SQN PROJECT PLAN Page 1 December 20, 2002 PRIORITY ISSUES ............................................................................................................................................................................. 2 INSPECTIONS .................................................................................................................................................................................... 3 M EETINGS IVISITS ............................................................................................................................................................................. 3 INPO INTERFACE MEETING SCHEDULE ........................................................................................................................................ 4 PENDING NRC ACTIONS .................................................................................................................................................................. 4 TECHNICAL SPECIFICATIONS ........................................................................................................................................................ 5 SUBM ITTALS ..................................................................................................................................................................................... 6 NRC COM MITM ENTS ...................................................................................................................................................................... 11 OPERATING EXPERIENCE POSTING ............................................................................................................................................ 12 INPO M EETINGSW ORKSHOPS ..................................................................................................................................................... 12 E-ncQ1os0-(6 2

SQN PROJECT PLAN Page 2 December 20, 2002 PRIORITY ISSUES

1. Steam Generator Replacement Project (TSs 02-02 & 02-03 & Topicals - Required by UIC12)
2. CST Minimum Volume Increase (TS 02 Required for UIC12)
3. PTLR (TS 00 Required by June 2003)
4. CILTR Extension (TS 02 Required for UIC12)
5. Limited Scope AST-FHA (TS 02 Required for UIC12)
6. Shutdown Margin Boron Change Relaxation (TS 01 Targeted for UIC12)
7. Tritium Production (TS 02-XX - Required for U2C12)
8. Ice Condenser Ice Weighing Methodology (TS 03-XX - Targeted for U2C12))
9. Dry Cask Storage (Expected Operational Spring 2004)
10. UHS (TS 03-XX - Support Peak Summer River Temperatures)
11. W-STAR Tube Sheet Inspection (TS 03-XX - Required for U2C12)
12. Source Range NIS SR Relaxation (TS 03-XX - Targeted for U2C12)

SQN PROJECT PLAN Page 3 December 20, 2002 INSPECTIONS INSPECTION DATE INSPECTION PROCEDURE I NRC CONTACT jiTVA CONTACT SSDPC Pre-inspection visit 01/08/03 - 01109/03 71111.21 Jim Moorman Proffitt/Lundy Flood Protection Measures 01/13/03 - 01/17/03 71111.06 Bob Carrion Proffitt/Carson SSDPC Inspection (6 inspectors) 02/10/03 - 02/14/03 71111.21 Jim Moorman Proffitt/Lundy 02/24/03 - 02/28/03 SGRP Inspection 03/16103-05/30/03 71111.08 Steve Vias Proffitt/Rausch Inservice Inspection (ISI) 03/24/03 - 03/28/03 71111.08 Bill Bearden Proffitt/Buchanan Radiation Protection Inspection 04/14/03-04/18/03 71121.01, 71121.02, Eldan Testa Proffitt/Kent 71122.02, & 71151 Radiation Protection Inspection 05/12/03-05/16/03 71114.02, 71114.03, Eldan Testa Proffitt/Kent 71114 04, 71114 05 & 71151 Heat Sink Inspection 07/07/03-07/11/03 71111.07B TBD Proffitt/Hilmes PI&R Inspection 07/14103-07/18/03 71152 TBD Proffitt/Hamilton 07/28103-08/01/03 __________________

Modifications/50.59 Inspection 08125/03-08/29/03 71111.02 & 71111.11B TBD ProffittlRogers Current Resident Inspection Period (IR 2002-005) I 09129/02 - 12/28/02 Various Norman Garrett Bajraszewski MEETINGSNISITS MILESTONE DATE CONTACT (NRC, TVA CONTACT INPO, NEIL, ANI)

"IVA/NRC - SGRP Splice Plate Concept Mtg @ Wash DC (8.30 am) December 23, 2002 Hernan Salas/Trudel NRC Residents Integrated Exit for IR 2002-005 @ SQN (1:00 pm) January 8, 2003 Garrett Bajraszewski SDP Worksheet Benchmarking Trip @ Corp January 13 - 17, 2003 Bernhard Brown/Justice TVA/NRC - SGRP Splice Plate Concept Mtg @ Wash DC (8.30 am) January 15, 2003 Anand Salas/Trudel INPO Assist Visit - Large Power Transformer Reliability (SOER 02- January 21 - 24, 2003 Sweet Watts/Clift

