Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML16281A271 | 30 September 2016 | Part 21 - Safety Related Component Welding by an Unqualified Welder | |
RS-16-180, Submittal of Mitigating Strategies Flood Hazard Assessment | 30 September 2016 | Submittal of Mitigating Strategies Flood Hazard Assessment | FLEX Fukushima Dai-Ichi |
RS-16-195, Supplemental Information for the Fourth Inservice Inspection Interval Relief Request 14R-08 | 29 September 2016 | Supplemental Information for the Fourth Inservice Inspection Interval Relief Request 14R-08 | |
BYRON 2016-0094, Registration of Use of Two Casks to Store Spent Fuel | 29 September 2016 | Registration of Use of Two Casks to Store Spent Fuel | |
CAC:MF7695 | 29 September 2016 | ||
ML16273A198 | 28 September 2016 | NRR E-mail Capture - (External_Sender) Byron Station Response to Questions Regarding the Mitigating Strategies Final Integrated Plan | Boric Acid FLEX |
ML16320A036 | 27 September 2016 | Areva Calculation 32-9244389-001, Byron/Braidwood RVCH Nozzle Idtb Repair Weld Anomaly. | Finite Element Analysis |
BYRON 2016-0092, National Pollutant Discharge Elimination System (NPDES) Permit No. IL0048313 | 22 September 2016 | National Pollutant Discharge Elimination System (NPDES) Permit No. IL0048313 | Grab sample Zebra Mussel Incorporated by reference |
CAC:MF8238 | 20 September 2016 | ||
ML16253A125 | 20 September 2016 | Fleet License Amendment Request to Revise Technical Specification Requirements for Inservice Testing Program (CAC Nos. MF8238 - MF8256) | |
ML16251A046 | 19 September 2016 | NRC Security Inspection Report 05000454; 455/2016201 (Cover Letter Only) | |
IR 05000454/2016201 | 19 September 2016 | Byron Station - NRC Security Inspection Report 05000454; 455/2016201 (Cover Letter Only) | Affidavit |
ML16243A067 | 15 September 2016 | Letter to Exelon from Victor Mccree | Backfit |
ML16257A025 | 12 September 2016 | NRR E-mail Capture - Acceptance Review for Byron, Unit Nos. 1 and 2, Relief Request I4R-10 | |
ML16256A002 | 7 September 2016 | NRR E-mail Capture - Preliminary Request for Additional Information Regarding Risk Informed Aspects of Relief Request I4R-01 | Probabilistic Risk Assessment FLEX |
ML16230A237 | 6 September 2016 | Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) | Incorporated by reference Through-Wall Leak |
ML16250A180 | 2 September 2016 | Letter Regarding Byron Requalification Program Inspection | |
ML16244A199 | 31 August 2016 | NRR E-mail Capture - Request for Additional Information Regarding Relief Request I4R-08 | |
ML16244A225 | 31 August 2016 | Senior Project Manager Reassignment | |
RS-16-122, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | 31 August 2016 | Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi |
IR 05000454/2016005 | 31 August 2016 | Mid-Cycle Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2016005; 05000455/2016005) | Spent Fuel Pool Instrumentation |
ML16243A475 | 26 August 2016 | Part 21 Safety Related Component Welding by an Unqualified Welder | |
ML16242A005 | 25 August 2016 | NRR E-mail Capture - Preliminary Request for Additional Information Regarding Risk Informed Aspects of Relief Request I4R-01 | Probabilistic Risk Assessment FLEX |
ML16236A202 | 24 August 2016 | Backfit Appeal Review Panel Findings Associated with Byron and Braidwood Compliance | Backfit |
ML16236A208 | 23 August 2016 | Report of Backfit Appeal Review Panel | Loop seal Packing leak Anticipated operational occurrence License Renewal Backfit Power Uprate Stretch Power Uprate Measurement Uncertainty Recapture |
ML16225A003 | 22 August 2016 | Status of NRC Operating Reactor Regulatory and Licensing Review Procedures | |
RS-16-163, Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval | 16 August 2016 | Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval | Nondestructive Examination Liquid penetrant |
ML16214A297 | 16 August 2016 | Generation Station, Units 1 and 2 - Staff Assessment of Response to 10CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation | Ultimate heat sink Internal Flooding Fukushima Dai-Ichi Earthquake |
CAC:MF3893 | 16 August 2016 | ||
ML16228A041 | 11 August 2016 | Summary Technical Reports for Reactor Vessel Specimen Capsule Tests for Byron Station, Units 1 and 2, Pursuant to 10 CFR 50,Appendix H and Related to License Renewal Commitment 19 | |
