ML023520524

From kanterella
Jump to navigation Jump to search
Minutes of Internal Meeting of Davis-Besse Oversight Panel
ML023520524
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/16/2002
From: Grobe J
NRC/RGN-III
To:
References
FOIA/PA-2005-0261
Download: ML023520524 (11)


Text

December 16, 2002 MEMORANDUM TO: Davis-Besse Nuclear Power Station IMC 0350 Panel FROM: John A. Grobe, Chairman, Davis-Besse Oversight Panel /RA/

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE OVERSIGHT PANEL The implementation of the IMC 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held on December 3, 2002. Attached for your information are the minutes from the internal meeting of the Davis-Besse Oversight Panel and the Open Action Items List.

Attachments: As stated cc w/att: S. Rosenberg, OEDO W. Dean, NRR A. Mendiola, NRR D. Pickett, NRR S. Bloom, NRR J. Dyer, RIII J. Caldwell, RIII G. Grant, RIII S. Reynolds, RIII C. Lipa, RIII D. Hills, RIII D. Passehl, RIII D. Simpkins, RIII J. Jacobson, RIII S. Burgess, RIII R. Lickus, RIII S. Thomas, RIII M. Holmberg, RIII J. Collins, RIII DB0350

MEMORANDUM TO: Davis-Besse Nuclear Power Station IMC 0350 Panel FROM: John A. Grobe, Chairman, Davis-Besse Oversight Panel

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE OVERSIGHT PANEL The implementation of the IMC 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held on December 3, 2002. Attached for your information are the minutes from the internal meeting of the Davis-Besse Oversight Panel and the Open Action Items List.

Attachments: As stated cc w/att: S. Rosenberg, OEDO W. Dean, NRR A. Mendiola, NRR D. Pickett, NRR S. Bloom, NRR J. Dyer, RIII J. Caldwell, RIII G. Grant, RIII S. Reynolds, RIII C. Lipa, RIII D. Hills, RIII D. Simpkins, RIII J. Jacobson, RIII K. Riemer S. Burgess, RIII R. Lickus, RIII S. Thomas, RIII M. Holmberg, RIII J. Collins, RIII DB0350 DOCUMENT NAME: G:\Davis-Besse 0350\internalmtgminutes\internalmtgminutes1203.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII RIII NAME DPassehl/klg CLipa JGrobe DATE 12/05/02 12/05/02 12/16/02 OFFICIAL RECORD COPY

MEETING MINUTES: Internal IMC 0350 Oversight Panel Meeting Davis-Besse Nuclear Power Station DATE: December 3, 2002 TIME: 1:00 p.m. Central ATTENDEES:

C. Lipa M. Holmberg S. Thomas A. Mendiola J. Hopkins D. Passehl J. Jacobson D. Simpkins Agenda Items:

1. Plant Status and Inspector Insights The Panel discussed the status of the draft Task Interface Agreement (TIA) submitted to NRR related to potentially nonconservative Technical Specification (TS) requirements associated with minimum trisodium phosphate dodecahydrate (TSP) inventory and maximum allowable unidentified leakage.

S. Thomas briefed the Panel on current site activities:

C Reactor coolant pump overhaul and emergency core cooling system sump work were underway. Drain-down of the reactor coolant system was completed to support refurbishment of 74 ECCS valves and to support the reactor coolant pump work.

C An update of major milestones was provided:

Begin core reload: 1/13/03 Mode 5: 1/18/03 ILRT: 1/25/03 Mode 4: 1/29/03 Mode 3: 1/31/03 Cooldown to Mode 4/5 (for Inspection): 2/6/03 NRC Restart Approval: 2/10/03 Mode 3: 2/17/03 Mode 2: 2/18/03 Mode 1: 2/19/03 100% Power: 2/21/03 Scott mentioned that the above dates do not incorporate the the decay heat pit design delays which could easily push all the Mode 4 dependent dates out at least a month.

C There was an emergent issue regarding the licensees discovery of a crack in at least one of four thermal sleeves that extends into the Reactor Coolant Pump

discharge piping. Possible causes were believed to be thermal fatigue or flow induced vibration or some combination. The licensee intends to replace the thermal sleeves. The licensee discovered this issue while performing inspections during deep drain valve work. A Region III DRS inspector was asked to assist in the followup of this issue.

