Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML102660428 | 30 September 2010 | LB Order (Confirming Matters Addressed at September 15, 2010, Telephone Conference) | |
IR 05000293/2010007 | 29 September 2010 | NRC Inspection Report 05000293/2010007 | |
ML102660676 | 29 September 2010 | 2010-09-29-NRC Staff Response to Secretary of the Commission Request for Further Consideration Regarding New and Significant Information Pertaining to Pilgrim Watch'S Petition for Review of LBP-06-848 Dated July 25, 2010 | |
ML102700614 | 27 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102730063 | 27 September 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
TAC:ME4500 | 27 September 2010 | ||
ML102850369 | 27 September 2010 | G20100527/EDATS: OEDO-2010-0688 - Transcript Mary Lampert 2.206 Regarding Hydrogeologic Assessment at Pilgrim Nuclear Power Station, Pages 1-33 | |
ML102730042 | 22 September 2010 | Pilgrim Watch Motion Regarding ASLB Refusal to Respond to Pilgrim Watch'S Motion for Clarification ASLB Order (Sept 2, 2010) | Incorporated by reference Chernobyl |
ML102720411 | 22 September 2010 | Notification Letter Designating Balance-of-Plant Systems within the Cyber Security Rule Scope | Cyber Security |
ML102650536 | 22 September 2010 | Renewal Hearing - Action Request: Draft Conference Call Summaries for Comment | VT-2 Aging Management |
ML102720399 | 21 September 2010 | Entergy'S Response to Pilgrim Watch'S Memo Re Proposed Schedule | |
ML102730788 | 21 September 2010 | Pilgrim Watch'S Reply to Entergy'S Response to Pilgrim Watch'S Memo Regarding Proposed Schedule | |
ML102730789 | 21 September 2010 | Memo Regarding Proposed Schedule | |
ML102740069 | 21 September 2010 | Entergy Response to NRC Request for Additional Information Dated July 21, 2010, in Support of Proposed License Amendment for Pilgrim Setpoint & Setpoint Tolerance Increases for Safety Relief Valves (SRV) & Spring Safety Valves (Ssv), and Re | Hydrostatic Pressure boundary leak Weak link |
ML102650228 | 15 September 2010 | Transcript of Entergy Nuclear Generation Company Pilgrim Nuclear Power Station Telephone Conference, Wednesday, September 15, 2010, Pages 670-728 | |
ML102630292 | 13 September 2010 | Entergy'S Eighteenth Supplemental Disclosure | |
ML102580318 | 9 September 2010 | Pilgrim Watch Motion for Clarification ASLB Order (Sept. 02, 2010) | |
ML102530661 | 9 September 2010 | NRC Staff Supplement 27 to Hearing File | |
ML102580240 | 7 September 2010 | Response to NRC Request for Additional Information Related to Relocation of Pressure-Temperatures (P-T) Curves to the Pressure and Temperature Limits Report | Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report |
ML102770700 | 3 September 2010 | G20100527/EDATS: OEDO-2010-0688 - E-mail from M. Lampert to R. Guzman 2.206 Petition on Hydro-geologic Assessments as Supplement to July 19, 2010, Petition Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station | |
ML102520219 | 3 September 2010 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102460537 | 2 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102440593 | 1 September 2010 | Mid-Cycle Performance Review and Inspection Plan 2010 - Pilgrim Nuclear Power Station | B.5.b Mitigating Strategies |
ML102510137 | 30 August 2010 | Response to NRC Request for Additional Information Dated June 3, 2010, in Support of Proposed License Amendment for Pilgrim Setpoint and Setpoint Tolerance Increases for Safety Relief Valves (SRV) and Spring Safe | Fuel cladding |
ML102420328 | 30 August 2010 | Project Manager Assignment | |
ML102390117 | 27 August 2010 | Commission Memorandum and Order (CLI-10-22) | |
ML102290163 | 25 August 2010 | Relief Request PRR-20, Alternative Examination Requirements for Nozzle-To-Shell and Inner Radii Welds Using ASME Code Case N-702 and BWRVIP-108 - Pilgrim Nuclear Power Station | Incorporated by reference |
