Other: ML13225A566, ML13254A278, ML13280A271, ML13281A205, ML13338A646, ML14069A318, ML14210A449, ML14224A477, ML14302A174, RS-15-099, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), RS-16-028, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design- Basis External Events (Order Number EA-12-049), RS-16-032, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
|
MONTHYEARML13066A1722013-02-28028 February 2013 R. E. Ginna, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation Project stage: Request ML13066A1712013-02-28028 February 2013 R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML13074A0562013-03-0808 March 2013 Supplement to Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML13073A1552013-03-0808 March 2013 Supplement to Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation Project stage: Supplement ML13078A0102013-03-12012 March 2013 Flood Hazard Reevaluation Report Project stage: Request ML13164A3932013-06-19019 June 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation, Order EA-12-051 Project stage: RAI ML13190A0172013-07-0303 July 2013 Response to Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) Project stage: Response to RAI 05000318/LER-2013-003, Regarding Reactor Trip Due to Intermittent Failure in the Turbine Control System2013-07-0303 July 2013 Regarding Reactor Trip Due to Intermittent Failure in the Turbine Control System Project stage: Request ML13254A2782013-08-27027 August 2013 Clavert Cliffs, Units 1 & 2, R.E. Ginna, Nine Mile Point, Units 1 & 2, Six-Month Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Exter Project stage: Other ML13254A1512013-09-0606 September 2013 Supplement to Flood Hazard Reevaluation Report Regulatory Commitments Project stage: Request ML13267A2852013-09-25025 September 2013 Interim Staff Evaluation and Request for Additional Information - Calvert Cliffs Nuclear Plant, Unites 1 and 2 Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: RAI ML13280A2712013-10-0303 October 2013 Notification of Completion of Firearms Background Checks in Accordance with NRC Order EA-13-092 Project stage: Other ML13309A6582013-10-0707 October 2013 Constellation Energy Quality Assurance Topical Report, Rev. 7 Project stage: Request ML13281A2052013-11-15015 November 2013 Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation Project stage: Other ML13338A6462013-12-0909 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, TAC Nos.: MF1142 and MF1143 Project stage: Other ML13225A5662013-12-17017 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049(Mitigation Strategies) Project stage: Other ML14069A3182014-02-27027 February 2014 February 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML14210A4492014-08-0505 August 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other ML14224A4772014-08-15015 August 2014 Correction Letter Regarding Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other RS-15-078, Calvert Cliff, Unit 2 - Request for Schedule Relaxation from Nuclear Regulatory Commission Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-20020 February 2015 Calvert Cliff, Unit 2 - Request for Schedule Relaxation from Nuclear Regulatory Commission Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML14302A1742015-02-20020 February 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other ML15054A3342015-03-0404 March 2015 Relaxation of the Scheduler Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events Project stage: Approval RS-15-099, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-07-0202 July 2015 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other RS-16-028, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design- Basis External Events (Order Number EA-12-049)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design- Basis External Events (Order Number EA-12-049) Project stage: Other RS-16-032, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other 2013-07-03
[Table View] |
Text
Mary G. Korsnick Acting CEO and Chief Nuclear Officer CENG.
a joint venture of 0
Coteai
- Ewagy, e~f Office 410-470-5133 Fax 443-213-6739 E-mail: Maria. Korsnick@cengllc.com September 6, 2013 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 Docket Nos. 50-317 and 50-318 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 50-220 and 50-410 Supplement to Flood Hazard Reevaluation Report Regulatory Commitments (a)
Letter from J. A. Spina (CENG) to Document Control Desk (NRC), dated March 12, 2013, Flood Hazard Reevaluation Report
REFERENCES:
(b)
Letter from J. A. Spina (CENG) to Document Control Desk (NRC), dated March 12, 2013, Flood Hazard Reevaluation Report (c)
Letter from C. R. Costanzo (NMPNS) to Document Control Desk (NRC),
dated August 1, 2013 The purpose of this letter is to provide additional information on the interim action regulatory commitments described in References (a) and (c) for Calvert Cliffs Nuclear Power Plant (CCNPP) and Nine Mile Point Nuclear Station (NMPNS), respectively.
