ML092290855

From kanterella
Jump to navigation Jump to search

E-Mail from Philip Rose to Farideh Saba - Clarification to Emergency Diesel Generator Voltage and Frequency Limits Amendment (ME0107)
ML092290855
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/13/2009
From: Rose P
Progress Energy Co
To: Farideh Saba
Office of Nuclear Reactor Regulation
SABA F, NRR/DORL/LPLI-2, 415-1453
References
TAC ME0107
Download: ML092290855 (1)


Text

From:

Saba, Farideh Sent:

Monday, August 17, 2009 3:17 PM To:

Caponiti, Kathleen

Subject:

FW: Phone call From: Rose, Philip [1]

Sent: Thursday, August 13, 2009 11:38 AM To: Saba, Farideh Cc: Endsley, Jeffrey S.; Kish, Charles J.; Prieto, Fidel; Marckese, Robert J.; Wunderly, Blair P; Rahman, Matee U.; Westcott, Daniel

Subject:

Phone call Farideh, The CR-3 participants on the LAR 304, Revision 1 phone call this morning were:

Phil Rose - Licensing Bob Marckese-Supervisor Technical Support Engineering Charlie Kish - Fire Protection/Appendix R Engineer Fidel Prieto - Supervisor Design Engineering, Electrical and I&C Jeff Endsley - Design Engineer, Electrical Matee Rahman - Design Engineer, Electrical Blair Wunderly - Superintendent Technical Support Engineering In summary, CR-3 stated that in the event of a fire that requires immediate evacuation of the control room, the only action that would occur before leaving is tripping of the reactor. Should this condition occur, the Emergency Diesel Generator will not be overloaded.

Phil Rose Licensing Engineer Licensing and Regulatory Programs Crystal River Unit 3 (NA1B) 15760 W. Powerline Street Crystal River, FL 34428-6708 352-563-4883 E-mail Properties Mail Envelope Properties (B4ECC0E252653F48B3F57C3B833465E8101C6314B6)

Subject:

FW: Phone call Sent Date: 8/17/2009 3:17:23 PM Received Date: 8/17/2009 3:17:23 PM From: Saba, Farideh

Created By: Farideh.Saba@nrc.gov Recipients:

Kathleen.Caponiti@nrc.gov (Caponiti, Kathleen)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 14400 8/17/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: