Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09279015030 September 2009Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC ME0274) and Amendment #4Fire Barrier
Coatings
Aging Management
License Renewal
Fire Protection Program
Power Uprate
Measurement Uncertainty Recapture
ML09261030929 September 2009Scoping and Screening Audit Report Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal ApplicationAging Management
License Renewal
IR 05000302/200900628 September 2009IR 05000302-09-006; 07/27/2009 - 08/14/2009; Crystal River Nuclear Plant, Unit 3; License Renewal InspectionBoric Acid
Fire Barrier
Coatings
VT-2
Aging Management
Local Leak Rate Testing
Flow Accelerated Corrosion
Stress corrosion cracking
Eddy Current Testing
Moisture barrier
License Renewal
Biofouling
Fire Protection Program
Thermography
ML09289064728 September 20092009 Reactor Operator and Senior Reactor Operator Written Examination Package and Post-Exam CommentsHydrostatic
Job Performance Measure
Operational leakage
3F0909-05, 10 CFR 21 Report, Concerning Spare Safety-Related Limitorque Actuator Motor with Magnesium Rotor Purchased from Areva Np, Inc., in 2007 and Received in 200825 September 200910 CFR 21 Report, Concerning Spare Safety-Related Limitorque Actuator Motor with Magnesium Rotor Purchased from Areva Np, Inc., in 2007 and Received in 2008Commercial Grade
ML09237066922 September 2009Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Unit Plant, License Renewal ApplicationAging Management
License Renewal
ML09265027218 September 2009Response to Requests for Additional Information for the Review of the License Renewal Application and Amendment #3Safe Shutdown
Boric Acid
Safe Shutdown Earthquake
Incorporated by reference
Aging Management
Stress corrosion cracking
License Renewal
Control of Heavy Loads
Dissimilar Metal Weld
Power Uprate
Measurement Uncertainty Recapture
Exclusive Use
Affidavit
ML09261045917 September 2009Operator Licensing Written Examination Approval 05000302/2009301
3F0909-01, Submittal of Core Operating Limits Report, Cycle 16, Revision 416 September 2009Submittal of Core Operating Limits Report, Cycle 16, Revision 4Shutdown Margin
ML10292009216 September 2009PSC Field and Quality Control ManualSafe Shutdown
Fire Watch
ML09258009511 September 2009Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment #2Safe Shutdown
Aging Management
License Renewal
Earthquake
Power Uprate
Measurement Uncertainty Recapture
ML09216021311 September 2009Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal ApplicationBoric Acid
Non-Destructive Examination
Fire Barrier
Weld Overlay
Coatings
Nondestructive Examination
VT-2
Aging Management
Flow Accelerated Corrosion
Stress corrosion cracking
Moisture barrier
License Renewal
Power Uprate
Measurement Uncertainty Recapture
Thermal fatigue
ML09260088911 September 2009Areva Np, Inc., 51-9057252-001, Rev. 1, CR3 Reconciliation of 60-Year Fluence Projections Used in Reactor Vessel Beltline Embrittlement Calculations for License Renewal, Enclosure Attachment 3Anticipated operational occurrence
Hydrostatic
License Renewal
Power Uprate
Measurement Uncertainty Recapture
ML09260088811 September 2009Response to Request for Additional Information for the Review of the License Renewal ApplicationLicense Renewal
Exclusive Use
Affidavit
ML10203045410 September 2009DOE Eia 2010 Crystal River, Unit 3
ML0927402666 September 2009G20090524/EDATS: OEDO-2009-0560 - Charlie J. Callier Ltr. 2.206 - Progress Energy Florida, Inc
ML0924603583 September 2009Notification of Inspection and Request for InformationBoric Acid
Nondestructive Examination
VT-2
ML0923309042 September 2009Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal ApplicationCoatings
Aging Management
License Renewal
ML0924403661 September 2009Mid Cycle Report 22, Inspection/ Activity Plan 09/01/2009 - 12/31/2010
ML0924403561 September 2009Mid Cycle Performance Review and Inspection Plan - Crystal River Nuclear PlantLicense Renewal
ML09233034331 August 2009Nuclear Generating Plant, RAI, License Renewal ApplicationLicense Renewal
ML09233083131 August 2009Request for Additional Information Regarding License Renewal ApplicationFire Barrier
Coatings
Aging Management
License Renewal
Fire Protection Program
ML09233000731 August 2009RAI for the Review of the Crystal River Unit 3 Nuclear Generating Plant, LRALicense Renewal
Measurement Uncertainty Recapture
ML10215026631 August 2009Rev. 5 to Crystal River Units 1, 2 & 3 Storm Water Pollution Prevention & Best Management Practices Plan.High winds
ML09240024028 August 2009Notification of Inspection and Request for InformationHigh Radiation Area
Process Control Program
3F1109-06, State of Florida Department of Environmental Protection, Conditions of Certification28 August 2009State of Florida Department of Environmental Protection, Conditions of Certification
3F0809-04, Response to NRC Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing Examinations.27 August 2009Response to NRC Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
ML09238039226 August 200908/11-12/2009-Summary of Meeting Re 2009 Us NRC Initial Exam Development Workshop
ML09239011825 August 2009Response to Individual Plant Actions Regarding Pressurized-Water Reactor Owners Group Topical Report, BAW-2374, Revision 2, Risk-informed Assessment of Once-Through Steam Generator Tube Thermal Loads Due to Breaks in Reactor.