ML102371274 | 24 August 2010 | GALL Aging Management Program AMP M41 Buried Piping - Pilgrim Watch Comments (8/25/10) | Non-Destructive Examination Hydrostatic Coatings Aging Management Moisture barrier Through-Wall Leak |
ML102380379 | 17 August 2010 | Petition for Rulemaking of Raymond Shadis, Et. Al. on Behalf of the Friends of the Coast, Et. Al. on PRM 54-6 Regarding Seeking to Amend 10 CFR Section 54.17(c) | Aging Management Environment Report |
ML102280568 | 13 August 2010 | G20100527/EDATS: OEDO-2010-0688 - Mary Lampert and Rebecca Chin Ltr. Re 2.206 - Hydrogeologic Assessment at Pilgrim Nuclear Power Station | Anticipated operational occurrence Condition Adverse to Quality |
ML102280004 | 13 August 2010 | NRC Staff Supplement 25 to Hearing File | |
ML102290198 | 9 August 2010 | G20100454/EDATS: OEDO-2010-0589 - Mary Lampert 2.206 Petition Transcript on Entergy Management of Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station | |
TAC:ME4266 | 9 August 2010 | ||
ENOC-10-00027, Comment (42) of John F. Mccann, on Behalf of Entergy Nuclear Operations, Inc., on Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment | 6 August 2010 | Comment (42) of John F. Mccann, on Behalf of Entergy Nuclear Operations, Inc., on Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment. | Severe Accident Management Guideline Earthquake |
ML102210411 | 6 August 2010 | G20100454/EDATS: OEDO-2010-0589 - Mary Lampert Ltr. Supplement (1) to Pilgrim Watch 2.206 Petition Regarding Inadequacy of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim Station | Anticipated operational occurrence Aging Management |
ML102150055 | 5 August 2010 | Cyber Security Amendment Withdrawal Letter | Cyber Security |
ML102170523 | 5 August 2010 | Order of the Secretary Regarding Pw Notice to Commission Regarding New and Significant Information Pertaining to Pw'S Petition for Review of LBP-06-848 | |
ML102240167 | 5 August 2010 | Response to RIS 2010-08 Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
TAC:ME4351 | 30 July 2010 | ||
ML102110101 | 30 July 2010 | Acceptance of LAR Application for Cyber Security Plan | Cyber Security |
ML102150221 | 29 July 2010 | Entergy'S Seventeenth Supplemental Disclosure | |
IR 05000293/2010003 | 29 July 2010 | IR 05000293-10-003, on 04/01/10 - 06/30/10; Pilgrim Nuclear Power Station; Flood Protection Measures | Safe Shutdown High Radiation Area Ultimate heat sink Fire Barrier Nondestructive Examination Emergency Lighting Locked High Radiation Area Significance Determination Process Operability Determination Maintenance Rule Program Fire Protection Program Power change Downpower |
ML102110448 | 25 July 2010 | Pilgrim Watch Notice to Commission Regarding New and Significant Information Pertaining to Pilgrim Watch'S Petition for Review of LBP-06-848 | Anticipated operational occurrence Aging Management License Renewal |
IR 05000293/2010201 | 23 July 2010 | IR 05000293-10-201, on 06/28/2010 - 07/01/2010, Pilgrim Nuclear Power Station, Target Set Inspection. Transmittal Letter | Affidavit |
TAC:ME3253 | 21 July 2010 | ||
ML101790341 | 21 July 2010 | G20100389/LTR-10-0270/EDATS: SECY-2010-0313 - Ltr, Gregory B. Jaczko Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant | |
ML101960036 | 21 July 2010 | RAI, Review of Relocation of Pressure-Temperature Limits to the Pressure and Temperature Limits Report | Finite Element Analysis Pressure and Temperature Limits Report |
ML101960025 | 21 July 2010 | Request for Additional Information to Support the Review of Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety Valves | Weak link |
ML102090024 | 19 July 2010 | Pilgrim Watch 2.206 Petition Regarding Inadequacy of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim Station | Anticipated operational occurrence Aging Management |
ML102020275 | 19 July 2010 | G20100454/EDATS: OEDO-2010-0589 - Mary Lampert Ltr. Re 2.206 - Inadequate of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim | Anticipated operational occurrence Aging Management |