Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML030030119 | 31 December 2002 | Control Room Habitability Analysis for Design Basis Accidents - Tritium Production | |
ML023640319 | 31 December 2002 | Topical Report WCAP-15984-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Sequoyah Units 1 & 2. | Hydrostatic Finite Element Analysis |
ML040050085 | 30 December 2002 | Final Exercise Report for Sequoyah Nuclear Power Plant | High Radiation Area |
ML030020035 | 24 December 2002 | Notice Regarding Certain Implementation Actions Taken in Response to Interim Safeguards & Security Compensatory Measures at Browns Perry Nuclear Plant, Units 1, 2 & 3, & Sequoyah Nuclear Plant, Units 1 & 2 | |
ML031610899 | 24 December 2002 | Rev 3 to 24370-TR-C-002-A, Sequoyah Unit 1 Steam Generator Replacement Rigging and Heavy Load Handling Topical Report, Table of Contents Through Figure 1 | Safe Shutdown Unanalyzed Condition Boric Acid High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Hydrostatic Tornado Missile Protection Design basis earthquake Large early release frequency Earthquake Control of Heavy Loads |
ML031610908 | 24 December 2002 | Rev 3 to 24370-TR-C-002-A, Sequoyah Unit 1 Steam Generator Replacement Rigging and Heavy Load Handling Topical Report, Attachment 1 Through Figure 3 | Safe Shutdown Unanalyzed Condition Boric Acid High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Hydrostatic Finite Element Analysis Design basis earthquake Earthquake Control of Heavy Loads |
ML030140270 | 23 December 2002 | Tennessee Storm Water Multi-Sector General Permit for Industrial Activities Permit No. TNR050000 Sector O Exceedance of the Monitoring Cut-off Concentration | |
ML023570366 | 23 December 2002 | Forthcoming Meeting with TVA Regarding Steam Generator Compartment Roof Modification Topical Report Associated with Steam Generator Replacement at Sequoyah, Unit 1 | |
ML023610222 | 21 December 2002 | Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Sequoyah 1 and 2 | Probabilistic Risk Assessment |
ML030100030 | 20 December 2002 | Meeting Handout - SQN Project Plan 12/20/2002 | Shutdown Margin Missed surveillance |
ML030430598 | 20 December 2002 | December 2002-301 Exam Administrative Documents | Boric Acid Job Performance Measure |
IR 05000327/2002301 | 20 December 2002 | NRC Examination Reports 50-327/2002-301 and 50-328/2002-301, on December 2-6, 2002. Licensed Operator Examinations | |
ML023580231 | 20 December 2002 | TVA Central Emergency Control Center - Emergency Plan Implementing Procedure (EPIP) Revisions | Grab sample Hydrostatic |
ML030510522 | 20 December 2002 | Tennessee Valley Authority (TVA) - NRC Staff'S Findings of Fact and Conclusions of Law Concerning the Tennessee Valley Authority'S Violation of 10 C.F.R. 50.7 | |
ML023640384 | 20 December 2002 | Tennessee Valley Authority'S Posthearing Proposed Findings of Fact and Conclusions of Law | |
ML023640420 | 20 December 2002 | Part 1 of 2, Attachment to Tennessee Valley Authority'S Posthearing Proposed Findings of Fact and Conclusions of Law | |
ML023640422 | 20 December 2002 | Part 2 of 2, Attachments to Tennessee Valley Authority'S Posthearing Proposed Findings of Fact and Conclusions of Law | Enforcement Discretion |
ML023520178 | 20 December 2002 | December 2002 Exam Post-Exam Comments - None | |
ML023640313 | 19 December 2002 | Topical Report (WCAP-15984) for Technical Specification Change No. 00-14, Pressure Temperature Limits Report (PTLR) and Request for Exemption from the Requirements of 10 CFR 50, Appendix G, Enclosures 1 & 2 | |
ML023530628 | 19 December 2002 | Steam Generator Compartment Roof Modification Topical Report | |
ML023520637 | 18 December 2002 | Meeting with TVA Steam Generator Compartment Roof Modification Topical Report Associated with the Steam Generator Replacement at Sequoyah, Unit 1 | |
IR 05000327/2002007 | 18 December 2002 | IR 05000327-02-007, on 09/13 - 11/18-19/2002, Sequoyah, Units 1 & 2. Event Follow-Up. Non-Cited Violation Noted | Significance Determination Process |