3) @ SQN INPO Assist Visit - Industrial Safety (SQN, WBN) @ SQN TBD Kassner Watts/Poe

SQN PROJECT PLAN Page 4 December 20, 2002 INPO INTERFACE MEETING SCHEDULE 1st Quarter 2003 2nd Quarter 2003 3rd Quarter 2003 Peer Team 4th Quarter 2002 BFN - TBD WBN - TBD Peer Team - TBD Operations SQN - 10/07/02 (C)

WBN - February 2003 (T) Peer Team - TBD SQN - TBD Maintenance & BFN - November 2002 (T)

Modifications SQN - 01/14/03 Peer Team - TBD WBN - TBD Engineering BFN - December 2002 (T)

WBN - March 2003 (T) BFN or SQN - TBD BFN or SQN - TBD Rad Chem Peer Team - 11/05/02 (C)

SQN - January 30, 2003 BFN - TBD WBN - TBD Scheduling Peer Team - 10/09/02 (C)

WBN - March 2003 (T) SQN - TBD Peer Team - TBD Licensing BFN - December 2002 (T)

Note: Annual Peer Team group visit should include mentor. C - Completed T - Target (Date Not Confirmed)

TVA SUBMITTAL NRC ISSUE NRC APPROVAL RESP TVA MGR PENDING NRC ACTIONS:

DATE DATE NEED DATE 08/10101, 7/31/02 TBD N/A Goodin/Lundy Relief Request - U1/U2 Cycle 10 Welds 03/19102 TBD U1C12 BajraszewskilTrudel Steam Gen Replacement Project - Bar-Lock Topical Report 03/28/02 TBD UIC12 Bajraszewski/Trudel Steam Gen Replacement Project - Splice Plate Topical Report 08/31101 TBD NIA Bajraszewski/Lundy Bulletin 2001-01, RPV Nozzle Cracks 04/02/02 TBD N/A Bajraszewski/Lundy Bulletin 2002-01, RPV Head Closure 04/15/02 TBD UIC12 Bajraszewski/Trudel Steam Gen Replacement Project - Heavy Loads Topical Report 09/11/02 TBD N/A Goodin/lundy Bulletin 2002-02, RPVNHP Inspection Program 01105 TBD - Goodin/Lundy 3 rd Interval ASME Update

SQN PROJECT PLAN Page 5 December 20, 2002 TECHNICAL SPECIFICATIONS TVA CONTACT LIC. POC SUBMITTAL FED REG TVA NEED DATE DATE DATE Lawrence/Smith Ludwig 03104102 04116102 12102 TS 01-03, Admin Section Changes (TSTF-299, Apply 25%

Extension to TS 6.8.4; TSTF-258 R4, OT, Shift Crews, etc.;

TSTF-308, Dose Accumulations)

Lundy Goodin 03129102 08106102 UIC12 TS 02-02, Steam Generator Replacement 10110/02 Bair Proffitt 07110102 08106102 ULC12 TS 01-09, SDM vs. No Positive Reactivity (TSTF 286 R2)

Burzynski Ferrell/Weller 09/03102 11114102 TS 02-04, Relaxation of Missed Surveillance Requirements (TSTF-358) (CLIIP) & Bases Control Program (TSTF-364)

Lundy Goodin 09106102 10129102 05103 TS 00-14, PTLR (TSTF 233, 243, 271 RI, 280 R1, 285 R1, 352 R1, 419) 12119102 Lundy Goodin 10/04102 N/A UIC12 TS 02-07, One Time CILTR Extension - Unit I and Update to Unit 2 TS 02-01, Nominal Trip Setpoint (TSTF 161, 355, & 365) Lundy Weller 11115102 N/A Lundy Goodin 07110102 12110102 UIC12 TS 02-03, R1, One-Time LAR for SGRP Rigging/Handling 11115102 Lundy Kitts 11115102 N/A UIC12 TS 02-06, CST Minimum Volume Increase Lundy Weller 12/02 N/A U1C12 TS 02-08, Limited Scope AST-FHA Lundy Kitts 01/03 N/A TS 00-10, Relax CLA AOT to 24 Hours (TSTF 370) (CLIIP)

Lundy Bajraszewski 01/03 N/A U2C12 TS 01-XX, Ice Condenser Ice Weighing Methodology (TSTF-429)

