IR 05000293-10-201, on 06/28/2010 - 07/01/2010, Pilgrim Nuclear Power Station, Target Set Inspection. Transmittal Letter
ML102020558
Person / Time
Site: Pilgrim
Issue date: 07/23/2010
From: West G
Division of Security Operations
To: Bronson K
Entergy Nuclear Operations
Shared Package
ML102020509 List:
References
IR-10-201
Download: ML102020558 (4)


Text

uly 23, 2010

SUBJECT:

PILGRIM NUCLEAR POWER STATION - TARGET SET INSPECTION 05000293/2010201

Dear Mr. Bronson:

On July 1, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a Target Set Inspection at the Pilgrim Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 1, 2010, with you and other members of the site staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA by Michael Buckley for/

Garmon West, Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-293 License No.: DPR-35 Enclosure: Inspection Report (IR) 05000293/2010201; June 28 - July 1, 2010; Pilgrim Nuclear Power Station; Target Set Inspection.

cc w/ encl: D. Bruke, Entergy Nuclear Operations J. Giarrusso, Massachusetts Energy Management Agency cc w/o encl: Vice President Operations, Entergy Nuclear Operations Vice President, Oversight Entergy Nuclear Operations Senior Manager Nuclear Safety & Licensing, Entergy Nuclear Operations Senior Vice President and COO, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations T. Murray, The State House R. Walker, Massachusetts Department of Public Health V. Demacedo, The State House Chairman, Plymouth Board of Selectman Chairman, Duxbury Board of Selectman Chairman, Nuclear Matter Committee, Plymouth Civil Defense Director D. OConnor, Massachusetts Division of Energy Resources J. Miller, Office of Senior John Kerry Office of the Commissioner, Massachusetts Department of Environmental Health Office of the Attorney General Electric Power Division, Massachusetts Commonwealth of Massachusetts R. Shadis, New England Collation Staff D. Katz, Nuclear Security Coalition Commonwealth of Massachusetts, Secretary of Public Safety