September 1, 2010

Mr. Joseph Plona, Site Vice President

Nuclear Generation

The Detroit Edison Company

6400 North Dixie Highway

Newport, MI 48166

SUBJECT: NRC INSPECTION REPORT 050-00016/10-09(DNMS) - ENRICO

FERMI UNIT 1

Dear Mr. Plona:

On August 5, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at

the Enrico Fermi Unit 1 facility. The purpose of the inspection was to determine whether

decommissioning activities were conducted safely and in accordance with NRC requirements.

At the conclusion of the inspection on August 5, 2010, the NRC inspector discussed the findings

with members of your staff.

The inspection consisted of an examination of activities at the facility as they relate to safety and

compliance with the Commissions rules and regulations. Areas examined during the inspection

included facility management and control, radiological safety and your implementation of the

Industry Ground Water Protection Voluntary Initiative. Within these areas, the inspection

consisted of a selective examination of procedures and representative records, field

observations of activities in progress, and interviews with personnel.

Based on the results of this inspection, the NRC did not identify any violations.

In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of

Practice," a copy of this letter and its enclosure will be available electronically for public

inspection in the NRC Public Document Room or from the NRC's Agencywide Document

Access and Management system (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html.

J. Plona -2-

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/RA/

Christine A. Lipa, Chief

Materials Control, ISFSI, and

Decommissioning Branch

Docket No. 050-00016

License No. DPR-9

Enclosure:

Inspection Report 050-00016/10-09(DNMS)

cc w/encl: L. Goodman, Manager, Fermi 1

W. Colonnello, Director, Nuclear Support

Michigan Department of Environmental Quality,

Waste and Hazardous Materials Division

K. Yale, Chief, State Liaison Officer, State of Michigan

Supervisor - Electric Operators,

Wayne County Emergency Management Division

cc w/encl: Distribution via ListServ

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Docket No. 050-00016

License No. DPR-9

Report No. 050-00016/10-09(DNMS)

Licensee: Detroit Edison Company

Facility: Enrico Fermi Unit 1

Location: 6400 North Dixie Highway

Newport, MI 48166

Inspection Dates: June 10, 2010 (Ground Water

Protection Initiative)

August 4 and 5, 2010 (Decommissioning)

Inspector: Peter J. Lee, Ph.D., CHP, Health Physicist

Mark Mitchell, Health Physicist

Approved by: Christine A. Lipa, Chief

Materials Control, ISFSI, and

Decommissioning Branch

Division of Nuclear Materials Safety

Enclosure

EXECUTIVE SUMMARY

Enrico Fermi Unit 1

NRC Inspection Report 050-00016/10-09(DNMS)

This routine decommissioning inspection included reviews of facility management and control,

and radiological safety. A region-based inspector also completed an on-site review of the

implementation of the Industry Ground Water Protection Initiative.

Facility Management and Control

The inspector determined that the licensees safety evaluation of cutting the reactor

vessel was in compliance with the requirements of Title 10 Code of Federal Regulations

(CFR) Part 50.59 and the dose to the general public is bounded by the licensees final

safety analysis report, accident analyses of airborne release. (Section 1.1)

The inspector determined that the licensee maintained adequate staffing levels and

training to effectively continue the decommissioning process. (Section 1.2)

The inspector concluded that the conditions of the facility and equipment were adequate

and capable of supporting the decommissioning activities. (Section 1.3)

The inspector determined that the licensee adequately implemented the audits of

radiation protection in accordance with its Quality Assurance Program. (Section 1.4)

Radiological Safety

The inspector determined that the licensee continued to be effective in preventing the

spread of contamination and in maintaining dose to workers well below the regulatory

limits. (Section 2.1)

Industry Ground Water Protection Voluntary Initiative

The inspectors verified that the licensee implemented the Industry Ground Water

Protection Voluntary Initiative. No findings or violations were identified.

2 Enclosure

Report Details1

Summary of Plant Activities

During the inspection period, the licensee was performing decommissioning activities,

specifically cutting the upper section of reactor vessel and preparing for the removal of reactor

vessel segments.

1.0 Facility Management and Control

1.1 Safety Reviews, Design Changes, and Modifications (IP 37801)

a. Inspection Scope

The inspector reviewed the licensees safety evaluation of cutting the reactor vessel

(RV) to verify that the completed evaluation was consistent with the requirements of

10 CFR Part 50.59.

b. Observations and Findings

The licensee conducted the safety evaluation of cutting the reactor vessel against the

final safety analysis report (FSAR). There are two possible sources of the radioactivity

that could transfer from the RV to the HEPA filter; one is the internal surface

contamination of the RV and the other is the activation products in the fine particles

generated during the cutting. The postulated accident that would potentially release the

contamination activity and fines activity entrained in a HEPA filter would be a fire that

occurs and engulfs the filter. The calculated dose is based on the conservative

assumption that 100% of the activity would become airborne. Based on the above

assumptions, the calculated dose to the general public is below the current FSAR

accident analyses of airborne release. Since most of the cutting wont generate airborne

or respirable activity, the actual dose should be much lower.

c. Conclusions

The inspector determined that the licensees safety evaluation of cutting the reactor

vessel was in compliance with the requirements of 10 CFR Part 50.59 and the dose to

the general public is bounded by FSAR accident analyses of airborne release.