Reference (c) revised the regulatory commitments provided in Reference (b).
Two reevaluated flood mechanisms, local Probable Maximum Precipitation (PMP) and Probable Maximum Storm Surge (PMSS) exceeded the current design basis flood for Calvert Cliffs Units I and 2.
One reevaluated flood mechanism, local PMP, exceeded the current design basis flood for both NMP1 and NMP2.
The following tables provide a list of the interim actions taken and one action to be taken in the future, with additional supporting details. Neither NMPNS nor CCNPP will modify any of these interim actions without notifying the Nuclear Regulatory Commission in advance.
Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C, Baltimore, MD 21202
Document Control Desk September 6, 2013 Page 2 Calvert Cliffs Nuclear Power Plant Item Interim Actions Taken as Report Implementation Number Included in the Reevaluation Reference Additional Actions Taken Date Report For a local PMP event, a Reference (a)
The design of the FloodStop Completed FloodStop barrier will be cover letter, barriers has been verified to deployed at the Auxiliary Page 2 withstand the environmental Building access/entrance conditions that might
- points, accompany the reevaluated PMP event.
Installation of the FloodStop barriers has been verified to ensure that they can be properly installed within the required timeframes.
2 For a local PMP event, a Reference (a)
Training on the use and Completed procedure to install the cover letter, installation of the FloodStop FloodStop barriers has been Page 2 barrier has been conducted implemented.
for all necessary personnel.
3 For the PMSS event, to Reference (a)
The design of the panel Completed mitigate the reevaluated cover letter, covers has been verified to storm surge elevation and Page 2 withstand the environmental minimize the water ingress conditions that might into the intake structure, accompany the reevaluated Calvert Cliffs has provided PMSS event.
waterproof panel covers, which will be placed over Installation of the panel the ventilation louvers above covers has been verified to the Circulating Water Pump ensure that they can be and Saltwater Pump motors properly installed within the to prevent water from required timeframes.
flooding the Intake Structure.
4 For the PMSS event, a Reference (a)
Training on the use and Completed procedure to install the panel cover letter, installation of the panel covers has been Page 2 covers has been conducted implemented.
I for all necessary personnel.
Document Control Desk September 6, 2013 Page 3 Nine Mile Point Nuclear Station Item Interim Actions Taken as Report Implementation Number Included in the Reevaluation Reference Additional Actions Taken Date Report I
For a local PMP event, a Reference (c) The design of the FloodStop Completed FloodStop barrier will be barriers has been verified to deployed at the doors withstand the environmental detailed in Reference (c).
conditions that might accompany the reevaluated PMP event.
Installation of the FloodStop barriers has been verified to ensure that they can be properly installed within the required timeframes.
2 For a local PMP event, a Reference (c)
The procedure was revised Completed procedure to install the and demonstrated through FloodStop barriers has been simulations on the use and implemented.
installation of the FloodStop barriers.
Item Interim Action to be Taken Report Additional Actions to be Implementation Number as Included in the Reference Taken Date Reevaluation Report An interim evaluation will be performed to identify actions to reduce the flood elevation for NMPI and reduce the flood duration for Reference 1
both NMP1 and NMP2.
(b) Page 2 None August 1, 2014 The evaluation will consist of modeling potential modifications to site drainage systems and flood mitigation features.
This letter does not contain any new regulatory commitments.
Document Control Desk September 6, 2013 Page 4 If there are any questions regarding this submittal, please contact Everett (Chip) Perkins at 410-470-3928.
I declare under penalty of perjury that the foregoing is true and correct. Executed on September 6, 2013.
Sincerely, tary
. Korsnick MGK/EMT cc:
Project Manager, Calvert Cliffs, NRC Project Manager, Nine Mile Point, NRC Project Manager, R.E. Ginna, NRC NRC Regional Administrator, Region I Resident Inspector, Calvert Cliffs Resident Inspector, Nine Mile Point S. Gray, MD-DNR