HC Comments on NRC-Developed Operating Test Section A RO Admin A-3: changed critical task to not include check valve bypass valve.
SRO Admin A-3: changed critical task to not include check valve bypass valve.
SRO A-2: modified system lineup sheet to reflect current plant lineup SRO A-4: modified to require SRO applicants to assess tech spec implications.
Section B Sim JPM S-3: enhanced termination criteria.
Sim JPM S-4: modified RHR flow rate value in script to match sim reading Sim JPM S-4: enhanced termination criteria Sim JPM S-5: added time requirement to critical step Section C Scenario #1: added critical task to script (open additional SRV)
Scenario #1: added BPV jack failure to script Scenario #2: enhanced critical task to match recent licensee change Scenario #2: removed incorrect script actions Scenario #3: updated scenario summary to reflect script Scenario #3: updated "Restore Water Level" critical task with specific water level band Scenario #3: enhanced clarity of RPV-ED critical task description