 Issue dateTitleTopic
NRC-10-0055, Notification Letter Designating Fermi 2 Balance of Plant Systems within the Cyber Security Rule Scope29 September 2010Notification Letter Designating Fermi 2 Balance of Plant Systems within the Cyber Security Rule ScopeCyber Security
ML11005013729 September 20102010 Fermi Initial License Examination - Post Exam Comment Clarification
ML10281048328 September 2010Technical Requirements Manual, Vol 1, Revision 99
ML10236057028 September 2010Evaluation of In-Service Testing Program Relief Requests VRR-011, VRR-012, and VRR-03 for Fermi 2Stroke time
ML10273006327 September 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10277011527 September 2010Degraded Voltage Setpoint As-Found Values
ML10270061427 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
NRC-10-0001, Request for Revision 1 to Radiological Emergency Response Preparedness Plan to Change Staff Augmentation Times24 September 2010Request for Revision 1 to Radiological Emergency Response Preparedness Plan to Change Staff Augmentation TimesHigh Radiation Area
Offsite Dose Calculation Manual
TAC:ME476124 September 2010
ML10264028716 September 2010U.S. Dept of Homeland Security/Final Report for the Radiological Emergency Preparedness (REP) Partial Participation Plume Pathway Exercise Conducted on June 8, 2010, for the Fermi 2 Nuclear Power Plant/Report
NRC-10-0069, 2010 Fermi Initial License Examination - Post Exam Comments Submittal16 September 20102010 Fermi Initial License Examination - Post Exam Comments SubmittalHalf scram
Ultimate heat sink
Fuel cladding
Offsite Circuit
ML10266015316 September 2010Final Report for the Radiological Emergency Preparedness (REP) Partial Participation Plume Pathway Exercise Conducted on June 8, 2010
ML10243017114 September 2010Request for Additional Information, License Amendment Request to Revise the Core Spray Flow Requirements
ML10258035513 September 2010Exemption Request from Biennial Emergency Preparedness Excercise Requirements - ME4459Exemption Request
ML1023805079 September 2010Correction Letter - Withdrawal of License Amendment Request Regarding Cyber Security PlanCyber Security
ML11104A0394 September 20102010 Fermi Initial Exam Questions and Responses Given During Administration of Written Exam
ML1100501113 September 20102010 Fermi Initial License Examination ES-201-1Job Performance Measure
ML1025202193 September 2010Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1024605372 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
IR 05000016/20100091 September 2010IR 05000016-10-009, on 08/05/10, Fermi Unit 1
ML1024400971 September 2010Mid-Cycle Performance Review and Inspection Plan - Fermi Nuclear Power Plant
ML1024503711 September 2010NRC Inspection Report 05000016-10-009(DNMS) - Enrico Fermi Unit 1
NRC-10-0064, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 201031 August 2010Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2010
ML11003088130 August 20102010 Fermi Initial License Examination - Proposed Scenarios
ML10299038630 August 2010RO & SRO Written Exam and Answer KeyShutdown Margin
Half scram
Post Accident Monitoring
Temporary Modification
Offsite Circuit
ML11003066530 August 20102010 Fermi Initial License Examination ES-301-1
ML11003077030 August 20102010 Fermi Initial License Examination ES-301-2
ML11003078330 August 20102010 Fermi Initial License Examination ES-301-5
ML11003078530 August 20102010 Fermi Initial License Examination Outline ES-401-1
ML11003078830 August 20102010 Fermi Initial License Examination Outline ES-401-3
ML11003079030 August 20102010 Fermi Initial License Examination ES-D-1
ML11003083630 August 20102010 Fermi Initial License Examination - Proposed Written
ML11003087130 August 20102010 Fermi Initial License Examination - Proposed JPMs
ML11005014830 August 20102010 Fermi Initial License Examination ES-301-6
ML11056023230 August 20102010 Fermi Power Plant Initial Examination Outline Submittal
ML11056027230 August 20102010 Fermi Power Plant Initial Examination Proposed Exam Files
ML11056028330 August 20102010 Fermi Power Plant Initial Examination Administrative Files
ML11056029830 August 20102010 Fermi Power Plant Initial Examination Miscellaneous CorrespondenceGeneric Fundamentals Examination
IR 05000341/201040330 August 2010IR 05000341-10-403 (DRS) on 07/26/2010 - 07/30/2010 for Fermi Power Plant, Unit 2, Routine Security Baseline Inspection - Cover Letter
IR 05000341/201001126 August 2010IR 05000341-10-011 (DRS) on 07/21/2010 08/06/2010 for Fermi Power Plant, Unit 2, Refueling and Other Outage Activities InspectionSignificance Determination Process
Control of Heavy Loads
NRC-10-0066, Comment (8) of Rodney W. Johnson, on Behalf of Detroit Edison, on NRC Draft Regulatory Guide DG-124826 August 2010Comment (8) of Rodney W. Johnson, on Behalf of Detroit Edison, on NRC Draft Regulatory Guide DG-1248
ML10238036426 August 2010Ltr. 08/26/2010 Fermi Re Operator Licensing Examination Approval
ML10294025626 August 20102010 Fermi Initial Licence Examination - as Administered JPMs
ML10294027726 August 20102010 Fermi Initial License Examination - as Administered Scenarios
ML11003079426 August 20102010 Fermi Initial License Examination ES-401-4
ML11005011626 August 20102010 Fermi Initial License Examination - Operating Test Review Comments
ML11005014326 August 20102010 Fermi Initial License Examination ES-401-9
NRC-10-0063, Additional Clarification Regarding Relief Request PRR-009 for the Inservice Testing Program Third Ten - Year Interval20 August 2010Additional Clarification Regarding Relief Request PRR-009 for the Inservice Testing Program Third Ten - Year Interval
ML10229031120 August 2010Withdrawal of License Amendment Request Cyber Security PlanCyber Security
ML10237131619 August 2010Acceptance Review - Fermi 2 - ME4459 - Exemption Request from the Biennial Emergency Preparedness Exercises RequirementsExemption Request