2:00 Pm Agenda for Public Meeting Between NRC and Firstenergy Nuclear Operating Co. to Discuss Licensee'S Progress on Implementing the Return to Service Plan
ML023430095
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/05/2002
From:
NRC/OCIO
To:
FirstEnergy Nuclear Operating Co
References
Download: ML023430095 (11)


Text

Public Meeting Between USNRC Davis-Besse Oversight Panel and FirstEnergy Nuclear Operating Company December 10, 2002

Davis-Besse Oversight Panel - Public Meeting December 2002 Purposes of This Meeting

  • Inform the Public of the NRCs Oversight Panel Activities
  • Discuss Licensees Progress on Implementing the Return to Service Plan 2

Davis-Besse Oversight Panel - Public Meeting December 2002 AGENDA

  • Introduction and Opening Remarks
  • Summary of November 13th Public Meetings
  • Discussion of NRCs Restart Checklist and Status of NRC Inspections
  • Licensee Presentation on the Status of Their Return to Service Plan
  • Adjourn NRC meeting with FENOC

<break>

  • Public Comments and Questions of NRC
  • Adjourn Meeting 3

Davis-Besse Oversight Panel - Public Meeting December 2002

SUMMARY

OF NOV. 13, 2002 PUBLIC MEETING

  • Topics Discussed

- Quality Assessment Value-Added

- Reactor Vessel Bottom Head Plan

- System Health Assurance

- Design Issues Resolution

- Management and Human Performance Actions

- Operations Leadership Plan

  • Transcripts of the Nov. 13, 2002, meetings will be available on our web site. http://www.nrc.gov/

4

Davis-Besse Oversight Panel - Public Meeting December 2002 Restart Checklist

  • Adequacy of Root Cause Determination

- Penetration cracking and reactor pressure vessel corrosion

- Organizational, programmatic and human performance issues 5

Davis-Besse Oversight Panel - Public Meeting December 2002 Restart Checklist

  • Adequacy of Safety Significant Structures, Systems, and Components

- Reactor pressure vessel head replacement

- Containment vessel restoration

- Structures, systems and components inside containment

- Emergency core cooling system and containment spray system sump

- Systems outside containment 6

Davis-Besse Oversight Panel - Public Meeting December 2002 Restart Checklist

  • Adequacy of Safety Significant Programs

- Corrective action

- Operating experience

- Quality audits and self-assessments

- Boric acid corrosion management

- Reactor coolant system unidentified leakage monitoring

- In-service inspection

- Modification control

- Radiation protection 7

Davis-Besse Oversight Panel - Public Meeting December 2002 Restart Checklist

  • Adequacy of Organizational Effectiveness and Human Performance

- Adequacy of root causes

- Adequacy of corrective actions

- Effectiveness of corrective actions 8

Davis-Besse Oversight Panel - Public Meeting December 2002 Restart Checklist

  • Readiness for Restart

- Systems readiness for restart

- Operations readiness for restart

- Test program development and implementation 9

Davis-Besse Oversight Panel - Public Meeting December 2002 Restart Checklist

  • Licensing Issue and Confirmatory Action Letter Resolution

- Resolve three limited ASME code relief requests

- Meet with the NRC to obtain restart approval 10

Davis-Besse Oversight Panel - Public Meeting December 2002 CONTINUING NRC INSPECTIONS

  • Organizational Effectiveness and Human Performance
  • Safety Significant Program Effectiveness
  • Resident Inspection 11