Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, EPU Post-Uprate Event 3 Data Report30 September 2013St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, EPU Post-Uprate Event 3 Data Report
L-2013-278, RAI Reply for the Application for the Technical Specification Change and Exemption Request Regarding the Use of M5 Alloy Fuel Cladding in Core Reload Applications30 September 2013RAI Reply for the Application for the Technical Specification Change and Exemption Request Regarding the Use of M5 Alloy Fuel Cladding in Core Reload ApplicationsShutdown Margin
Exemption Request
Fuel cladding
L-2013-281, Preliminary Schedule for GSI-191 Resolution30 September 2013Preliminary Schedule for GSI-191 Resolution
L-2013-273, CFR 71.95 Report on the 8-120B Cask.30 September 2013CFR 71.95 Report on the 8-120B Cask.
ML15314A31730 September 2013St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, EPU Post-Uprate Event 3 Data Report
ML13268A51025 September 2013NRR E-mail Capture - St. Lucie Unit 1 - Verbal Approval of Relief Requests 5 (TAC No. MF0675), and 7Nondestructive Examination
Dissimilar Metal Weld
ML13259A05119 September 2013Request for Additional Information Regarding Use of M5; Fuel Cladding License Amendment Request and Exemption Request (TAC Nos. MF1817 & MF1820)Exemption Request
Fuel cladding
ML13261A14416 September 2013Official Service List Distribution for Safeguards Information
ML13267A0678 September 2013NRR E-mail Capture - August 2013 FPL Marine Turtle Removal Monthly Report
ML13249A2795 September 2013NRR E-mail Capture - St. Lucie Units 1 and 2 License Amendment Request to Modify Technical Specification Regarding Moderator Temperature Coefficient Surveillance for Startup Test Activity Reduction Program
ML13256A3765 September 2013NRR E-mail Capture - Status Report on Your April 23, 2012 Petition Request
ML13232A1804 September 2013Branch Chief Reassignment for Plant Licensing Branch
ML13246A0543 September 2013Mid-Cycle Assessment Letter
L-2013-261, RAI Response to Fourth Ten-Year Interval Relief Request No. 7, Revision 030 August 2013RAI Response to Fourth Ten-Year Interval Relief Request No. 7, Revision 0Coatings
Backfit
ML13164A26530 August 2013Issuance of Amendments Revising Station Battery Connection Resistances Acceptance Criteria in Technical Specifications
ML13259A03228 August 2013NRR E-mail Capture - Acceptance E-MAIL (TAC Nos. MF-2496 & MF-2497)
L-2013-254, First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2013First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Shutdown Margin
Ultimate heat sink
FLEX
ML13241A10328 August 2013Notification of Inspection and Request for InformationBoric Acid
Nondestructive Examination
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
ML13254A19528 August 2013Independent Spent Fuel Storage Installation (ISFSI)
L-2013-253, St. Lucie'S First Six-Month Status Report to the Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses27 August 2013St. Lucie'S First Six-Month Status Report to the Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify LicensesFLEX
Spent Fuel Pool Instrumentation
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
ML13246A08723 August 2013Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification
ML13296A50422 August 2013Single Positive Test Form for, Pre-Access, Collected on 08/21/2013
L-2013-257, Inservice Inspection Plan, Second RAI Reply to Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 022 August 2013Inservice Inspection Plan, Second RAI Reply to Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 0Dissimilar Metal Weld
DM weld
ML13231A08616 August 2013NRR E-mail Capture - St Lucie Unit 1--Relief Request 7 Regarding Alternate Repair of Intake Cooling Water Piping (TAC No. MF2529) - Request for Additional Information (RAI)
ML13247A22614 August 2013NRR E-mail Capture - FW: Clarification Question for St. Lucie Rfa 9 (MF0711)
ML13228A39912 August 2013Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109
ML13225A29312 August 20137/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13221A2059 August 2013NRR E-mail Capture - St. Lucie, Unit 1 Relief Request No. 5 - 2nd Round of Requests for Additional Information (Rais)Dissimilar Metal Weld
ML13225A1728 August 2013Initial Exam 2012-301 Final Administrative JPMs
ML13225A1388 August 2013Initial Exam 2012-301 Draft Sim/In-plant JPMsJob Performance Measure
ML13225A1718 August 2013Initial Exam 2012-301 Final Sim/In-plant JPMsJob Performance Measure
ML13225A1698 August 2013Initial Exam 2012-301 Final Simulator ScenariosBoric Acid
Locked High Radiation Area
Power change
Downpower
ML13225A1668 August 2013Initial Exam 2012-301 Final Administrative DocumentsBoric Acid
Job Performance Measure
ML13225A1408 August 2013Initial Exam 2012-301 Draft Administrative JPMs
ML13225A1358 August 2013Initial Exam 2012-301 Draft Simulator ScenariosBoric Acid
Shutdown Margin
Locked High Radiation Area
Power change
Downpower
ML13225A1328 August 2013Initial Exam 2012-301 Draft SRO Written ExamGrab sample
Temporary Modification
Pressure Boundary Leakage
Recently irradiated fuel
Downpower
ML13225A1308 August 2013Initial Exam 2012-301 Draft RO Written ExamSafe Shutdown
High Radiation Area
Stroke time
Time to boil
Temporary Modification
Locked High Radiation Area
Continuous fire watch
Fire Watch
Power change
Downpower
Coast down
ML13225A1288 August 2013Initial Exam 2012-301 Draft Administrative DocumentsBoric Acid
ML13219A3147 August 2013NRR E-mail Capture - St. Lucie, Unit 1 - Acceptance Review of Relief Request No. 7, Rev. 0, Regarding Underground Intake Cooling Water Piping Repairs with Bolted Patch Plates
ML13219B1356 August 2013Cyber Security Notification LetterCyber Security
L-2013-240, Fourth Ten-Year Interval, Relief Request No. 7, Rev. 05 August 2013Fourth Ten-Year Interval, Relief Request No. 7, Rev. 0Coatings
Biofouling
Through-Wall Leak
Backfit
ML13267A0575 August 2013NRR E-mail Capture - Logbook Entry: 8/5/2013 - St. Lucie Sea Turtle
ML13267A0653 August 2013NRR E-mail Capture - July 2013 FPL Marine Turtle Removal Monthly Report
ML13161A2862 August 2013Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic ReevaluationsProbabilistic Risk Assessment
Earthquake
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
ML13212A22930 July 2013TI-2515-182 - Phase 2 - Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks.
ML13296A50330 July 2013Single Positive Test Form for Pre-Access, Collected on 07/23/2013