December 21, 2002 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Davis-Besse Nuclear Power Station Docket No: 50-346 Date and Time of Meeting: Tuesday, January 14, 2003, 7:00 p.m. to 9:30 P.M. (EST)

Location of Meeting: Camp Perry Clubhouse 1000 Lawrence Road, Bldg. 600 Port Clinton, OH 43452 Purpose of Meeting: Present to the local public the status of the NRCs Oversight Panel activities for the Davis-Besse Nuclear Power Station Category: This is a Category 3 Meeting. The public is invited to participate in this meeting by providing comments and asking questions throughout the meeting.

NRC Attendees:

J. Grobe, Chairman, Davis-Besse Oversight Panel W. Dean, Deputy Director, Division of Engineering, NRR C. Lipa, Chief, Branch 4, Division of Reactor Projects A. Mendiola, Section Chief, NRR J. Hopkins, Project Manager, NRR J. Jacobson, Senior Mechanical Engineer, Division of Reactor Safety S. Thomas, Senior Resident Inspector, Davis-Besse Others as designated NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jan Strasma at 630-829-9663 or me at 630-829-9619 by COB January 10, 2003.

Approved By: /RA/ ____

Christine Lipa Branch Chief Division of Reactor Projects

Notice of Significant Licensee Meeting Distribution:

B. Sheron, Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski, Director, Division of Licensing and Project Management, NRR G. Tracy, Director, Division of Nuclear Safety, NSIR S. Rosenberg, Region III Coordinator, OEDO S. Bajwa, Project Directorate, Division of Licensing and Project Management, NRR J. Hopkins, Project Manager, Project Directorate, Division of Licensing and Project Management, NRR G. Grant, Director, Division of Reactor Projects, RIII C. Pederson, Director, Division of Reactor Safety, RIII S. Reynolds, Deputy Director, Division of Reactor Projects, RIII J. Grobe, Chairman, Davis-Besse Oversight Panel R. Caniano, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief S. Thomas, SRI, Davis-Besse DRS Branch Chiefs (RNG, DEH, RDL)

R. Lickus, Regional State Liaison Officer, RIII PMNS J. Kweiser, ORA P. Buckley, ORA DB0350