Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML02343054331 December 2002Reactor Vessel Head Damage, NRC Update, December 2002Boric Acid
Pressure Boundary Leakage
ML03008008831 December 2002Industrial Security Plan (Revision 21/Change 2)
ML03007003031 December 2002Comment from Raymond Shadis, New England Coalition on Nuclear Pollution on the Third Year of Implementation of the Reactor Oversight ProcessBoric Acid
Significance Determination Process
ML03007060030 December 2002Nrc'S Regulation of Davis Besse Regarding Damage to Reactor Vessel Head (Case No.02-03S)Boric Acid
Non-Destructive Examination
Probabilistic Risk Assessment
Fuel cladding
Pressure Boundary Leakage
ML03069065829 December 2002Tom Gurdziel Letter Number 18 Davis-Besse IMC0350 Oversight Panel Activities
ML03007050927 December 2002Results of the Davis Besse Nuclear Power Station Unit 1 SDP Phase 2 Notebook Benchmarking VisitInternal Flooding
Significance Determination Process
ML07005007726 December 2002Letter Dated 12/26/2002 from Orise to John Grobe; Calculational Methodology for the Davis Besse Internal Dose Reconstruction Task
ML02010036626 December 2002Exemption from Requirements of 10 CFR Part 50, Section Iii.G of Appendix RSafe Shutdown
Fire Barrier
Exemption Request
Fire Protection Program
ML02360026724 December 2002Letter Dated 12/24/2002: Davis-Besse Confirmatory Action Letter 3-02-001A and 3-02-001Boric Acid
ML03009034723 December 2002Transcript of 12/23/2002 Public Meeting Between NRC & Firstenergy Nuclear Operating Co. Davis-BesseSafe Shutdown
Large early release frequency
ML03240035723 December 2002Public Meeting Presentation Slides
ML02357036923 December 2002Request for Additional Information on Safety Features Actuation Signal (Sfas)/Steam and Feedwater Rupture Control System (Sfrcs) Amendment RequestProbabilistic Risk Assessment
ML02360024521 December 20027 - Notice of Public Meeting to Present to the Local Public the Status of the Nrc'S Oversight Panel Activities for the Davis-Besse Nuclear Power Station
ML02360023721 December 20022 Pm Notice of Public Meeting Between NRC and Firstenergy Nuclear Opearting Company to Discuss Licensee Performance and Progress on the Return to Service Plan - Davis-Besse Nuclear Power Plant
ML02360019921 December 2002Letter of Notice for Public Meeting Between Firstenergy Nuclear Operating Company and NRC Davis-Besse Nuclear Power Station
ML02358014720 December 2002License Amendment Application to Revise Station Review Board Name & Revise Regulatory Guide 1.33 Version Reference in (License Amendment Request No. 02-0007)Offsite Dose Calculation Manual
Process Control Program
ML02276020220 December 2002G20020314/LTR-02-0372 - David Lochbaum Ltr Re Follow-up on the May 1, 2002 Commission Briefing on the Reactor Oversight Program - Davis-BesseBoric Acid
TAC:MB168920 December 2002
ML02358014820 December 2002Withdrawal of License Amendment Requests 97-0007, 97-0012, & 01-0005
ML02360004320 December 2002Request to Postpone 2003 License Examination to Better Support Restart Effort at Davis-Besse Nuclear Power Station
ML02358016020 December 2002Withdrawal of 10CFR 50.55a Requests for Alternatives for Davis Besse Nuclear Power Station(RR-A20, RR-A21, RR-A22, RR-A23, RR-A24, & RR-A25)
TAC:MB517620 December 2002
ML04299025319 December 2002Investigation Summary CR 02-03668
ML03016063819 December 2002Y020020292/Y020020293 - Incoming E-mail Dated 12/19/02 from Mike Mulligan Response to Previous Concern About SRV Leakage, Excessive Safety Equipment Operation at LaSalle
Press Release-III-02-067, NRC Oversight Panel to Meet with Firstenergy in Lisle, Il, to Discuss the Systems Health Assurance Plan at Davis-Besse19 December 2002Press Release-III-02-067: NRC Oversight Panel to Meet with Firstenergy in Lisle, Il, to Discuss the Systems Health Assurance Plan at Davis-Besse
ML04299024719 December 2002Cause Analysis CR 02-03668
