ML22334A07015 December 2022Issuance of Amendment Nos. 220, 220, and 220, to Revise Technical Specifications to Adopt TSTF-487, Relocate DNB Parameters to the COLRSafe Shutdown
Shutdown Margin
Anticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
Surveillance Frequency Control Program
Fire Protection Program
ML22348A16714 December 2022March 2023 Emergency Preparedness Exercise Inspection - Request for Information
ML22343A1159 December 2022Transmittal of Technical Specification Bases Revision 75
ML22341A6137 December 2022Application to Revise Technical Specifications to Adopt TSTF-107- a, Separate Control Rods That Are Untrippable Versus InoperableShutdown Margin
ML22339A2375 December 2022NRR E-mail Capture - Palo Verde Unit 1 Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing
ML22314A27415 November 2022October 27, 2022 Meeting with Arizona Public Service Company to Discuss Proposed LAR to Adopt TSTF-107, Revision 4, Separate Control Rods That Are Untrippable Versus Inoperable, for Palo Verde, Units 1, 2, & 3
ML22312A5958 November 2022Independent Spent Fuel Storage Installation, Submittal of Annual Financial Reports 2021Pandemic
COVID-19
ML22308A1664 November 202223rd Refueling Outage Steam Generator Tube Inspection Report
ML22305A53628 October 2022Core Operating Limits Report, Revision 30Shutdown Margin
Coatings
ML22299A18126 October 2022Presubmittal Meeting Presentation - License Amendment Request - Adoption of TSTF-107-A Separate Control Rods That Are Untrippable Versus Inoperable and Change to TS 3.1.5 Condition B (EPID: L?2021?LRM-0081)
IR 05000528/202200324 October 2022Units, 1, 2 and 3 Integrated Inspection Report 05000528/2022003, 05000529/2022003, and 05000530/2022003Commercial Grade Dedication
Internal Flooding
Enforcement Discretion
Emergency Lighting
Functionality Assessment
FLEX
Missed surveillance
Significance Determination Process
Operability Determination
Severe Accident Management Guideline
Fire Protection Program
IR 05000528/202240314 October 2022Security Baseline Inspection Report 05000528/2022403 and 05000529/2022403 and 05000530/2022403Internal Flooding
Safeguards Contingency Plan
PMNS20221074, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 313 October 2022Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3
ML22273A18830 September 2022Topical Report CENPD-289-P/NP Supplement 1, Use of Inert Replacement Rods in CE 16x16 Next Generation Fuel
ML22266A11829 September 2022Project Manager Assignment
ML22272A32529 September 2022Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information
ML22257A25614 September 2022Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX170 and AMZDFX174 and Vertical Concrete Cask Identification Numbers AMZDNE170 and AMZDNE174
ML22252A03512 September 2022PVNGS Units 1, 2, and 3 - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000528/2022401; 05000529/2022401; 05000530/2022401Cyber Security
ML22251A3988 September 2022Technical Specification Bases Revision 74 and Technical Requirements Manual Revision 70
ML22250A7097 September 2022Generation Station, Emergency Plan, Revision 74Safe Shutdown
Time of Discovery
Health Physics Network
High winds
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
FLEX
Safeguards Contingency Plan
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Minimum staff
Fire Protection Program
Grace period
Power change
Unidentified leakage
Siren
Overexposure
Potassium iodide
Control Room Habitability
ML22243A26630 August 2022Submittal of 30-Day Report Per 10CFR26.719(c)(1) Unanticipated Result for FFD Performance Test SampleFitness for Duty
Blind Performance Test
IR 05000528/202200523 August 2022Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2022005 and 05000529/2022005 and 05000530/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
ML22235A66623 August 2022Notification of NRC Design Bases Assurance Inspection (Team) (05000528/2022010, 05000529/2022010, and 05000530/2022010) and Request for InformationCommercial Grade Dedication
Probabilistic Risk Assessment
Temporary Modification
Job Performance Measure
Surveillance Frequency Control Program
Large early release frequency
ML22230D08018 August 2022Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Container