ML023520296 | 16 December 2002 | Unsatisfactory Laboratory Result on Blind Performance Test Specimen | Fitness for Duty |
ML023530608 | 16 December 2002 | Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs. | Nondestructive Examination |
TAC:MB5924 | 16 December 2002 | ||
ML023500332 | 13 December 2002 | November 2002 Monthly Operating Report for Sequoyah Nuclear Power Plant | |
ML030140079 | 11 December 2002 | Tennessee Valley Authority - Discharge Monitoring Report for Sequoyah Nuclear Plant | |
ML023450466 | 10 December 2002 | Steam Generator Replacement Project - Topical Report No. 24370-TR-C-001, Alternate Rebar Splice - Bar-Lock Mechanical Splices, Response to NRC Request for Additional Information | Commercial Grade Dedication |
ML023430545 | 9 December 2002 | Notice of Meeting with Tennessee Valley Authority Re Status of Licensing Activities for Sequoyah Nuclear Plant, Units 1 & 2 | |
ML023450103 | 6 December 2002 | TVA Central Emergency Control Center (CECC) - Emergency Plan Implementing Procedure (EPIP) Revisions | |
ML023380703 | 4 December 2002 | RAI, Unit 1 Steam Generator Replacement Topical Reports and Associated TS Amendment | Safe Shutdown Ultimate heat sink Commercial Grade Dedication Finite Element Analysis Design basis earthquake Large early release frequency Earthquake Control of Heavy Loads |
ML023450559 | 4 December 2002 | February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing Exam | Generic Fundamentals Examination |
ML023400565 | 29 November 2002 | Summary of Meeting with TVA to Discuss Sequoyah Unit 1 Steam Generator Replacement | |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023300568 | 26 November 2002 | Notification of Sequoyah Nuclear Plant - Safety System Design and Performance Capability Inspection - NRC Inspection Report 50-327/2003-02 and 50-328/2003-02 | Probabilistic Risk Assessment Temporary Modification |
ML023250516 | 21 November 2002 | RAI, Bulletin 2002-01 60-Day Responses | Boric Acid VT-2 |
TAC:MB2660 | 21 November 2002 | ||
ML023230192 | 19 November 2002 | Summary of Public Meeting in Dayton Tennessee, Nrc'S Safety Evaluations of Tennessee Valley Authority'S License Amendment Request for Tritium Production at Watts Bar & Sequoyah | Open House |
ML023230321 | 15 November 2002 | Technical Specification Change 02-06, Increased Condensate Storage Tank (CST) Minimum Volume. | Ultimate heat sink Safe Shutdown Earthquake Earthquake |
TAC:MA6573 | 15 November 2002 | ||
ML023240318 | 15 November 2002 | TVA - NRC Staff Response to October 24, 2002 Memorandum and Order | |
ML023370300 | 15 November 2002 | Amended Discharge Monitoring Report (DMR) for August 2002 | |
ML023290410 | 15 November 2002 | Technical Specification (TS) Change 02-06, Increased Condensate Storage Tank (CST) Minimum Volume. | Ultimate heat sink Safe Shutdown Earthquake Earthquake |
ML023290477 | 15 November 2002 | Technical Specification Change 02-01: Nominal Trip Setpoints for Reactor Protection System (RPS) & Engineered Safety Features (ESF) Instrumentation & Relocation of Loss of Power & Radiation Monitoring Instrumentation Requirements | |
ML023220122 | 15 November 2002 | Unit 2 - Technical Specification (TS) Change No. 02-03, Revision 1, License Amendment Request (LAR) to Support Unit 1 Generator Replacement Project | Safe Shutdown Ultimate heat sink Safeguards Contingency Plan Control of Heavy Loads |
ML023230102 | 15 November 2002 | Tennessee Valley Authority'S Response to the October 24, 2002, Memorandum and Order | |
ML023220113 | 15 November 2002 | Units 1 and 2 - 10CFR 50.59, Changes, Tests and Experiments Summary Report | Safe Shutdown Boric Acid Post Accident Monitoring |
ML023430025 | 13 November 2002 | G20020651- Thomas Saporito Ltr 2.206 Sequoyah Unit 2, & San Onofre Units 2 and 3 | |
ML030130181 | 13 November 2002 | Discharge Monitoring Report for Sequoyah |