C Scott reported that the licensee had a significant number of condition reports classified as "significant condition adverse to quality" that were past due for completion of their root cause evaluations. The licensees process for requesting extensions for completing the evaluations appears weak and was not followed in many instances.

C Scott reported on the status of system reviews. The licensee was supposed to complete all 31 system reviews (discovery) by December 6, 2002. The present status of the review were: six complete, 17 having been presented to the Engineering Assessment Board (EAB) for comments, and 8 that were not completed to the stage of being reviewed by the EAB. The plan for the eight remaining systems was to revise the review process, to not require EAB review, and to simplify the validation process (the actual details of the simplification still had not been firmed up). The Panel was planning to do further followup on the licensees rational and ramifications for not sending the systems through the EAB.

Review of action items (panel)

The panel reviewed the list of open action items, with discussions and actions as follows:

Item 26 was closed. Letter issued 11/27/02.

Item 72 was closed.

Item 73 was discussed. NRR desires to have a revised IMC 0350 procedure issued by the end of this calendar year. NRR members of the panel took action to discuss the procedure with the procedure owners in NRR.

Item 74 was discussed. The subject matrix document remains incomplete/unofficial, but progress on completing it continues.

Item 85 was discussed. Region III received a letter dated 11/5/02 from J. Zwolinski related to the Davis-Besse Reactor Pressure Vessel Head. The letter regarding the release of the Davis-Besse head stated that "With regard to the Phase 3 sample....we will forward to you, at a future date, if any further actions are required." A followup email was received from J. Zwolinski on 11/13/02 stating that the aforementioned phrase was not intended to mean that the licensee hold the Phase 3 samples any longer than they would otherwise hold them or that they receive NRC permission prior to disposing of the samples. In order to avoid confusion when the "official" letter is sent to the licensee from Region III, J. Zwolinski requested that the sentence be re-worded to state that "The Phase 3 samples are also removed from the quarantine provisions." Region III will ensure that the letter to the licensee reflects the re-wording.

Item 88 was discussed. TIA 200201, "Response to Request for Technical Assistance -

Risk Assessment of Davis-Besse Reactor Head Degradation (ADAMS Accession No. ML023310723) was the current version of the TIA. A conference call to discuss the TIA was scheduled for later today.

Item 89 was closed. The requested input was received and incorporated into USNRC Inspection Report 50-346/02-07, issued on November 29, 2002.

Item 107 was discussed. J. Grobe at a prior meeting presented a draft paper discussing the issue of adding "incomplete and inaccurate information" for records and communications accuracy to the restart checklist. The Panel considered the points made and a decision on adding the item was tabled for further consideration.

Item 112 was closed. Future ROP dates are: 12/9, 1/13, 2/10, 3/10.

Item 114 was closed. No new news on a potential site visit by Brian Sheron.

Item 116 was closed. This item will be tracked by Item 107.

Item 119 was closed. The specific review was completed and an 11/19 email was sent discussing the Panels review of the AIT followup report.

Item 121 was discussed. The Panel discussed getting input from NRR via a memo or other following the 11/26 public meeting with the licensee regarding NRRs assessment of the appropriateness or reasonableness of the licensees plans for inspecting the bottom head of the reactor vessel.

Item 124 was closed. 11/19 email sent discussing the DBOP review of the AIT followup report (50-346/02-08)

New Issues for Inclusion into the Restart Action Matrix The Panel discussed the work on a draft procedure for adding/removing items from the RAM. D. Passehl added Item C-25 to the RAM regarding the licensees plans for perform a test during normal operating pressure and temperature (NOP/NOT) conditions to evaluate potential leakage from nozzles on the reactor bottom head. A public meeting was held in Headquarters on 11/26 on this topic.

Licensing Issues/Actions (DLPM) - status sheet The status of Davis-Besse licensing activities and ticket tracking was presented by J.

Hopkins. The licensee Code exemption requests, needed for use of the Midland reactor vessel head at Davis-Besse, have been reviewed by NRR technical staff and safety evaluations have been prepared. NRR is evaluating recent allegations of non-conforming conditions with the new head before signing out the Safety Evaluations.

Items for Licensee Weekly Calls

The Panel discussed questions/concerns for the licensee to address during the upcoming weekly call with the licensee.