ML03069065716 December 2002Tom Gurdziel Letter Number 17 Davis-Besse IMC0350 Oversight Panel ActivitiesFitness for Duty
ML02352051216 December 2002Minutes of Internal Meeting of the Davis-Besse Oversight Panel
ML02352050116 December 2002Minutes of Internal Meeting of the Davis-Besse Oversight Panel
ML02241030816 December 2002G20020265/LTR-02-0323 - Rep. Edward J. Markey and Rep. Marcy Kaptur Ltr Safety Issues at Davis-Besse Nuclear Power Plant - Licensee Inspections and Safety Procedures
ML02352052416 December 2002Minutes of Internal Meeting of Davis-Besse Oversight PanelCondition Adverse to Quality
Exemption Request
Flow Induced Vibration
ML02354016316 December 200201/14-16/2003 Invitation to Region IV Resident Counterpart Meeting
ML02347018113 December 2002Meeting Letter to Firstenergy Nuclear Operating Co. Public Meeting - System Health Assurance Plan Expansion as Part of Implementation of Nrc'S Inspection Manual Chapter (IMC) 0350
ML02347019813 December 2002Notice of Public Meeting Between Firstenergy Nuclear Operating Company and NRC Discuss Licensee'S System Health Assurance Plan Expansion
ML02350001212 December 2002November 2002 Monthly Operating Report for Davis Besse, Unit 1Boric Acid
ML02360048812 December 2002Revisions to Emergency Plan Implementing Procedures, Including Rev 0 to RA-EP-02550, Offsite Personnel & Vehicle Monitoring & Decontamination.Grab sample
ML02360011312 December 2002November 2002 Monthly Operating Report for Davis-Besse Nuclear Power StationBoric Acid
ML03021022910 December 2002Addendum to Davis-Besse Nuclear Power Station 2001 Annual Radiological Environmental Operating Report & Radiological Effluent Release ReportSafe Shutdown
Boric Acid
High winds
Grab sample
Offsite Dose Calculation Manual
Zebra Mussel
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
Chernobyl
Fuel cladding
Tritium
ML02364017710 December 20022pm Transcript of Public Meeting Between NRC and Firstenergy Nuclear Operating Company Davis-Besse Return to Service PlanSafe Shutdown
Boric Acid
Past operability
Coatings
Nondestructive Examination
VT-2
Pressure Boundary Leakage
ML02364021210 December 20027 Pm Transcript of Public Meeting Davis-Besse Oversight Panel ActivitiesBoric Acid
Open House
Chernobyl
ML02352058210 December 2002Davis-Besse's Return to Service Plan UpdateBoric Acid
Coatings
IR 05000346/20020179 December 2002IR 05000346-02-017, Firstenergy Nuclear Operating Company, on 10/01-11/14/2002, Davis-Besse Nuclear Power Station, Identification and Resolution of Problems, Other ActivitiesBoric Acid
Fire Barrier
Stroke time
Past operability
Nondestructive Examination
Condition Adverse to Quality
Significance Determination Process
Code Reconciliation
Fire Watch
ML0234301119 December 20027 Pm Agenda for Public Meeting of the NRC Davis-Besse Oversight Panel
ML0306906567 December 2002Tom Gurdziel Letter Number 16 Davis-Besse IMC0350 Oversight Panel Activities
IR 05000346/20000076 December 2002E-mail Apologizing for Delay in Closure of Issue URI 50-346/2000007-06
ML0233107236 December 2002Response to Request for Technical Assistance - Risk Assessment of Davis-Besse Reactor Head Degradation (TIA 2002-01)Boric Acid
Weld Overlay
Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
Pressure Boundary Leakage
ML0234400126 December 2002Revision to 10 CFR 50.55a Request RP-3 and Submittal of 10 CFR 50.55a Request RP-5 for the Davis-Besse Third Ten-Year Interval Inservice Testing Program
ML0234301025 December 2002NRC Handout for Public Meeting Between NRC Oversight Panel & Firstenergy Nuclear Operating CoBoric Acid
ML0234300955 December 20022:00 Pm Agenda for Public Meeting Between NRC and Firstenergy Nuclear Operating Co. to Discuss Licensee'S Progress on Implementing the Return to Service PlanBoric Acid
ML0306906555 December 2002Tom Gurdziel Letter Number 15 Davis-Besse IMC0350 Oversight Panel ActivitiesBoric Acid