BYRON 2016-0076, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19) | 11 August 2016 | Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19) | Boric Acid Nondestructive Examination |
ML16214A199 | 11 August 2016 | an Assessment of Core Damage Frequency for Byron/Braidwood Backit Appeal Review | Fitness for Duty Probabilistic Risk Assessment Backfit |
IR 05000454/2016007 | 8 August 2016 | Triennial Fire Protection Inspection Report 05000454/2016007; 05000455/2016007 (Dxs) | Hot Short Safe Shutdown Fire Barrier Operator Manual Action Emergency Lighting B.5.b Significance Determination Process B.5.b Mitigating Strategies Fire Protection Program |
RS-16-158, Implementation of Certificate of Compliance No. 1014, Amendment No. 9, Revision No. 1 to Previously Loaded Casks | 4 August 2016 | Implementation of Certificate of Compliance No. 1014, Amendment No. 9, Revision No. 1 to Previously Loaded Casks | |
TAC:L24935 | 4 August 2016 | ||
ML16216A131 | 3 August 2016 | NRR E-mail Capture - Request for Additional Information Regarding Relief Request I4R-01 | |
ML16180A251 | 1 August 2016 | Issuance of Amendments Regarding Use of Optimized Zirlo as Fuel Cladding Material | Shutdown Margin Anticipated operational occurrence Exemption Request Fuel cladding |
ML16225A422 | 29 July 2016 | Inspection Plan - Byron Station, Units 1 and 2, Triennial Fire Protection Baseline Inspection 2016 007 (Dxs) | Safe Shutdown Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Emergency Lighting B.5.b Mitigating Strategies Fire Protection Program |
ML16209A218 | 26 July 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. | Shutdown Margin Reactor Vessel Water Level Packing leak High Radiation Area Stroke time Hydrostatic Squib Incorporated by reference Missed surveillance Surveillance Frequency Control Program Excess Flow Check Valve Power Operated Valves Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage |
IR 05000454/2016002 | 26 July 2016 | NRC Integrated Inspection Report 05000454/2016002; 05000455/2016002 and Exercise of Enforcement Discretion (EA-16-125) | Safe Shutdown Unanalyzed Condition Boric Acid High winds High Radiation Area Ultimate heat sink Non-Destructive Examination Fire Barrier Stroke time Tornado Missile Water Inventory Control Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification FLEX Tornado-Generated Missile Missed surveillance Significance Determination Process Tornado Missile Protection Open Phase Condition Large early release frequency Operability Determination Through-Wall Leak Through-Wall Leakage Fire Protection Program Fire Watch Hourly Fire Watch Substantial potential for an overexposure Coast down Operability Assessment Unidentified leakage Overexposure |
ML16203A108 | 21 July 2016 | Fourth Ten-Year Interval Inservice Testing Program | Safe Shutdown Boric Acid Stroke time Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding Grace period |
ML16203A383 | 21 July 2016 | Summary of the July 12, 2016, Public Open House Regarding Byron Nuclear Power Station | Open House |
RS-16-156, Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations | 18 July 2016 | Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
CAC:MF0872 | 15 July 2016 | ||
RS-16-088, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 15 July 2016 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid High winds Shutdown Margin Ultimate heat sink Time to boil Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment FLEX Tornado Generated Missile Fukushima Dai-Ichi Foreign Material Exclusion Spent Fuel Pool Instrumentation B.5.b Mitigating Strategies Earthquake |
ML16196A110 | 14 July 2016 | Notification of NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000454/2016004; 05000455/2016004 | Ultimate heat sink Temporary Modification Flow Induced Vibration |
ML16190A385 | 8 July 2016 | EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure | Safe Shutdown Health Physics Network Ultimate heat sink FLEX Severe Accident Management Guideline Minimum staff |
Press Release-III-16-017, NRC to Hold Open House to Discuss Agency'S Assessment of Byron Nuclear Power Plant | 5 July 2016 | Press Release-III-16-017: NRC to Hold Open House to Discuss Agency'S Assessment of Byron Nuclear Power Plant | Open House |