Milestones/Commitments The Panel discussed upcoming milestones and commitments.

IMC 0350 Oversight Panel Action Items Item Action Item (Date Assigned to Comments Number generated) 24a Discuss making Panel Discuss by June 30, after safety information related to significance assessment complete.

HQ/licensee calls publicly 6/27 - Invite Bateman to panel mtg.

available To discuss what else is needed to closeout the CAL (i.e. quarantine plan). 7/2 - NRR not yet ready to discuss. 7/16 - See if procedures have changed on CAL closeout -

does JD need to send letter? 7/18

- Discussed - is there an applicable regional procedure? 8/6 -

Discussed. Need to determine the final approach on the core removed from the head and the final approach on the head before the quarantine can be lifted. 8/22 -

Revisit action item after letter sent to licensee confirming plans with old vessel head (head may be onsite longer than originally anticipated) 8/29 - Memo to be sent to Region, with a letter to go out next week. 10/01- Discussed.

1) Conduct NRC staff survey-due 10/7 2)Memo to NRR - due 10/11
3) Region to issue letter 11/07-Letter required from NRR on head quarantine status. 11/19 - Letter in draft 26 Provide licensee with Panel/ 7/16 - pending 7/18 - J. Jacobson inspection schedule D Passehl working - will follow issuance of restart checklist. Est due date 8/2 to include scheduled and TBD inspections. 8/22 - System health dates now set - will likely send out schedule next week. 8/27 -

Discussed - on track to send out next week. 8/29 - discussed, on track. 10/1 - Discussed. Issue schedule 11/7 - D Passehl to draft an inspection schedule letter.

11/19 - Letter in draft. 12/3 - Letter issued 11/27/02.

Item Action Item (Date Assigned to Comments Number generated) 54a Review TSP amendment D. Pickett 7/9 - Discussed. Will wait for and advise the panel on response from licensee. 7/16 -

the need for a TIA on Discussed - added action item 54b.

Davis-Besse (7/2) 8/6 - Sent to the licensee on7/22 and a response is due by 8/22.

8/22 - Discussed - need to check if response has been received. 8/27

- Received response - DRS is reviewing - will fax to NRR for 54b.

8/29 - Discussed, DRS report of response to be issued to panel prior to item 54b. 10/1-Discussed.

DRS coordinating with NRR 11/07-Discussed - On hold for draft with specific information.

54b Initiate correspondence T. Mendiola 7/18 - Memo will be sent to w/NRR to evaluate generic Hannons group. 8/6 - Discussed -

implications (7/16) not yet issued. 8/13 - Discussed -

need info from 54a first. 10/1 -

Discussed. Forward to B. Bateman

- due 10/18.

72 Review LLTF observations Lipa/Passehl 8/13 - Discussed. Items reviewed and determine appropriate for allegations. No new allegations closeout. (8/6) Review for identified. Info related to ongoing safety issue/ AMS/OI/new investigations will be forwarded to items. OI. 8/22 - Discussed - need to keep this item open as a reminder to consider outstanding LLTF items. 8/29 - Discussed - leave open. 12/3 - Closed.

73 Send feedback form on Lipa 8/6 - Generate feedback after IMC 0350 procedure to Mendiola panel meetings reduced to once IIPB (8/6) per week. 8/29 - Discussed - no change. 10/1 - Discussed. 11/7 -

D Passehl sent email to C Carpenter and D Coe indicating that we would be able to perform a review of the draft IMC 0350 during the first quarter of 2003.

12/3- discussed.

Item Action Item (Date Assigned to Comments Number generated) 74 Matrix strategy for UCS Lipa 8/13 - Discussed. 8/22 -

and other requests. (8/8) Discussed - matrix is being developed will send out for review when ready. 8/29 - Discussed -

matrix has been started. 10/1&

10/15 Discussed. 11/07 - A top ten list will be created to prioritize strategy.

83 Verify results of ongoing Panel Longer term item research related to the Coffin technical root cause evaluation has not changed NRC/DE conclusions (8/13) 85 Send letter/action plan to Dean (DE) 8/22 - Discussed - NRR will send the licensee regarding Hopkins draft to RIII by 8/30. 8/27 -

actions required to be Discussed - letter being drafted completed to close CAL and should be ready next week.

item related to quarantine 9/19- On hold due to crack - get (8/20) letter out to licensee re: from Mode 3 to Mode 2. 10/8 - Discussed.

