Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NRC-10-0055, Notification Letter Designating Fermi 2 Balance of Plant Systems within the Cyber Security Rule Scope | 29 September 2010 | Notification Letter Designating Fermi 2 Balance of Plant Systems within the Cyber Security Rule Scope | Cyber Security |
ML110050137 | 29 September 2010 | 2010 Fermi Initial License Examination - Post Exam Comment Clarification | |
ML102810483 | 28 September 2010 | Technical Requirements Manual, Vol 1, Revision 99 | |
ML102360570 | 28 September 2010 | Evaluation of In-Service Testing Program Relief Requests VRR-011, VRR-012, and VRR-03 for Fermi 2 | Stroke time |
ML102730063 | 27 September 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102770115 | 27 September 2010 | Degraded Voltage Setpoint As-Found Values | |
ML102700614 | 27 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
NRC-10-0001, Request for Revision 1 to Radiological Emergency Response Preparedness Plan to Change Staff Augmentation Times | 24 September 2010 | Request for Revision 1 to Radiological Emergency Response Preparedness Plan to Change Staff Augmentation Times | High Radiation Area Offsite Dose Calculation Manual |
TAC:ME4761 | 24 September 2010 | ||
ML102640287 | 16 September 2010 | U.S. Dept of Homeland Security/Final Report for the Radiological Emergency Preparedness (REP) Partial Participation Plume Pathway Exercise Conducted on June 8, 2010, for the Fermi 2 Nuclear Power Plant/Report | |
NRC-10-0069, 2010 Fermi Initial License Examination - Post Exam Comments Submittal | 16 September 2010 | 2010 Fermi Initial License Examination - Post Exam Comments Submittal | Half scram Ultimate heat sink Fuel cladding Offsite Circuit |
ML102660153 | 16 September 2010 | Final Report for the Radiological Emergency Preparedness (REP) Partial Participation Plume Pathway Exercise Conducted on June 8, 2010 | |
ML102430171 | 14 September 2010 | Request for Additional Information, License Amendment Request to Revise the Core Spray Flow Requirements | |
ML102580355 | 13 September 2010 | Exemption Request from Biennial Emergency Preparedness Excercise Requirements - ME4459 | Exemption Request |
ML102380507 | 9 September 2010 | Correction Letter - Withdrawal of License Amendment Request Regarding Cyber Security Plan | Cyber Security |
ML11104A039 | 4 September 2010 | 2010 Fermi Initial Exam Questions and Responses Given During Administration of Written Exam | |
ML110050111 | 3 September 2010 | 2010 Fermi Initial License Examination ES-201-1 | Job Performance Measure |
ML102520219 | 3 September 2010 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102460537 | 2 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
IR 05000016/2010009 | 1 September 2010 | IR 05000016-10-009, on 08/05/10, Fermi Unit 1 | |
ML102440097 | 1 September 2010 | Mid-Cycle Performance Review and Inspection Plan - Fermi Nuclear Power Plant | |
ML102450371 | 1 September 2010 | NRC Inspection Report 05000016-10-009(DNMS) - Enrico Fermi Unit 1 | |
NRC-10-0064, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2010 | 31 August 2010 | Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2010 | |
ML110030881 | 30 August 2010 | 2010 Fermi Initial License Examination - Proposed Scenarios | |
ML102990386 | 30 August 2010 | RO & SRO Written Exam and Answer Key | Shutdown Margin Half scram Post Accident Monitoring Temporary Modification Offsite Circuit |
ML110030665 | 30 August 2010 | 2010 Fermi Initial License Examination ES-301-1 | |
ML110030770 | 30 August 2010 | 2010 Fermi Initial License Examination ES-301-2 | |
ML110030783 | 30 August 2010 | 2010 Fermi Initial License Examination ES-301-5 | |
ML110030785 | 30 August 2010 | 2010 Fermi Initial License Examination Outline ES-401-1 | |
ML110030788 | 30 August 2010 | 2010 Fermi Initial License Examination Outline ES-401-3 | |
ML110030790 | 30 August 2010 | 2010 Fermi Initial License Examination ES-D-1 | |
ML110030836 | 30 August 2010 | 2010 Fermi Initial License Examination - Proposed Written | |
ML110030871 | 30 August 2010 | 2010 Fermi Initial License Examination - Proposed JPMs | |
ML110050148 | 30 August 2010 | 2010 Fermi Initial License Examination ES-301-6 | |
ML110560232 | 30 August 2010 | 2010 Fermi Power Plant Initial Examination Outline Submittal | |
ML110560272 | 30 August 2010 | 2010 Fermi Power Plant Initial Examination Proposed Exam Files | |
ML110560283 | 30 August 2010 | 2010 Fermi Power Plant Initial Examination Administrative Files | |
ML110560298 | 30 August 2010 | 2010 Fermi Power Plant Initial Examination Miscellaneous Correspondence | Generic Fundamentals Examination |
IR 05000341/2010403 | 30 August 2010 | IR 05000341-10-403 (DRS) on 07/26/2010 - 07/30/2010 for Fermi Power Plant, Unit 2, Routine Security Baseline Inspection - Cover Letter | |
IR 05000341/2010011 | 26 August 2010 | IR 05000341-10-011 (DRS) on 07/21/2010 08/06/2010 for Fermi Power Plant, Unit 2, Refueling and Other Outage Activities Inspection | Significance Determination Process Control of Heavy Loads |
NRC-10-0066, Comment (8) of Rodney W. Johnson, on Behalf of Detroit Edison, on NRC Draft Regulatory Guide DG-1248 | 26 August 2010 | Comment (8) of Rodney W. Johnson, on Behalf of Detroit Edison, on NRC Draft Regulatory Guide DG-1248 | |
ML102380364 | 26 August 2010 | Ltr. 08/26/2010 Fermi Re Operator Licensing Examination Approval | |
ML102940256 | 26 August 2010 | 2010 Fermi Initial Licence Examination - as Administered JPMs | |
ML102940277 | 26 August 2010 | 2010 Fermi Initial License Examination - as Administered Scenarios | |
ML110030794 | 26 August 2010 | 2010 Fermi Initial License Examination ES-401-4 | |
ML110050116 | 26 August 2010 | 2010 Fermi Initial License Examination - Operating Test Review Comments | |
ML110050143 | 26 August 2010 | 2010 Fermi Initial License Examination ES-401-9 | |
NRC-10-0063, Additional Clarification Regarding Relief Request PRR-009 for the Inservice Testing Program Third Ten - Year Interval | 20 August 2010 | Additional Clarification Regarding Relief Request PRR-009 for the Inservice Testing Program Third Ten - Year Interval | |
ML102290311 | 20 August 2010 | Withdrawal of License Amendment Request Cyber Security Plan | Cyber Security |
ML102371316 | 19 August 2010 | Acceptance Review - Fermi 2 - ME4459 - Exemption Request from the Biennial Emergency Preparedness Exercises Requirements | Exemption Request |