Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
HCH-2013-053, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report24 September 2013New Jersey Pollutant Discharge Elimination System Discharge Monitoring ReportNJPDES
LR-N13-0222, Core Operating Limits Report, Reload 17, Cycle 18, Revision 819 September 2013Core Operating Limits Report, Reload 17, Cycle 18, Revision 8Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Surveillance Frequency Control Program
LR-N13-0221, Technical Specification 6.9.1.5.b, 2012 Annual Report of SRV Challenges19 September 2013Technical Specification 6.9.1.5.b, 2012 Annual Report of SRV Challenges
LR-N13-0210, Annual 10 CFR 50.46 Report10 September 2013Annual 10 CFR 50.46 Report
ML13254A16610 September 2013Response to NRC Request for Information Pursuant to 10 CFR 50.54(f). Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident...Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML14010A0649 September 2013Final Qa/Related Forms (Folder 1)Job Performance Measure
LR-N13-0207, Independent Spent Fuel Storage Installation - Report of 10 CFR 72.48 Changes, Tests, and Experiments6 September 2013Independent Spent Fuel Storage Installation - Report of 10 CFR 72.48 Changes, Tests, and Experiments
LR-N13-0204, 2012 Summary of Revised Regulatory Commitments6 September 20132012 Summary of Revised Regulatory Commitments
LR-N13-0155, License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual5 September 2013License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements ManualHigh winds
Surveillance Frequency Control Program
Recently irradiated fuel
TAC:MF27385 September 2013
IR 05000354/20130063 September 2013ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000354-13-006
LR-N13-0170, Response to Request for Additional Information - 2013 Decommissioning Funding Status Report28 August 2013Response to Request for Additional Information - 2013 Decommissioning Funding Status Report
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
ML13267A38927 August 2013Final Written Examination with Answer Key (401-5 Format) (Folder 3)Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Half scram
Scram Discharge Volume
Offsite Circuit
Power change
ML13267A41527 August 2013Handouts to Applicants (Folder 3)
LR-N13-0197, Intent to Submit License Amendment Request to Install Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I&C-ISG-0627 August 2013Intent to Submit License Amendment Request to Install Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I&C-ISG-06Cyber Security
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
ML13233A11322 August 2013Notice of Forthcoming Meeting with PSEG Nuclear, LLC Regarding a Planned Digital Instrumentation and Controls License Amendment Request Associated with Hope Creek Generating Station, Unit 1
LR-N13-0173, PSEG Nuclear Llc'S First Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Extern22 August 2013PSEG Nuclear Llc'S First Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis ExternalFLEX
Fukushima Dai-Ichi
LR-N13-0195, Response to NRC Request for Information - Potential Impact on Work Environment22 August 2013Response to NRC Request for Information - Potential Impact on Work Environment
LR-N13-0174, PSEG Nuclear Llc'S First Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Numb22 August 2013PSEG Nuclear Llc'S First Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order NumberSpent Fuel Pool Instrumentation
LR-N13-0166, PSEG Nuclear Llc'S Response to Request for Additional Information for the Hope Creek'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Ins20 August 2013PSEG Nuclear Llc'S Response to Request for Additional Information for the Hope Creek'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool InstruHigh Radiation Area
Fire Barrier
FLEX
Spent Fuel Pool Instrumentation
ML13267A38019 August 2013Final Outlines (Folder 3)Reactor Vessel Water Level
ML13267A42219 August 2013Final Operating Exam (Sections a, B, and C) (Folder 3)Half scram
Internal Flooding
Probabilistic Risk Assessment
Test box
Job Performance Measure
Scram Discharge Volume
Earthquake
Power change
Operability Assessment
HCH-2013-047, Submittal of Discharge Monitoring Report for the Month of July 201315 August 2013Submittal of Discharge Monitoring Report for the Month of July 2013
ML13227A20714 August 2013Initial Operator Licensing Operating Test and Written Examination Approval Hope Creek Generating Station
IR 05000272/201340514 August 2013IR 05000354-13-405, 05000272-13-405, 05000311-13-405; Hope Creek and Salem Nuclear Generating Station, Units 1 and 2; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Process for Responding to Potential Aircraft Threats LetAffidavit
ML13221A41113 August 2013and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Extension of Branch Chief Reassignment
ML13228A39912 August 2013Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109
ML13168A27612 August 2013Peach Bottom, Units 2 and 3, Request for Additional Information Decommissioning Funding Status Report (TAC No. MF2202; MF2227; MF2228)
ML13227A12712 August 2013Draft Operating Exam (Sections a, B, and C) (Folder 2)Half scram
Internal Flooding
Probabilistic Risk Assessment
Test box
Job Performance Measure
Scram Discharge Volume
Earthquake
Power change
Operability Assessment
ML13227A11712 August 2013Draft - Outlines (Folder 2)Reactor Vessel Water Level
ML13227A10712 August 2013Facility Comments on Draft NRC-Developed Exam (Written) (Folder 2)
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13227A10212 August 2013Facility Comments on Draft NRC-Developed Exam (Operating) (Folder 2)
ML14070A49212 August 2013Draft Written SRO Exam (Folder 2)Shutdown Margin
Half scram
Offsite Circuit
TAC:U0187212 August 2013
ML14070A49112 August 2013Draft Written RO Exam (Folder 2)Safe Shutdown
Reactor Vessel Water Level
Half scram
Scram Discharge Volume
LR-N14-0084, Offsite Dose Calculation Manual, Revision 274 August 2013Offsite Dose Calculation Manual, Revision 27Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML13161A2862 August 2013Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic ReevaluationsProbabilistic Risk Assessment
Earthquake
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
IR 05000354/201300331 July 2013IR 05000354-13-003, 04/01/2013 - 06/30/2013, Hope Creek Generating Station, Follow-up of Events and Notices of Enforcement DiscretionHigh Radiation Area
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Water Inventory Control
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Squib
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Operability Determination
Pressure Boundary Leakage
Downpower
Operability Assessment
LR-N13-0167, PSEG Nuclear Llc'S Response to Request for an Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-04930 July 2013PSEG Nuclear Llc'S Response to Request for an Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049
LR-N13-0143, License Amendment Request to Relocate Safety/Relief Valve Position Instrumentation to the Technical Requirements Manual30 July 2013License Amendment Request to Relocate Safety/Relief Valve Position Instrumentation to the Technical Requirements ManualPost Accident Monitoring
Surveillance Frequency Control Program
ML13220A01829 July 2013NJDEP Case #13-07-01-0901-47, Operator #25 National Response Center Incident #1052340 30-day Discharge Confirmation Report
ML13193A29122 July 2013Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) TAC MF1031High Radiation Area
Spent Fuel Pool Instrumentation
ML13204A25319 July 2013Draft RAIs - Decommissioning Funding Status Report for Hope Creek and Peach Bottom
ML13204A24819 July 2013Decommissioning Funding Status Report RAIs for Hope Creek and Peach Bottom
TAC:MF189617 July 2013