Lundy Goodin 01/03 N/A TS 02-XX, UHS Temperature Increase Lundy Weller 03/03 N/A TS 02-XX, DG 24 Hour Surveillance Change TS 02-XX, LTOP/PORV Upgrade Lundy/Smith Goodin 03103 N/A Salas Proffitt 03/03 N/A U2C12 TS 00-12, Source Range NIS SR Relaxation TS 00-07, Relax Remote Shutdown Action Salas Watts 03/03 N/A -

Lundy Weller 03/03 N/A U2C12 TS 02-XX, Relaxed Boron Requirements for Reduced TP Bar LoadingII

SQN PROJECT PLAN Page 6 December 20, 2002 TECHNICAL SPECIFICATIONS TVA CONTACT LIC. POC SUBMITTAL FED REG TVA NEED DATE DATE DATE Cothron Goodin 04/03 N/A U2C12 TS 03-XX, W-Star Permanent Application to Tube Sheet Inspection TS 02-XX, ECCS TS Improvement Lundy Weller 07/03 N/A -

TS 01-XX, Delete ABGTS 2000 CFM SR Lundy Kitts 07/03 N/A TS 03-XX, Instrumentation Relaxations - WCAPs 14333 & 15376 - Luncy Weller 09/03 N/A TSTFs -418 & 411 TS 01-XX, Implement NEI-97-06 on SG TSs Cothron Knuettel 11/03 N/A Lundy Kitts 11/03 N/A UIC13 TS 01-XX, Reduce RCP Flywheel Insp. (WOG) (TSTF 421)

SUBMITTALS - LOOK AHEAD DUE DATE AND INPUT DUE Description Input Resp Input Sch'd Actual Sch'd Actual Due Comment LIC Org Received Date to Date to Date to Date to Date ENG Due Concur Concur Signature Signature 11/22/02 OPS 12/06/02 12/13/02 12/17/02 "C" date WCL

1. OE - Hold Order 01/03/03 Issues Holding for MRC review of PER 12/04102 ENG 12120/02 12/22102 12124102 12/31/02 Due 12/31 KCW
2. MCR Habitability, sCy Dose Analysis -

Tritium 12120/02 ENGRJ 12120102 12104/02 01102103 01/03103 DVG

3. SGRP RAI 'C' Response - Balance SGRP
4. GFES Response 12/20/02 TRNG 12119102 12/23/02 12/20/02 01102/03 01103/03 JWP

'C'

SQN PROJECT PLAN Page 7 December 20, 2002 SUBMITTALS - LOOK AHEAD DUE DATE AND INPUT DUE Input Resp Input Sch'd Actual Sch'd Actual Due Comment LIC Description Due Org Received Date to Date to Date to Date to Date ENG Concur Concur Signature Signature 5 OE - Incorrect 12/18/02 TPS 12/26/02 01/02/03 01/06/03 WCL Bushing Torque Values OE - Work 12119102 MMG 12/17102 12/27102 01103/03 01107103 WCL 6.

Performed on Wrong Duct 12/13102 SEC 12113/02 12116102 12120102 01108103 01110/03 JWP

7. Security Order Updated Response 11/15/02 ENGR 12/04102 11122/02 12106102 01108103 01110103 For UIC12 KCW
8. TS 02-08 Limited SGRP Outage Scope AST-FHA 11127102 SGG 12/10/02 01/06/03 01/08103 01110/03 SLT 2002-04 DVG
9. Follow-up U2 90-Day SG Report Metallurgical Data 01/08/03 CRS 01/08/03 01/09/03 01/13/03 JWP 10 Security Allegation

Response

01/08/03 ENG/Civil 01/09/03 01/16/03 01/21/03 ZTK

11. NOV Response to IR 'C' 72-34/2002-001 -

ISFSI

12. OE - Temp Trailer 01/02/03 SGR 01/07/03 01/16/03 01/21/03 "C" date WCL Wiring Error 02/04/03 OE - Rigging Error 01/06/03 SGR 01113/03 01/20/03 01/22103 "C" date WCL 13 02/06/03 01/03/03 SGR 01/08/03 01/17/03 01/22/03 "C" date WCL 14 OE - Crane and Overhead Line 02105/03 Collusion 15 Bulletin 2002-01 RAI Response JIIIIIIIDVG 01/02/03 Corp/Eng 01/09/03 01/16103 01124/03 ETK/