TAC:ME179925 August 2009
ML09225070120 August 2009Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal ApplicationSafe Shutdown
Aging Management
License Renewal
ML09202001220 August 2009RAI, License Renewal ApplicationStress corrosion cracking
License Renewal
Dissimilar Metal Weld
Power Uprate
ML09231000519 August 2009Public Meeting Summary - License Renewal Inspection Results Crystal River Nuclear PlantLicense Renewal
ML09208004514 August 2009Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal ApplicationSafe Shutdown
Aging Management
License Renewal
Power Uprate
Measurement Uncertainty Recapture
ML09203020814 August 2009Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal ApplicationAging Management
License Renewal
TAC:ME010713 August 2009
ML09229085513 August 2009E-Mail from Philip Rose to Farideh Saba - Clarification to Emergency Diesel Generator Voltage and Frequency Limits Amendment (ME0107)
TAC:ME073012 August 2009
ML09223001312 August 2009NRC Response to Crystal River Nuclear Plant, Unit No. 3 - Request for Withholding Information from Public DisclosureAffidavit
ML09197006810 August 2009Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Crystal River Unit 3 Nuclear Generating Plant License Renewal ApplicationHigh winds
Fire Barrier
Internal Flooding
Large early release frequency
License Renewal
Power Uprate
Press Release-II-09-044, NRC to Discuss Results of License Renewal Inspection for Crystal River Nuclear Power Plant5 August 2009Press Release-II-09-044: NRC to Discuss Results of License Renewal Inspection for Crystal River Nuclear Power PlantAging Management
License Renewal
IR 05000302/20094034 August 2009Nuclear Generating Plant - NRC Security Inspection Report 05000302/2009403Affidavit
3F0809-01, License Amendment Request 304, Revision 1 Emergency Diesel Generator Voltage and Frequency Limits Revision4 August 2009License Amendment Request #304, Revision 1 Emergency Diesel Generator Voltage and Frequency Limits RevisionSafe Shutdown
Stroke time
Anticipated operational occurrence
Offsite Circuit
ML0917400703 August 2009Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal ApplicationLicense Renewal
ML09166055930 July 2009Audit Report Regarding the LRA for the Crystal River, Unit 3License Renewal
ML09217038022 July 2009Letter from Mary Ann Poole, Florida Fish and Wildlife Conservation Commission to David Wrona, Response to Request for a List of Protected Species within the Area of Crystal River Unit 3, License Renewal Application Review, Citrus CountyLicense Renewal
3F0709-03, Updates and Revisions to License Amendment Request Made on 12/16/200822 July 2009Updates and Revisions to License Amendment Request Made on 12/16/2008Aging Management
License Renewal
IR 05000302/200900317 July 2009IR 05000302-09-003 and 05000302-09-501 on 04/01/2009 - 06/30/2009 and 05/04/2009 - 05/09/2009 for Crystal River, Unit 3: Routine Integrated ReportHigh winds
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Coatings
Temporary Modification
Arc flash
Functionality Assessment
Operability Determination
Maintenance Rule Program
Fire Protection Program
ML0918204658 July 2009Plan for the Aging Management Program Regulatory Audit Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application ReviewAging Management
License Renewal