Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
ML13311A05530 September 2013Fluence Extrapolation in Support of NMP2 P-T Cure Update, MPM-913991, September 30, 2013, Attachment 3Pressure and Temperature Limits Report
ML13270A27727 September 2013MF0345, Revised Additional Rais, MF0345, LAR Revising and Relocating PT Limit Curves to PTLRPressure and Temperature Limits Report
ML13304A51327 September 2013General License 30-day Cask Registration Notification and Thermal Performance Assessment
ML15022A66327 September 2013CDI Non-Conformance Report No. 0343, Non-proprietary Version
ML13268A55825 September 2013MF0345, Additional Draft Rais, MF0345, LAR Revising and Relocating PT Limit Curves to PTLRPressure and Temperature Limits Report
IR 05000220/201300323 September 2013NRC Integrated Inspection Report 05000220/2013003 and 05000410/2013003; Preliminary Greater than Green Finding and Apparent ViolationFitness for Duty
Time to boil
Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
Fatality
ML13256A36417 September 2013Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant - Acceptance of Requested Licensing Action Regarding Direct License Transfer (TAC MF2584 - MF2588)
TAC:MF258617 September 2013
ML13256A39513 September 2013Revised Draft Follow-Up Rais, MF0345, LAR Revising and Relocating PT Limit Curves to PTLRPressure and Temperature Limits Report
ML13261A30312 September 2013ISFSI - General License 30-day Cask Registration Notification and Thermal Performance Assessment
ML13217A04412 September 2013Request for Withholding Information from Public Disclosure Responses to Requests for Additional Information Dated July 31, 2013Pressure and Temperature Limits Report
ML13259A04412 September 2013Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS SitesSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13260A25710 September 2013Notification of Completion of Firearms Background Checks in Accordance with NRC Order EA- 13-092Fitness for Duty
ML13261A2886 September 2013Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for Implementation of a Risk-Informed, Safety-Based Inservice Inspection Program Based on ASME Code Case N-716 - Response to Nrc.
ML13254A1516 September 2013Supplement to Flood Hazard Reevaluation Report Regulatory Commitments
Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants6 September 2013Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants
ML13254A1556 September 2013Amendment Request to Relocate the Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report - Supplemental Information in Response to NRC Request for Additional InformationPressure and Temperature Limits Report
IR 05000220/20130063 September 2013Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Nine Mile Point Nuclear Station Units 1 and 2 (Report 05000220-13-006 and 05000410-13-006)
ML13252A14230 August 2013General License 30-day Cask Registration Notification and First System Thermal Performance Assessment
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
ML13254A27927 August 2013Six-Month Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)High Radiation Area
Cyber Security
FLEX
Spent Fuel Pool Instrumentation
ML13254A27827 August 2013Clavert Cliffs, Units 1 & 2, R.E. Ginna, Nine Mile Point, Units 1 & 2, Six-Month Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis ExterBoric Acid
Shutdown Margin
Ultimate heat sink
Emergency Lighting
FLEX
Tornado Generated Missile
B.5.b Mitigating Strategies
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
ML13231A12822 August 2013Request for Additional Information Regarding the License Amendment Request for the Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits ReportPressure and Temperature Limits Report
ML13238A25321 August 2013Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders
ML13219B13319 August 2013Extension of Branch Chief Reassignment
IR 05000220/201340416 August 2013IR 05000220/2013404 and 05000410/2013404; 7/22/2013 to 7/25/2013; Nine Mile Point Nuclear Station, Units 1 and 2; Security (Letter Only)Affidavit
ML13227A28315 August 2013Requalification Program Inspection Nine Mile Point Nuclear Station, Unit 2
ML13228A18614 August 2013Supplement to Application for Order Approving Transfer of Operating Authority and Conforming License AmendmentsFuel cladding
Liquid penetrant
ML13226A23614 August 20138/5/13 - Summary of Ceng/Nrc Annual Management Meeting
ML13228A26514 August 2013Independent Spent Fuel Storage Installations Application for Preemption Authority Pursuant to Section 161A of the Atomic Energy Act & License Amendment RequestSafe Shutdown
Cyber Security
Preemption Authority
Fuel cladding
Fire Protection Program
ML13225A13713 August 2013MF2462, Acceptance of Requested Licensing Action License Amendment Request on Standby Liquid Control System - Increase in Isotopic Enrichment of Boron-10
ML13225A47113 August 2013IR 05000220-13-003, 05000410-13-003; on 04/01/2013 - 06/30/2013; Nine Mile Point Nuclear Station (NMPNS) Units 1 and 2; Surveillance Testing, Problem Identification and Resolution, Follow-Up of Events and Notices of Enforcement DiscretionHigh Radiation Area
Offsite Dose Calculation Manual
Water Inventory Control
Time to boil
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Annual Radiological Environmental Operating Report
Battery sizing
Maintenance Rule Program
Fuel cladding
Liquid penetrant
Dissimilar Metal Weld
DM weld
Scaffolding
ML13224A26512 August 2013MF0345, Draft Follow-Up RAIs (Redacted), MF0345, LAR Revising and Relocating PT Limit Curves to PTLRPressure and Temperature Limits Report
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13228A39912 August 2013Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109
ML13231A1869 August 2013Fourth Inservice Inspection Interval, Second Inservice Inspection Period, 2013 Owner'S Activity Report for RFO-22 Inservice ExaminationsEVT-1
ML13231A1879 August 2013Steam Dryer Support Bracket Flaw EvaluationHydrostatic
Finite Element Analysis
EVT-1
ML13227A0157 August 2013Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notification and First System Thermal Performance Assessment
ML13232A1566 August 2013ISFSI, Nine Mile Point, Units 1, 2 and ISFSI and R.E. Ginna, and ISFSI, Application for Order Approving Transfer of Operating Authority and Conforming License Amendments. Part 1 of 2Safe Shutdown
Cyber Security
Decommissioning Funding Plan
Fire Protection Program
ML13232A1576 August 2013ISFSI, Nine Mile Point, Units 1, 2 and ISFSI and R.E. Ginna, and ISFSI, Application for Order Approving Transfer of Operating Authority and Conforming License Amendments. Part 2 of 2Cyber Security
ML13204A4222 August 2013Status of 60-Day Response to Issuance of Seismic Evaluation Guidance Related to the Near-Term Task Force Recommendation 2.1, Seismic for Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; andProbabilistic Risk Assessment
Earthquake
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
ML13214A3831 August 2013Revised Commitment to Flood Hazard Reevaluation ReportSafe Shutdown
Fukushima Dai-Ichi
ML13214A38831 July 2013License Amendment Request to Relocate the Pressure & Temperature Limit Curves to the Pressure & Temperature Limits Report - Supplemental Information in Response to NRC Request for Additional InformationFinite Element Analysis
Pressure and Temperature Limits Report
IR 05000220/201350331 July 2013IR 05000220-13-503 and 05000410-13-503, June 17-21, 2013, Nine Mile Point NRC Evaluated Emergency Preparedness Exercise
Press Release-I-13-027, NRC Staff to Meet with Constellation on Aug. 5 in Baltimore to Discuss Performance of Company'S Nuclear Plant Fleet29 July 2013Press Release-I-13-027: NRC Staff to Meet with Constellation on Aug. 5 in Baltimore to Discuss Performance of Company'S Nuclear Plant Fleet
ML13207A26222 July 2013June 5, 2013, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station (Cover Letter)Generic Fundamentals Examination
ML13199A32817 July 20138/5/13 - Notice of Public Meeting - Constellation Energy Nuclear Group, LLC (Calvert Cliffs, Ginna, and Nine Mile Point)