Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML03003011931 December 2002Control Room Habitability Analysis for Design Basis Accidents - Tritium Production
ML02364031931 December 2002Topical Report WCAP-15984-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Sequoyah Units 1 & 2.Hydrostatic
Finite Element Analysis
ML04005008530 December 2002Final Exercise Report for Sequoyah Nuclear Power PlantHigh Radiation Area
ML03002003524 December 2002Notice Regarding Certain Implementation Actions Taken in Response to Interim Safeguards & Security Compensatory Measures at Browns Perry Nuclear Plant, Units 1, 2 & 3, & Sequoyah Nuclear Plant, Units 1 & 2
ML03161089924 December 2002Rev 3 to 24370-TR-C-002-A, Sequoyah Unit 1 Steam Generator Replacement Rigging and Heavy Load Handling Topical Report, Table of Contents Through Figure 1Safe Shutdown
Unanalyzed Condition
Boric Acid
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Tornado Missile Protection
Design basis earthquake
Large early release frequency
Earthquake
Control of Heavy Loads
ML03161090824 December 2002Rev 3 to 24370-TR-C-002-A, Sequoyah Unit 1 Steam Generator Replacement Rigging and Heavy Load Handling Topical Report, Attachment 1 Through Figure 3Safe Shutdown
Unanalyzed Condition
Boric Acid
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Finite Element Analysis
Design basis earthquake
Earthquake
Control of Heavy Loads
ML03014027023 December 2002Tennessee Storm Water Multi-Sector General Permit for Industrial Activities Permit No. TNR050000 Sector O Exceedance of the Monitoring Cut-off Concentration
ML02357036623 December 2002Forthcoming Meeting with TVA Regarding Steam Generator Compartment Roof Modification Topical Report Associated with Steam Generator Replacement at Sequoyah, Unit 1
ML02361022221 December 2002Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Sequoyah 1 and 2Probabilistic Risk Assessment
ML03010003020 December 2002Meeting Handout - SQN Project Plan 12/20/2002Shutdown Margin
Missed surveillance
ML03043059820 December 2002December 2002-301 Exam Administrative DocumentsBoric Acid
Job Performance Measure
IR 05000327/200230120 December 2002NRC Examination Reports 50-327/2002-301 and 50-328/2002-301, on December 2-6, 2002. Licensed Operator Examinations
ML02358023120 December 2002TVA Central Emergency Control Center - Emergency Plan Implementing Procedure (EPIP) RevisionsGrab sample
Hydrostatic
ML03051052220 December 2002Tennessee Valley Authority (TVA) - NRC Staff'S Findings of Fact and Conclusions of Law Concerning the Tennessee Valley Authority'S Violation of 10 C.F.R. 50.7
ML02364038420 December 2002Tennessee Valley Authority'S Posthearing Proposed Findings of Fact and Conclusions of Law
ML02364042020 December 2002Part 1 of 2, Attachment to Tennessee Valley Authority'S Posthearing Proposed Findings of Fact and Conclusions of Law
ML02364042220 December 2002Part 2 of 2, Attachments to Tennessee Valley Authority'S Posthearing Proposed Findings of Fact and Conclusions of LawEnforcement Discretion
ML02352017820 December 2002December 2002 Exam Post-Exam Comments - None
ML02364031319 December 2002Topical Report (WCAP-15984) for Technical Specification Change No. 00-14, Pressure Temperature Limits Report (PTLR) and Request for Exemption from the Requirements of 10 CFR 50, Appendix G, Enclosures 1 & 2
ML02353062819 December 2002Steam Generator Compartment Roof Modification Topical Report
ML02352063718 December 2002Meeting with TVA Steam Generator Compartment Roof Modification Topical Report Associated with the Steam Generator Replacement at Sequoyah, Unit 1
IR 05000327/200200718 December 2002IR 05000327-02-007, on 09/13 - 11/18-19/2002, Sequoyah, Units 1 & 2. Event Follow-Up. Non-Cited Violation NotedSignificance Determination Process