1.2 Organization, Management and Cost Controls (36801)

a. Inspection Scope

The inspector evaluated the licensees decommissioning staffing to determine whether

the licensee maintained adequate staffing levels to effectively conduct its

decommissioning activities. The inspector reviewed records of the required training for

the licensee personnel and contractor workers.

¹A list of acronyms used and all documents reviewed in these Details are provided at the end of the report.

3 Enclosure

b. Observations and Findings

The licensee conducted training for licensee personnel and contractor workers in

accordance with the provisions of the licensees training program. The training included

topics such as radiation protection, sodium handling safety, asbestos awareness, and

confined space safety.

c. Conclusions

The inspector determined that the licensee maintained adequate staffing levels and

training to effectively continue the decommissioning process.

1.3 Decommissioning Performance and Status Review at Permanently Shut Down Reactors

a. Inspection Scope (71801)

The inspector toured the plant to assess the working conditions during the

decommissioning activities.

b. Observations and Findings

During the inspection, contract workers were cutting the upper section of the reactor

vessel and preparing for the removal of reactor vessel segments. Workers wore

appropriate protective equipment and followed established procedures. The licensee

maintained the work location with adequate shielding, personnel barriers, and high

efficiency particulate air (HEPA) filter exhaust systems, all to minimize worker doses. All

radiological areas were adequately marked and posted.

c. Conclusions

The inspector concluded that the conditions of the facility and equipment were adequate

and capable of supporting the decommissioning activities.

1.4 Self-Assessment, Auditing, and Corrective Action (40801)

a. Inspection Scope

The inspector reviewed the licensees audit of its radiation protection program

(Audit 09-0112) conducted from October 26, through November 13, 2009. Selected

corrective action work orders associated with identified deficiencies were also reviewed.

b. Observations and Findings

The audit of the radiation protection program (Audit 09-0112) was appropriately focused

in both scope and level of detail, and the licensee initiated appropriate corrective actions

to resolve the audit findings.

c. Conclusions

The inspector determined that the licensee adequately implemented the audits of

radiation protection in accordance with its Quality Assurance Program.

4 Enclosure

2.0 Radiological Safety

2.1 Occupational Radiation Exposure (83750)

a. Inspection Scope

The inspector interviewed licensee personnel and reviewed the work request and the as-

low-as-reasonably-achievable review (ALARA) review for the cutting up and the removal

of the reactor vessel segments to evaluate the effectiveness of licensee controls to

minimize the potential radiation exposure to the workers.

b. Observations and Findings

The ALARA review provided the administrative controls to minimize or avoid

unnecessary dose to the workers. The engineering controls such as enclosures with

additional HEPA ventilation and shielding were effectively controlling the workers

internal and external exposures, and the spread of contamination.

Most of the contamination generated during the cutting operation would not be expected

to become airborne. There may be some airborne contaminants but most of them are

irrespirable. Therefore, there is no internal radiation exposure concerns for the worker.

The cutting operation is done through remote control via camera. Also a telemetry

system is currently in use in the reactor area to remotely control the workers exposures.

Because of that, the workers external exposures will be significantly reduced to levels

that are ALARA.

c. Conclusions

The inspector determined that the licensee continued to be effective in preventing the

spread of contamination and in maintaining dose to workers well below the regulatory

limits.

3.0 (Closed) NRC Temporary Instruction 2515/173 Review of the Industry Groundwater

Protection Voluntary Initiative for Fermi Unit 1 (The Fermi 2 program review was

previously completed and is documented in IR No. 050-00341/10-02)

a. Inspection Scope

An NRC assessment was performed on the licensees implementation of the Nuclear

Energy Institute - Ground Water Protection Initiative (NEI-GPI) (dated August 2007

(ML072610036)), at the Fermi Power Plant. Under the voluntary initiative, each nuclear

plant site was to have developed an effective, technically sound groundwater protection

program that aligned with the NEI initiative by August 2008.

The inspectors assessed whether the licensee evaluated work practices that could lead

to leaks, spills, and performed an evaluation of systems, structures, and components,

that contain licensed radioactive material to determine potential leak or spill

mechanisms.

5 Enclosure

The inspectors determined whether the licensee completed a site characterization of

geology and hydrology to determine the predominant ground water gradients and

potential pathways for ground water migration from onsite locations to offsite locations.

The inspectors also determined whether an onsite ground water monitoring program had

been implemented to monitor potential licensed radioactive leakage into groundwater

and whether the licensee had provisions for reporting its ground water monitoring

results. (See http://www.nrc.gov/reactors/operating/ops-experience/tritium/plant-

info.html)

The inspectors reviewed the licensees procedures for the decision making process for

potential remediation of leaks and spills, including consideration of the long term

decommissioning impacts. The inspectors also determined whether records of leaks

and spills were being recorded in the licensees decommissioning files in accordance

with 10 CFR 50.75(g).