Memo is with Mendiola at the start of concurrence review. 10/15 -

Discussed. 12/3 - memo received 11/15.

88 Develop draft proposal on Burgess 8/27 - Working to a due date of how to assess 8/30 to present to the panel next significance/respond to week. 10/1 - Discussed. 11/07 -M.

TIA (8/20) Reinhart rewriting draft. Due from NRR to RIII 11/30. 12/3 -

Discussed.

89 Provide report input on R. McIntyre Will be feeder to Mels need for Framatome inspection of M. Holmberg 9/17 public mtg. 9/17 - Plan to records for the new vessel send this week to Mel. 9/24 -

head (8/27) Report expected out next week.

10/8 - Discussed. Feeder report had been received, Mendiola to review. 11/07 - Feeder report up to T. Quay for concurrence. 12/3 -

IR 02-07 issued 11/29.

91 Call McClosky to discuss Lipa 9/17 - Called - need to check back.

docketing Return to 10/1 - Discussed. Jack to discuss Service Plans (9/3) with L. Myers

Item Action Item (Date Assigned to Comments Number generated) 95 Interpret CAL & TS and Lipa 10/1 - Discussed. 11/19- Will be define which mode change Thomas defined as Mode 2 in CAL update needs approved (9/5) letter 97 Bulletins 2002-01 and NRR 11/07 - Discussed, further 2002-02 response and research and discussion required.

acceptance (9/5) 99 Bring to panel all Jacobson/ 9/24 - Decision for C. Lipa to 95002/95003 attributes Lipa discuss item with J. Jacobson.

(9/5) 10/1 - Discussed. Due 10/11.

10/15 - Discussed. 11/07 - RAM item inclusion for discussion at 11/19 panel meeting 10/1-Discussed 11/07 - Report discussed. D. Simpkins to When AIT F/U IR is determine if item 6 will be followed issued, consider item on 107 Panel up by OI. D.Passehl will inform OI records& communication panel has reviewed items and sees accuracy (9/17) no further need for follow up actions on items 5 & 6 10/1- Discussed. 10/8 - Dates for Oct. 16 & Nov. 13 final, working on Contact Nora (Myers December, January, February &

secretary) to explain 112 C. Lipa March. 10/15-Discussed. Grobe feedback and establish prefers Tuesdays for the months future ROP dates(9/19) ahead. 12/3 - Future ROP dates are: 12/9, 1/13, 2/10, 3/10.

Remove UCS representative from C. Lipa/

113 10/1- Discussed service lists 90 days after A.Mendiola DD is issued (9/24) 10/1 - Discussed. 10/8 -

Details of expected visit to Hopkins/ Discussed, Due 10/15. 10/15 -

114 site (9/24) Sheron Discussed. 11/07 -Clarification on visitor status deemed necessary Inform licensee that 10/1- Discussed 11/07 - A completeness and PRO/CON chart will be developed 116 accuracy of records issue Grobe by D.Passehl to be discussed at may be added to restart 11/19/02 panel meeting 12/3 - This checklist (9/24) item will be tracked by Item 107.

Item Action Item (Date Assigned to Comments Number generated)

Decision on appropriateness of visual insp of lower vessel 12/3 - Meeting was held 121 nozzles. Set up public Grobe 11/26/2002 at Headquarters meeting to discuss this and contingency plans for NOP/NOT (11/07)

Memo to RIII on quarantine. RIII letter to Mendiola licensee on CAL.

122 Lipa Go through minutes for Mendiola pre-decisional release through items (11/07) 12/3 - 11/19 email sent discussing Memo on AIT follow up 124 Passehl the DBOP review of the AIT items (11/07) followup report (50-346/02-08)

Review LLTF report for Mendiola/

125 0350 issues / SMRT team Lipa Review Davis-Besse/Vessel Head 126 Degradation web site Strasma content for ease of use by the public. (11/07)

Decision of the extent of the needs for resolution of 127 the technical root cause (11/19)

Assess new items under allegations will interfere 128 with acceptance of relief Jacobson requests A27, A28 and A2 (11/19)