MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] |
Text
2010 FERMI POWER PLANT INITIAL EXAMINATION OUTLINE SUBMITTAL
ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Fermi 2 Date of Examination: AugusVSeptember 2010 Initials Item Task Description
- 1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401 w
R b. Assess whether the outline was systematically and randomly prepared in accordance with I Section D . l of ES-401 and whether all WA categories are appropriately sampled.
T T c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
E N d. Assess whether the iustifications for deselected or rejected WA statements are armorxiate.
- 2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S and major transients.
I M b. Assess whether there are enough scenario sets (and spares) to test the projected number U and mix of applicants in accordance with the expected crew composition and rotation schedule L without compromising exam integrity, and ensure that each applicant can be tested using A at least one new or significantly modified scenario, that no scenarios are duplicated T from the applicants audit test(s), and that scenarios will not be repeated on subsequent days.
0
- c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R
and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
- 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and in-plant tasks w distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants audit test(s)
(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.
- b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
- c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
- a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections. w
- b. Assess whether the 10 CFR 55.41143 and 55.45 sampling is appropriate.
- c. Ensure that WA importance ratings (except for plant-specific priorities) are at least 2.5.
- d. Check for duplication and overlap among exam sections.
- e. Check the entire exam for balance of coveraae.
- f. Assess whether the exam fits the appropriate job level (RO or SRO).
Author 3 G O . k b a. ~ eser P r i n t a m ) h 1 Facility Reviewer (*)
NRC Chief Examiner (#)
NRC Supervisor I
lote: # Independent NRC reviewer initial items in Column c; chief examiner concurrence required.
Not applicable for NRC-prepared examination outlines