The inspectors reviewed the licensees notification protocols to determine whether they

were consistent with the Groundwater Protection Initiative. The inspectors assessed

whether the licensee identified the appropriate local and state officials and conducted

briefings on the licensees ground water protection initiative. The inspectors also

assessed whether protocols were established for notification of the applicable local and

state officials regarding detection of leaks and spills.

b. Observations and Findings

No findings of significance were identified.

c. Conclusions

The inspectors verified that the licensee implemented the Industry Ground Water

Protection Voluntary Initiative. No findings or violations were identified.

4.0 Exit Meetings

  • The inspector presented the inspection results to members of the licensees staff

at the conclusion of the inspection on August 5, 2010. The licensee did not

identify any of the documents or processes reviewed by the inspector as

proprietary.

Groundwater Protection Voluntary Initiative inspection were discussed with the

Manager, Fermi I, Ms. L. Goodman, on June 10, 2010. The inspectors confirmed

that none of the potential report input discussed was considered proprietary.

Proprietary material received during the inspection was returned to the licensee.

ATTACHMENT: SUPPLEMENTAL INFORMATION

6 Enclosure

SUPPLEMENTAL INFORMATION

PARTIAL LIST OF PERSONS CONTACTED

  • L. Goodman, Manager, Fermi 1

W. Colonnello, Director, Nuclear Support, Fermi 1

  • S. Stasek, Chairman, Review Committee, Fermi 1
  • M. Erickson, License Termination Manager
  • K. Lindsey, Radiation Protection Supervisor

D. Breiding, Reactor Project Manager

D. Swindle, Sodium Project Manager

  • C. Aldridge-Nunn, Office Administration
  • L. Davis, Office Specialist
  • Present at the August 5, 2010, exit meeting.

LIST OF PROCEDURES USED

IP 37801: Safety Reviews, Design Changes, and Modifications

IP 83750: Occupational Radiation Exposure

IP 71801: Decommissioning Performance and Status Review at Permanently Shut Down

Reactors

IP 36801: Organization, Management and Cost Controls

IP 40801: Self-Assessment, Auditing, and Corrective Action

TI 2515/173 Review of the Industry Ground Water Protection Voluntary Initiative

LIST OF ACRONYMS USED

ADAMS Agency Document and Management System

ALARA As Low as is Reasonably Achievable

CFR Code of Federal Regulations

DAC Derived Air Concentrations

DNMS Division of Nuclear Materials Safety

FSAR Final Safety Analysis Report

HEPA High Efficiency Particulate Air

IP Inspection Procedure

NRC Nuclear Regulatory Commission

TI Temporary Instruction

LICENSEE DOCUMENTS REVIEWED

The following is a list of documents reviewed during the inspection. Inclusion on this list does

not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that

selected sections of portions of the documents were evaluated as part of the overall inspection

effort. Inclusion of a document on this list does not imply NRC acceptance of the document or

any part of it, unless this is stated in the body of the inspection report.

Attachment

4OA5 Other Activities

EF 1-04-017, Work Request for Ground Water Environmental Sampling; February 2004

EF 1-10-002, Work Request Procedure; Revision 113

06-0059, 2006 Annual Environmental Report; dated August 28, 2006

07-0048, 2007 Annual Environmental Report; dated August 27, 2007

ITEMS OPENED, CLOSED, AND DISCUSSED

None

2 Attachment

J. Plona -2-

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/RA/

Christine A. Lipa, Chief

Materials Control, ISFSI, and

Decommissioning Branch

Docket No. 050-00016

License No. DPR-9

Enclosure:

Inspection Report 050-00016/10-09(DNMS)

cc w/encl: L. Goodman, Manager, Fermi 1

W. Colonnello, Director, Nuclear Support

Michigan Department of Environmental Quality,

Waste and Hazardous Materials Division

K. Yale, Chief, State Liaison Officer, State of Michigan

Supervisor - Electric Operators,

Wayne County Emergency Management Division

cc w/encl: Distribution via ListServ

DISTRIBUTION:

Susan Bagley S. Orth C. Ariano

RidsNrrDorlLpl3-1 P. Louden L. Linn

Resource R. Orlikowski DRPIII

RidsNrrPMFermi2 M. Morris DRSIII

Resource M. Mitchell P. Buckley

RidsNrrDirsIrib Resource J. Giessner T. Tomczak

B. Watson B. Dickson ROPreports Resource

T. Smith M. Phillips MCID

S. Reynolds J. Heck

A. Barker

  • See previous concurrence

DOCUMENT NAME: G:\Work in progress\IR- FERMI Unit 1 2010 009 DNMS.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy

OFFICE RIII DNMS RIII DNMS RIII RIII

NAME PJLee CALipa

DATE 08/03/10 09/01/10