ML22178A00411 August 2022Issuance of Amendment Nos. 219, 219, and 219, to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump Ts to Address GSI-191 IssuesSafe Shutdown
Ultimate heat sink
Surveillance Frequency Control Program
Fire Protection Program
Operational leakage
ML22222A11610 August 2022IR 2020404 MC&A Inspection (Public) - Cover LetterAffidavit
IR 05000528/20224028 August 2022Cover Letter Only - Palo Verde Nuclear Generating Station, Units 1, 2, and 3 NRC Security Inspection Report 05000528 2022402, 05000529 2022402, 05000530 2022402, and 07200044 2022402Affidavit
IR 05000520/20220025 August 2022Integrated Inspection Report 05000528/2022002 and 05000529/2022002 and 05000520/2022002Boric Acid
Packing leak
High Radiation Area
Mission time
Grab sample
Offsite Dose Calculation Manual
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Foreign Material Exclusion
Operability Determination
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
Reverse polarity
ML22209A17528 July 2022Inservice Inspection Request for InformationBoric Acid
Nondestructive Examination
Scaffolding
ML22196A37815 July 2022Notification of NRC Initial Operator Licensing Examination 05000528/2023301; 05000529/2023301; 05000530/2023301
ML22189A1438 July 2022Fourth 10-Year Interval, First Period Owner'S Activity Report Number 1R23
ML22187A2636 July 2022Notification of Inspection (NRC IR 05000528/2022004, 05000529/2022004 and 05000530/2022004) and Request for Information
IR 05000528/202230121 June 2022NRC Examination Report 05000528/2022301, 05000529/2022301, and 05000530/2022301Job Performance Measure
ML22173A08721 June 2022Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 73Safe Shutdown
Time of Discovery
Health Physics Network
High winds
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
FLEX
Safeguards Contingency Plan
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Minimum staff
Fire Protection Program
Grace period
Power change
Unidentified leakage
Siren
Overexposure
Potassium iodide
ML22173A06817 June 2022Email Concurrence on SE Input for Columbia Pltr LARLicense Renewal
ML22173A06717 June 2022SE PVNGS Adoption of TSTF-567 SESurveillance Frequency Control Program
Operational leakage
ML22167A18716 June 2022NRR E-mail Capture - Palo Verde 1, 2, and 3 - Revised Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues
ML22147A0936 June 20222021 Annual Assessment Public Meeting SummaryPandemic
Coronavirus
COVID-19
ML22154A2263 June 2022Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74 Management Change
ML22157A0302 June 2022Annual Report of Guarantee of Payment of Deferred Premium
ML22146A1871 June 2022FRN for Issuance of ExemptionExemption Request
ML22143A98919 May 2022PV-2022-05-Post Exam CommentsSurveillance Frequency Control Program
ML22136A09216 May 2022NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-487-A, Revision 1, Relocate DNB Parameters to the COLR
ML22111A28413 May 2022Independence Spent Fuel Storage Installation - Issuance of ExemptionExemption Request
ML22124A24112 May 2022Relief Request 67 for an Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice InspectionIncorporated by reference
COVID-19
ML22101A25711 May 2022Order Extending the Effectiveness of the Approval of the Indirect Transfer of the Co-Owner Licenses from Public Service Company of New Mexico to Avangrid, Inc. (EPID L-2022-LLO-0000) (FRN)
ML22101A25610 May 2022Order Extending the Effectiveness of the Approval of the Indirect Transfer of the Co-Owner Licenses from Public Service Company of New Mexico to Avangrid, Inc. (EPID L-2022-LLO-0000) (Order)
ML22101A25510 May 2022Order Extending the Effectiveness of the Approval of the Indirect Transfer of the Co-Owner Licenses from Public Service Company of New Mexico to Avangrid, Inc. (EPID L-2022-LLO-0000) (Letter)
IR 05000528/20220019 May 2022Integrated Inspection Report 05000528/2022001, 05000529/2022001 and 05000530/2022001Enforcement Discretion
Arc flash
Functionality Assessment
Feedwater Heater
Operability Determination
Fire Protection Program
Power change
Downpower
Siren
ML22126A1266 May 2022Unit 1 Core Operating Limits Report Revision 31Shutdown Margin