Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML10266042830 September 2010LB Order (Confirming Matters Addressed at September 15, 2010, Telephone Conference)
IR 05000293/201000729 September 2010NRC Inspection Report 05000293/2010007
ML10266067629 September 20102010-09-29-NRC Staff Response to Secretary of the Commission Request for Further Consideration Regarding New and Significant Information Pertaining to Pilgrim Watch'S Petition for Review of LBP-06-848 Dated July 25, 2010
ML10270061427 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10273006327 September 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
TAC:ME450027 September 2010
ML10285036927 September 2010G20100527/EDATS: OEDO-2010-0688 - Transcript Mary Lampert 2.206 Regarding Hydrogeologic Assessment at Pilgrim Nuclear Power Station, Pages 1-33
ML10273004222 September 2010Pilgrim Watch Motion Regarding ASLB Refusal to Respond to Pilgrim Watch'S Motion for Clarification ASLB Order (Sept 2, 2010)Incorporated by reference
Chernobyl
ML10272041122 September 2010Notification Letter Designating Balance-of-Plant Systems within the Cyber Security Rule ScopeCyber Security
ML10265053622 September 2010Renewal Hearing - Action Request: Draft Conference Call Summaries for CommentVT-2
Aging Management
ML10272039921 September 2010Entergy'S Response to Pilgrim Watch'S Memo Re Proposed Schedule
ML10273078821 September 2010Pilgrim Watch'S Reply to Entergy'S Response to Pilgrim Watch'S Memo Regarding Proposed Schedule
ML10273078921 September 2010Memo Regarding Proposed Schedule
ML10274006921 September 2010Entergy Response to NRC Request for Additional Information Dated July 21, 2010, in Support of Proposed License Amendment for Pilgrim Setpoint & Setpoint Tolerance Increases for Safety Relief Valves (SRV) & Spring Safety Valves (Ssv), and ReHydrostatic
Pressure boundary leak
Weak link
ML10265022815 September 2010Transcript of Entergy Nuclear Generation Company Pilgrim Nuclear Power Station Telephone Conference, Wednesday, September 15, 2010, Pages 670-728
ML10263029213 September 2010Entergy'S Eighteenth Supplemental Disclosure
ML1025803189 September 2010Pilgrim Watch Motion for Clarification ASLB Order (Sept. 02, 2010)
ML1025306619 September 2010NRC Staff Supplement 27 to Hearing File
ML1025802407 September 2010Response to NRC Request for Additional Information Related to Relocation of Pressure-Temperatures (P-T) Curves to the Pressure and Temperature Limits ReportHydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
ML1027707003 September 2010G20100527/EDATS: OEDO-2010-0688 - E-mail from M. Lampert to R. Guzman 2.206 Petition on Hydro-geologic Assessments as Supplement to July 19, 2010, Petition Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station
ML1025202193 September 2010Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1024605372 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1024405931 September 2010Mid-Cycle Performance Review and Inspection Plan 2010 - Pilgrim Nuclear Power StationB.5.b Mitigating Strategies
ML10251013730 August 2010Response to NRC Request for Additional Information Dated June 3, 2010, in Support of Proposed License Amendment for Pilgrim Setpoint and Setpoint Tolerance Increases for Safety Relief Valves (SRV) and Spring SafeFuel cladding
ML10242032830 August 2010Project Manager Assignment
ML10239011727 August 2010Commission Memorandum and Order (CLI-10-22)
ML10229016325 August 2010Relief Request PRR-20, Alternative Examination Requirements for Nozzle-To-Shell and Inner Radii Welds Using ASME Code Case N-702 and BWRVIP-108 - Pilgrim Nuclear Power StationIncorporated by reference
ML10237127424 August 2010GALL Aging Management Program AMP M41 Buried Piping - Pilgrim Watch Comments (8/25/10)Non-Destructive Examination
Hydrostatic
Coatings
Aging Management
Moisture barrier
Through-Wall Leak
ML10238037917 August 2010Petition for Rulemaking of Raymond Shadis, Et. Al. on Behalf of the Friends of the Coast, Et. Al. on PRM 54-6 Regarding Seeking to Amend 10 CFR Section 54.17(c)Aging Management
Environment Report
ML10228056813 August 2010G20100527/EDATS: OEDO-2010-0688 - Mary Lampert and Rebecca Chin Ltr. Re 2.206 - Hydrogeologic Assessment at Pilgrim Nuclear Power StationAnticipated operational occurrence
Condition Adverse to Quality
ML10228000413 August 2010NRC Staff Supplement 25 to Hearing File
ML1022901989 August 2010G20100454/EDATS: OEDO-2010-0589 - Mary Lampert 2.206 Petition Transcript on Entergy Management of Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station
TAC:ME42669 August 2010
ENOC-10-00027, Comment (42) of John F. Mccann, on Behalf of Entergy Nuclear Operations, Inc., on Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment6 August 2010Comment (42) of John F. Mccann, on Behalf of Entergy Nuclear Operations, Inc., on Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment.Severe Accident Management Guideline
Earthquake
ML1022104116 August 2010G20100454/EDATS: OEDO-2010-0589 - Mary Lampert Ltr. Supplement (1) to Pilgrim Watch 2.206 Petition Regarding Inadequacy of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim StationAnticipated operational occurrence
Aging Management
ML1021500555 August 2010Cyber Security Amendment Withdrawal LetterCyber Security
ML1021705235 August 2010Order of the Secretary Regarding Pw Notice to Commission Regarding New and Significant Information Pertaining to Pw'S Petition for Review of LBP-06-848
ML1022401675 August 2010Response to RIS 2010-08 Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
TAC:ME435130 July 2010
ML10211010130 July 2010Acceptance of LAR Application for Cyber Security PlanCyber Security
ML10215022129 July 2010Entergy'S Seventeenth Supplemental Disclosure
IR 05000293/201000329 July 2010IR 05000293-10-003, on 04/01/10 - 06/30/10; Pilgrim Nuclear Power Station; Flood Protection MeasuresSafe Shutdown
High Radiation Area
Ultimate heat sink
Fire Barrier
Nondestructive Examination
Emergency Lighting
Locked High Radiation Area
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power change
Downpower
ML10211044825 July 2010Pilgrim Watch Notice to Commission Regarding New and Significant Information Pertaining to Pilgrim Watch'S Petition for Review of LBP-06-848Anticipated operational occurrence
Aging Management
License Renewal
IR 05000293/201020123 July 2010IR 05000293-10-201, on 06/28/2010 - 07/01/2010, Pilgrim Nuclear Power Station, Target Set Inspection. Transmittal LetterAffidavit
TAC:ME325321 July 2010
ML10179034121 July 2010G20100389/LTR-10-0270/EDATS: SECY-2010-0313 - Ltr, Gregory B. Jaczko Update on Status of the License Renewal Application for the Pilgrim Nuclear Power Plant
ML10196003621 July 2010RAI, Review of Relocation of Pressure-Temperature Limits to the Pressure and Temperature Limits ReportFinite Element Analysis
Pressure and Temperature Limits Report
ML10196002521 July 2010Request for Additional Information to Support the Review of Setpoint and Setpoint Tolerance Increases for Safety Relief Valves and Spring Safety ValvesWeak link
ML10209002419 July 2010Pilgrim Watch 2.206 Petition Regarding Inadequacy of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim StationAnticipated operational occurrence
Aging Management
ML10202027519 July 2010G20100454/EDATS: OEDO-2010-0589 - Mary Lampert Ltr. Re 2.206 - Inadequate of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at PilgrimAnticipated operational occurrence
Aging Management