SQN PROJECT PLAN Page 8 December 20, 2002 SUBMITTALS - LOOK AHEAD DUE DATE AND INPUT DUE Input Resp Input Sch'd Actual Sch'd Actual Due Comment LIC Description Received Date to Date to Date to Date to Date ENG Due Org Concur Concur Signature Signature LIC 01115103 01/29/03 01/31/03 CCTS DVG 16 TS 02-XX, UHS 10/25/02 ,C, Temperature Increase CIV 12118102 01115103 01/29/03 01131103 DVG

17. U1/U2 Cycle 11 01107103 Weld Relief Request Eng/Bop 01/22/03 01/29/03 01(31/03 Update of WCL
18. OE - CCW Screen 01/15/03 OE 14750 Wash Issues, R1 Radcon 02/19/03 02/26/03 02128/03 Prior to KCW
19. Annual Report 2002 02/14/03 'C' March 1 TS 6.9.1.5 LIC/ALL 02/19/03 02/27/03 03/03/03 JLW
20. INPO 6-Month 11/27/02

Response

LIC 02/01/03 03/12/03 03/14/03 JLW

21. TS 00-07, Relax 01/31/03 Remote Shutdown Action 01/31/03 ENG 02/01/03 03/12/03 03/14/03 KCW
22. TS 02-XX, Relaxed Boron Requirements for Reduced TP Bar Loading LIC/ENG 02/01/03 03/12/03 03/14/03 CLIIP ZTK
23. TS 00-10, Relax CLA 01/31/03

-LMN 5/31/02 AOT to 24 Hours LIC/ENG- 02101/03 03/12/03 03114/03 JB 24 TS 01-XX, Ice 01/31/03 Condenser Ice LMN Weighing Methodology LIC 02/01/03 03/12/03 03/14/03 JWP

25. TS 00-12, Source 01/31/03 Range NIS SR Relaxation

SQN PROJECT PLAN Page 9 December 20, 2002 SUBMITTALS - LOOK AHEAD DUE DATE AND INPUT DUE Description Input Resp Input Sch'd Actual Sch'd Actual Due Comment LIC Due Org Received Date to Date to Date to Date to Date ENG Concur Concur Signature Signature 26 Appendix R Manual 02/26/03 LIC/ENG 03/01/03 03/12/03 03/14/03 PER 02- JWP Actions Approval 3645 due Request date 4/18/03

27. TS 02-XX, ECCS TS 01/31103 ENGR - 02/01/03 03/12/03 03/14/03 KCW Improvement NSSS
28. TS 02-XX, DG 24 01/31/03 ENGR - 02/01/03 03/12/03 03/14/03 KCW Hour Surveillance ICE Change
29. TS 02-XX, 01124102 ENGRI 01/24/02 02/01103 03/12/03 03114103 DVG LTOPIPORV LIC Upgrade 30 TS 03-XX, W-Star 02/23/03 SGG 03/23/03 04/23/03 04/25/03' CCTS DVG ARC C', U2C12
31. Annual Radiological 04/12/03 ENV 04/19/03 04/26/03 04/28/03 Prior to JWP Environmental 'C' Mayl1- TS Operating Report 6.9.1.6
32. Annual Radioactive 04/12/03 RADCON 04/19/03 04/26/03 04/28103 Prior to JWP Effluent Release 'C' May 1 - TS Report 6 9.1.8
33. U2C11 SG 12-Month 04125/03 Corp SG 12/04102 04/30103 05/07103 05110103 DVG Report 'C'
34. OE - DG PCV 05/01/03 ENG/ICE 05/08/03 05/15/03 05/19/03 WCL Problems, R1
35. Updated 396 for MLP 05/12/03 TRNG 05/14/03 05/28/03 05/30/03 JWP

'C'

SQN PROJECT PLAN Page 10 December 20, 2002 SUBMITTALS - LOOK AHEAD DUE DATE AND INPUT DUE Description Input Resp Input Sch'd Actual Sch'd Actual Due Comment LIC Due Org Received Date to Date to Date to Date to Date ENG Concur Concur Signature Signature