ML02352029616 December 2002Unsatisfactory Laboratory Result on Blind Performance Test SpecimenFitness for Duty
ML02353060816 December 2002Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs.Nondestructive Examination
TAC:MB592416 December 2002
ML02350033213 December 2002November 2002 Monthly Operating Report for Sequoyah Nuclear Power Plant
ML03014007911 December 2002Tennessee Valley Authority - Discharge Monitoring Report for Sequoyah Nuclear Plant
ML02345046610 December 2002Steam Generator Replacement Project - Topical Report No. 24370-TR-C-001, Alternate Rebar Splice - Bar-Lock Mechanical Splices, Response to NRC Request for Additional InformationCommercial Grade Dedication
ML0234305459 December 2002Notice of Meeting with Tennessee Valley Authority Re Status of Licensing Activities for Sequoyah Nuclear Plant, Units 1 & 2
ML0234501036 December 2002TVA Central Emergency Control Center (CECC) - Emergency Plan Implementing Procedure (EPIP) Revisions
ML0233807034 December 2002RAI, Unit 1 Steam Generator Replacement Topical Reports and Associated TS AmendmentSafe Shutdown
Ultimate heat sink
Commercial Grade Dedication
Finite Element Analysis
Design basis earthquake
Large early release frequency
Earthquake
Control of Heavy Loads
ML0234505594 December 2002February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing ExamGeneric Fundamentals Examination
ML02340056529 November 2002Summary of Meeting with TVA to Discuss Sequoyah Unit 1 Steam Generator Replacement
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02330056826 November 2002Notification of Sequoyah Nuclear Plant - Safety System Design and Performance Capability Inspection - NRC Inspection Report 50-327/2003-02 and 50-328/2003-02Probabilistic Risk Assessment
Temporary Modification
ML02325051621 November 2002RAI, Bulletin 2002-01 60-Day ResponsesBoric Acid
VT-2
TAC:MB266021 November 2002
ML02323019219 November 2002Summary of Public Meeting in Dayton Tennessee, Nrc'S Safety Evaluations of Tennessee Valley Authority'S License Amendment Request for Tritium Production at Watts Bar & SequoyahOpen House
ML02323032115 November 2002Technical Specification Change 02-06, Increased Condensate Storage Tank (CST) Minimum Volume.Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
TAC:MA657315 November 2002
ML02324031815 November 2002TVA - NRC Staff Response to October 24, 2002 Memorandum and Order
ML02337030015 November 2002Amended Discharge Monitoring Report (DMR) for August 2002
ML02329041015 November 2002Technical Specification (TS) Change 02-06, Increased Condensate Storage Tank (CST) Minimum Volume.Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
ML02329047715 November 2002Technical Specification Change 02-01: Nominal Trip Setpoints for Reactor Protection System (RPS) & Engineered Safety Features (ESF) Instrumentation & Relocation of Loss of Power & Radiation Monitoring Instrumentation Requirements
ML02322012215 November 2002Unit 2 - Technical Specification (TS) Change No. 02-03, Revision 1, License Amendment Request (LAR) to Support Unit 1 Generator Replacement ProjectSafe Shutdown
Ultimate heat sink
Safeguards Contingency Plan
Control of Heavy Loads
ML02323010215 November 2002Tennessee Valley Authority'S Response to the October 24, 2002, Memorandum and Order
ML02322011315 November 2002Units 1 and 2 - 10CFR 50.59, Changes, Tests and Experiments Summary ReportSafe Shutdown
Boric Acid
Post Accident Monitoring
ML02343002513 November 2002G20020651- Thomas Saporito Ltr 2.206 Sequoyah Unit 2, & San Onofre Units 2 and 3
ML03013018113 November 2002Discharge Monitoring Report for Sequoyah