Updates and Revisions to License Amendment Request Made on 12/16/2008
ML092080194
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/22/2009
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0709-03
Download: ML092080194 (5)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 54 July 22, 2009 3F0709-03 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Amendment #1 to the Application for Renewal of Operating License

Reference:

CR-3 to NRC letter, 3F1208-01, dated December 16, 2008: "Crystal River Unit 3

- Application for Renewal of Operating License"

Dear Sir:

On December 16, 2008, Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc., requested renewal of the operating license for the Crystal River Unit 3 Nuclear Generating Plant (CR-3) to extend the term of its operating license an additional 20 years beyond the current expiration date. Several updates and revisions to the License Renewal Application (LRA) have been identified since the LRA was submitted. The necessary changes, as well as the sources of the changes, are identified in the attachment to this letter.

No regulatory commitments are contained in this submittal.

Please refer any questions regarding this submittal to Mr. Mike Heath, Supervisor - License Renewal, at (910) 457-3487, e-mail at mike.heath,pqnmail.com.

Sincerely, Jon A. Franke Vice President Crystal River Unit 3 JAF/dwh

Attachment:

Amendment #1 to the Application for Renewal of Operating License xc:

NRC CR-3 Project Manager NRC License Renewal Project Manager NRC Regional Administrator, Region II Senior Resident Inspector Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428

U. S. Nuclear Regulatory Commission 3F0709-03 Page 2 of 2 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation, doing business as Progress Energy Florida, Inc.; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, infor d be

  • on A. Franke Vice President Crystal River Nuclear Plant The foregoing document was acknowledged before me this 9C2 day of 2009, by Jon A. Franke.

Signature of Notary Public State of Florida dl-*F.

M".OPt s

mmo E* A, t, 2o0o[

COffuikal 8 DD) 524380 (Print, type, or stamp Commissioned Name of Notary Public)

PersonallyL,

-OR-Produced Identification

PROGRESS ENERGY FLORIDA, INC.

CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50 - 302 / LICENSE NUMBER DPR - 72 ATTACHMENT Amendment #1 to the Application for Renewal of Operating License

U. S. Nuclear Regulatory Commission 3F0709-03 Attachment Page 1 of 2 Amendment #1 to the Application for Renewal of Operating License Source of License Renewal Application Amendment 1 Changes Change Progress Energy-Revise the first sentence in the third paragraph in Section 2.0 on page 2.0-1 to clarify Identified Change the exceptions taken to NEI 95-10. The revised sentence should read:

The Crystal River Unit 3 (CR-3) license renewal review methodology is consistent with the approach recommended in NEI 95-10, "Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule," Revision 6, Nuclear Energy Institute, June 2005 (hereinafter referred to as NEI 95-10) with exceptions as noted in Subsections 2.1.1.1, 2.1.1.2, and Section 3.0 of this application.

CR-3 Letter to The response to the Request for Additional Information (RAI) in CR-3 letter to NRC, NRC, 3F0509-01, 3F0509-01, dated May 11, 2009, "Crystal River Unit 3 - Response to Request for dated Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating May 11, 2009 Plant License Renewal Application (TAC NO. ME0274)," provided specific intended functions for the systems addressed in License Renewal Application (LRA)

Response to Subsections 2.3.3 and 2.3.4. Insert the specific intended functions from the RAI NRC RAI 2.3-1 response into the corresponding System Descriptions in Subsections 2.3.3 and 2.3.4.

Insert the specific intended functions as a separate paragraph or paragraphs just prior to the paragraph that provides the numbered list of general intended functions stating why the system is in the scope of License Renewal.

Identified by NRC In Section 2.3.4.13, on Page 2.3-159, under Components Subject to Aging Staff during Management Review, change the system identified in the first sentence from Scoping and Condensate Chemical Treatment System to Heater Drains System.

Screening Audit Progress Energy-In Subsection 3.3.2.1.25 on page 3.3-31, add new material for the Circulating Water Identified Change System: Fiber Glass or Fiber Reinforced Plastic.

For Circulating Water System piping, piping components, piping elements, and tanks on Table 3.3.2-25, on page 3.3-213, after Copper and Copper Alloys, add a new material - Fiber Glass or Fiber Reinforced Plastic - with the following AMR lines:

Raw Water Hardening and Loss Inspection of Internal J

(Inside) of Strength due to Surfaces in Miscel-Elastomer/ Plastic laneous Piping and degradation Ducting Components Air - Indoor Hardening and Loss External Surfaces J

Uncontrolled of Strength due to Monitoring (Outside)

Elastomer/ Plastic degradation Progress Energy-For the Appendix R Control Complex Chiller Cooler Components in Table 3.3.2-23 on Identified Change page 3.3-200, change the NUREG-1801 Volume 2 Item from VII.F1-17 to VII.C2-6 for Loss of Material due to Selective Leaching of Copper and Copper Alloy components.

The other information in the affected row remains unchanged.

Progress Energy-For the Nuclear Service and Decay Heat Sea Water System in Table 3.3.2-49, on Identified Change page 3.3-345, change the environment for Piping, piping components, and piping elements made from Fiber Glass or Fiber Reinforced Plastic from Open Cycle Cooling Water (Inside) to Raw Water (Inside). The other information in the affected row remains unchanged.

U. S. Nuclear Regulatory Commission 3F0709-03 Attachment Page 2 of 2 Source of Change License Renewal Application Amendment I Changes Progress Energy-In Subsection 3.4.2.1.10 on page 3.4-14, add a new aging management program for Identified Change the Gland Seal Water System: Flow-Accelerated Corrosion Program.

For the Gland Seal Water System Carbon or Low Alloy Steel Piping, piping components, and piping elements, in Table 3.4.2-10, on page 3.4-96, add a new aging effect for treated water (Inside) - Loss of Material due to Flow-Accelerated Corrosion - with the following AMR line:

Treated Loss of Material due Flow-VIII.E-35 3.4.1-29 C

Water to Flow-Accelerated Accelerated (S-16)

(Inside)

Corrosion Corrosion Progress Energy-For Main Feedwater System Carbon or Low Alloy Steel Feedwater Heaters on Table Identified Change 3.4.2-8, on page 3.4-77, add the following AMR lines for Steam (Inside) prior to Treated Water (Inside):

Steam Cumulative Fatigue TLAA VIII.B1-10 3.4.1-01 C

(Inside)

Damage due to (S-08)

Fatigue Loss of Material due to Water Chemistry VIII.A-16 3.4.1-02 C

Crevice Corrosion and One-Time (S-06)

Loss of Material due to Inspection General Corrosion Loss of Material due to Pitting Corrosion Progress Energy-In Table 3.5.2-10, on page 3.5-108, revise the information for Supports for Non-ASME Identified Change Piping & Components in the Diesel Generator Building to make the environment in the second row Air - Outdoor. The environment for the first row remains Air - Indoor.

Progress Energy-In Table 3.5.2-19, on page 3.5-150, revise the information for Supports for Non-ASME Identified Change Piping & Components made from stainless steel in the Turbine Building to change the Table 1 Item from 3.5.1-39 to 3.5.1-59.

Progress Energy-In Table 4.2-5, on page 4.2-16, change the wt% of nickel from.054 to 0.54 for the Identified Change Upper Shell Plate Material C4344-2.