36. Bulletin 2002-01 RV 06/01/03 ENGR 06/06/03 06/13/03 06/15/03 30 days post TK/

Head - 30 Day Unit 2 1C' restart JB

Response

37. Bulletin 2002-02, 06/04/03 ENGR 06106/03 06113/03 06/15/03 30-days DVG RPVNHP Unit 1 'C' post-restart Results 38 ISFSI Supplemental 106/27/03 Security 07/02/03 07/09/03 07/11103 POST JWP Order Response
39. TS 01-XX, Delete 06/03 ENGR / 06/03 07/03 07/03 ZTK ABGTS 2000 CFM LMN SR
40. Follow-up 90-Day SG 07/29/03 SGG 07/31/03 08114/03 08/16/03 DVG Report
41. TS 03-XX, 08/03 ENGR - 08/03 09/03 09103 KCW Instrumentation LEE/LMN Relaxations - WCAPs 14333 & 15376 TSTFs - XXX & 411 42 ECCS 50.46 Annual 10/31/03 ENGR 11/05103 11/08/03 11/14/03 Ref 10/24/02 KCW Report B380210248 05
43. TS 01-XX, Reduce 10/03 COMP- 10/03 10/03 11/03 Need ZTK RCP Flywheel ENG WCAP Inspection Frequency 15666 (WOG) TSTF-421
44. TS 01-XX, Implement 10/03 SGG 10/03 10/03 11/03 TEK NEI 97-06 on SG TSsI_1_ _1_1_1_1 1_1_1_1

SQN PROJECT PLAN Page 11 December 20, 2002 SUBMITTALS - LOOK AHEAD DUE DATE AND INPUT DUE Description Input Resp Input Sch'd Actual Sch'd Actual Due Comment LIC Due Org Received Date to Date to Date to Date to Date ENG SConcur Concur Signature Signature 45 Bulletin 2002-02, 12/04/03 ENGR 12/06/03 12/13/03 12/15/03 30-days DVG RPVNHP Unit 2 'C, post-restart ResultsI

46. OE - Fuel Failure, Ri 01/15/04 Rx Eng 01/22/04 01/27104 01/29/04 WCL
47. U1C1I 12-Month SG 05/04/04 SGG 05/06/04 05/15104 DVG

'C' Report 48 3r Interval ASME 10/04 ENGR / 10/04 12/04 12/04 DVG Update COMP

49. SQN Operating 11/30107 ENGR 12/07/07 12/27/07 12/31/07 Ref RIS ZTK License Renewal 2000-20 Application Advance NRC Notice NRC COMMITMENTS - TOTAL OPEN (21) - FOUR-WEEK LOOK AHEAD Originating Lead Closure Pkg TVA Due Lic Eng CCTS Document Coord. Due to Lic Date Commitment Description Number NCO010002002 TSC 01-07 JFT 10/21/02 01/31/03 TVA will submit a permanent TS change to address the DVG current UHS limit by January 2003 in order to support plant operation during the summer of 2003.

NCO020061001 TSC 00-06 DML 12/04/02 12/31/02 TVA will conduct control room habitability analysis for the KCW updated final safety analysis accident scenarios and provide the results including a tabulation of analysis inputs and assumptions used in sufficient detail to enable the NRC staff to evaluate

SQN PROJECT PLAN Page 12 December 20, 2002 OPERATING EXPERIENCE POSTING DATE IDENTIFIED RESPONSIBLE ORGANIZATION STATUS DESCRIPTION PER NUMBER 12/05102 MMG Input Required Work Performed on Wrong Duct 02-009464-000 12/09102 TPS Input Required Incorrect Bushing Torque Values 02-010000*000 02-010002-000 09/25102 RX ENG Expect Input 1115/04 Fuel Failure, R1 10104/02 OPS Input Required Hold Order Issues 02-012885-000 02-012966-000 10/08/02 ENG/ICE Expect input on 05/01/03 DG PCV Problems, RI 11/12/02 ENG/BOP Input Required CCW Screen Wash Issue, R1 02-014056-000 12116/02 SGR Input Required Temporary Trailer Wiring Error 02-015206-000 12/19/02 SGR Input Required Crane and Overhead Line Collision 02-015242-000 12/18/02 SGR Input Required Rigging Error 02-015262-000 INPO Meetings/Workshops information among nuclear personnel with similar concerns. These Working meetings focus on specific operational issues and are small-group forums for sharing provided to make you aware of upcoming meetings and to remind you meetings are held at INPO offices in Atlanta unless specified otherwise. This information is being of meetings that you are scheduled to attend.

