Power & Light Company's Final Safety Analysis Report, as supplemented and amended, and in its Environmental Report, as supplemented and amended; Carolina Power & Light Company is authorized to act for the North Carolina Eastern Municipal Power Agency, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
Renewed License No. NPF-63 B.
Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
(1)
Pursuant to Section 103 of the Act and 10 CFR Part 50, Carolina Power
& Light Company to possess, use, and operate the facility at the designated location in Wake and Chatham Counties, North Carolina, in accordance with the procedures and limitations set forth in this license; (2)
Pursuant to the Act and 10 CFR Part 50, North Carolina Eastern Municipal Power Agency to possess the facility at the designated location in Wake and Chatham Counties, North Carolina, in accordance with the procedures and limitations set forth in the license; (3)
Pursuant to the Act and 10 CFR Part 70, Carolina Power & Light Company to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, Carolina Power &
Light Company to receive, possess, and use at any time any byproduct, source and special nuclear material such as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, Carolina Power &
Light Company to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, Carolina Power &
Light Company to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility authorized herein; (7)
Pursuant to the Act and 10 CFR Parts 30 and 40, Carolina Power & Light Company to receive, possess and process for release or transfer to the Shearon Harris site such byproduct material as may be produced by the Shearon Harris Energy and Environmental Center; (8)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, Carolina Power &
Light Company to receive and possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the Brunswick Steam Electric Plant, Units 1 and 2, and H. B. Robinson Steam Electric Plant, Unit 2.
Renewed License No. NPF-63 C.
This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.
(1)
Maximum Power Level Carolina Power & Light Company is authorized to operate the facility at reactor core power levels not in excess of 2900 megawatts thermal (100 percent rated core power) in accordance with the conditions specified herein.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 127, are hereby incorporated into this license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
Antitrust Conditions Carolina Power & Light Company shall comply with the antitrust conditions delineated in Appendix C to this license.
(4)
Initial Startup Test Program (Section 14)1 Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.
(5)
Steam Generator Tube Rupture (Section 15.6.3)
Prior to startup following the first refueling outage, Carolina Power & Light Company shall submit for NRC review and receive approval if a steam generator tube rupture analysis, including the assumed operator actions, which demonstrates that the consequences of the design basis steam generator tube rupture event for the Shearon Harris Nuclear Power Plant are less than the acceptance criteria specified in the Standard Review Plan, NUREG-0800, at '15.6.3 Subparts II(1) and (2) for calculated doses from radiological releases. In preparing their analysis Carolina Power & Light Company will not assume that operators will complete corrective actions within the first thirty minutes after a steam generator tube rupture.
1The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Renewed License No. NPF-63 (6)
Detailed Control Room Design Review (Item I.D.1, Section 18)
Carolina Power & Light shall submit the final results of the control room surveys prior to startup following the first refueling outage.
(7)
Safety Parameter Display System (Section 18.2.1)
Carolina Power & Light Company shall submit to the NRC for review prior to startup following the first refueling:
(a)
The final Validation Test Report, (b)
The resolution of additional human engineering deficiencies identified on the safety parameter display system.
(8)
Deleted (9)
Formal Federal Emergency Management Agency Finding In the event that the NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Management Agency's final rule, 44 CFR Part 350, is an indication that a major substantive problem exists in achieving or maintaining an adequate state of emergency preparedness, the provisions of 10 CFR Section 50.54(s)(2) will apply.
(10)
Fresh Fuel Storage The following criteria apply to the storage and handling of new fuel assemblies in the Fuel Handling Building:
(a)
The minimum edge-to-edge distance between a new fuel assembly outside its shipping container or storage rack and all other new fuel assemblies shall be at least 12 inches.
(b)
New fuel assemblies shall be stored in such a manner that water would drain freely from the assemblies in the event of flooding and subsequent draining of the fuel storage area.
Renewed License No. NPF-63 (11)
Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a)
Fire fighting response strategy with the following elements:
- 1.
Pre-defined coordinated fire response strategy and guidance
- 2.
Assessment of mutual aid fire fighting assets
- 3.
Designated staging areas for equipment and materials
- 4.
Command and control
- 5.
Training of response personnel (b)
Operations to mitigate fuel damage considering the following:
- 1.
Protection and use of personnel assets
- 2.
Communications
- 3.
Minimizing fire spread
- 4.
Procedures for implementing integrated fire response strategy
- 5.
Identification of readily-available pre-staged equipment
- 6.
Training on integrated fire response strategy
- 7.
Spent fuel pool mitigation measures (c)
Actions to minimize release to include consideration of:
- 1.
Water spray scrubbing
- 2.
Dose to onsite responders D.
Exemptions The facility requires an exemption from Appendix E,Section IV.F.1, which requires that a full participation exercise be conducted within one year before the issuance of a license for full power operation. This exemption is authorized by law and will not endanger life or property or the common defense and security, and certain special circumstances are present. This exemption is, therefore, hereby granted pursuant to 10 CFR 50.12 as follows:
Shearon Harris Nuclear Power Plant, Unit 1, is exempt from the requirement of 10 CFR Part 50, Appendix E, Section IV.F.1 for the conduct of an offsite full participation exercise within one year before the issuance of the first operating license for full power and prior to operation above 5 percent of rated power, provided that a full participation exercise is conducted before or during March 1987.
The facility is granted an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50 (see SER Section 6.2.6). This exemption is authorized by law and will not endanger life or property or the common defense and security, and certain special circumstances are present. In addition, the facility was previously granted an exemption from the criticality alarm requirements of paragraph 70.24 of 10 CFR Part 70 insofar as this section applies to this license. (See License Number SNM-1939 dated October 28, 1985, which granted this exemption).
Renewed License No. NPF-63 E.
Physical Security (Section 13.6.2.10)
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: Guard Training and Qualification Plan submitted by letter dated October 19, 2004, Physical Security Plan and Safeguards Contingency Plan submitted by letter dated October 19, 2004 as supplemented by letter dated May 16, 2006.
F.
Fire Protection Program (Section 9.5.1)
Carolina Power & Light Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility as amended and as approved in the Safety Evaluation Report (SER) dated November 1983 (and Supplements 1 through 4),
and the Safety Evaluation dated January 12, 1987, subject to the following provision below.
The licensees may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G.
Reporting to the Commission Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, Carolina Power & Light Company shall report any violations of the requirements contained in Section 2.C of this license in the following manner:
initial notification shall be made within twenty-four (24) hours to the NRC Operations Center via the Emergency Notification System with written follow-up within 30 days in accordance with the procedures described in 10 CFR 50.73 (b),
(c) and (e).
H.
The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
I.
The Updated Safety Analysis Report supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the Updated Safety Analysis Report required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, CP&L may make changes to the programs and activities described in the supplement without prior Commission approval, provided that CP&L evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
Renewed License No. NPF-63 J.
The Updated Safety Analysis Report supplement, as revised, describes certain future activities to be completed prior to the period of extended operation.
Carolina Power & Light Company shall complete these activities no later than October 24, 2026, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
K.
All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation.
All capsules placed in storage must be maintained for future inspection. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
L.
This license is effective as of the date of issuance and shall expire at midnight on October 24, 2046.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Eric J. Leeds, Director Office of Nuclear Reactor Regulation Attachments/Appendices:
- 1. Appendix B - Environmental Protection Plan
- 2. Appendix C - Antitrust Conditions Date of Issuance: December 17, 2008 Renewed License No. NPF-63