Januay -'Date(s)

Participnt(s)ý 01(27/03 to 02/06/03 Standby Only Available Shift Manager Professional Development Seminar (SMPDS) 03-01-104 01/27/03 to 02/06/03 John Thomas Engineering Supervisor Professional Development Seminar (ESPDS) 03-01-60 01/27/03 to 02/06/03 Thompson Maintenance Supervisor Professional Development Seminar (MSPDS) 03-01-70

)Patcpn t(s)

FebruaryDt 2/09103 to 2/14/03 Poteet - Wait list Training Manager Professional Development Seminar (SMPDS)

Shift Manager Professional Development Seminar (SMPDS) 2/24103 to 3/06/03

SQN PROJECT PLAN Page 13 December 20, 2002 Plant Manager Working Meeting 02/26/03 to 02/27/03 Koehl March .... Dat )Participant(s)

Radiation Protection and Chemistry Supervisor Professional Development Seminar (RCPDS) (RC- 3/2/2003 to 3/7/2003 Cline 02-20)

New Training Manager Seminar 3/3/2003 to 317/2003 New Radiation Protection Manager Seminar 3/4/2003 to 3/6/2003 Chemistry Managers Working Meeting 3/11/2003 to 3/12/2003 Maintenance Ownership Working Meeting 3/11/2003 to 3/13/2003 SEE-IN Coordinators Working Meeting 3/18/2003 to 3/19/2003 Engineering Supervisor Professional Development Seminar (ESPDS) (03-03-62) 3/24/2003 to 4/3/2003 Standby Only Available Maintenance Supervisor Professional Development Seminar (MSPDS) (03-03-72) 3/24/2003 to 4/3/2003 Standby Only Available Radiation Protection Manager Working Meeting--at Grand Gulf 3/24/2003 to 3/26/2003 Shift Manager Professional Development Seminar (SMPDS) (03-03-105) 3/24/2003 to 4/3/2003 Standby Only Available Radiation Protection and Chemistry Supervisor Professional Development Seminar (RCPDS) (RC- 3/30/2003 to 4/4/2003 Standby Only Available 03-21)

April ate Participint(s)

Operations Manager Working Meeting 4/8/2003 to 4/912003 Nuclear Network Coordinators Working Meeting 4/10/2003 to 4/10/2003 Standby Only Available Operations Supervisor Development Seminar for Operators 4/14/2003 to 4/16/2003 Engineering Programs Meeting 4/15/2003 to 4/16/2003

SQN PROJECT PLAN Page 14 December 20, 2002 Operations Supervisor Development Seminar for Operators 4/21/2003 to 4/23/2003 Senior Nuclear Plant Management Course (SNPM) (03-02-66) 4/21/2003 to 5/23/2003 Standby Only Available Electrical Safety Working Meeting 4/24/2003 to 4/25/2003 Maintenance Supervisor Professional Development Seminar (MSPDS) (03-04-73) 4/27/2003 to 5/8/2003 Standby Only Available Engineering Supervisor Professional Development Seminar (ESPDS) (03-04-63) 4/28/2003 to 5/8/2003 Standby Only Available Operations Supervisor Development Seminar for Operators 4/28/2003 to 4/30/2003 Shift Manager Professional Development Seminar (SMPDS) (03-04-106) 4/2812003 to 5/1/803 Standby Only Available Training Supervisor Professional Development Seminar (TSPDS) (T-02-1 1) 4/28/2003 to 5/2/2003 Sanders Fulghum - Waitlist Poteet - Waitlist Pressurized Water Reactor (PWR) Chemistry Managers Working Meeting 4/30/2003 to 5/1/2003 Further information regarding INPO meetings can be obtained at the INPO web site. If you are already scheduled to attend one of these meetings and your name does not appear in the Attending column, please contact Industry Affairs (Jerry Watts, ext. 7271) to have your name added. If the field is blank and you would like to attend, INPO can be contacted to see if a vacancy exists. INPO contacts for meetings and workshops can be found on INPO's web site or you can contact Jerry Watts.