Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22355A50623 December 2022404 Cyber Notification and RFI LetterCyber Security
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab5 December 2022Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab
ML22096A00318 November 2022McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud ExaminationsAging Management
Stress corrosion cracking
License Renewal
Subsequent License Renewal
ML22256A25314 November 2022Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2Ultimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Recently irradiated fuel
Fire Protection Program
IR 05000400/202200310 November 2022Integrated Inspection Report 05000400/2022003Hot Short
Safe Shutdown
Time of Discovery
Ultimate heat sink
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Fire Protection Program
ML22314A07510 November 20222B - Exam Administrative Items - Normal ReleaseJob Performance Measure
IR 05000400/20223012 November 2022NRC Operator License Examination Report 05000400/2022301
RA-22-0314, Notification of Source Water Resiliency and Response Plan Submission2 November 2022Notification of Source Water Resiliency and Response Plan Submission
RA-22-0297, Cycle 25 Core Operating Limits Report, Revisions 0 and 117 October 2022Cycle 25 Core Operating Limits Report, Revisions 0 and 1Boric Acid
Shutdown Margin
ML22305A54813 October 2022News Release-II-22-026: NRC Names New Senior Resident Inspector at Harris Nuclear Power PlantNew Senior Resident Inspector
ML22271A62029 September 2022Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010Commercial Grade Dedication
Probabilistic Risk Assessment
Functionality Assessment
Operability Determination
ML22251A23514 September 2022Presentation Slides for September 14, 2022, Observation Public Meeting
ML22258A12614 September 2022NRC Operator Licensing Examination Approval 05000400/2022301
ML22242A00212 September 2022Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing DefinitionShutdown Margin
Packing leak
Anticipated operational occurrence
Process Control Program
Pressure Boundary Leakage
Fire Protection Program
Unidentified leakage
ML22227A0682 September 2022Alternative to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Code for Operation and Maintenance for Certain Target Rock Solenoid ValvesStroke time
Incorporated by reference
Local Leak Rate Testing
ML22237A16325 August 2022004 Radiation Safety Baseline Inspection Information RequestSurveillance Frequency Control Program
Coronavirus
IR 05000400/202200524 August 2022Updated Inspection Plan for Shearon Harris Nuclear Power Plant (Report 05000400/2022005)Commercial Grade Dedication
Operator Manual Action
Cyber Security
Open Phase Condition
License Renewal
Exemption Request
COVID-19
IR 05000400/202240323 August 2022Security Baseline Inspection Report 05000400/2022403Contraband
Enforcement Discretion
ML22126A0089 August 2022Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7Anticipated operational occurrence
Loss of condenser vacuum
IR 05000400/20220025 August 2022Integrated Inspection Report 05000400/2022002Safe Shutdown
Mission time
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
Through-Wall Leakage
Continuous fire watch
Fire Protection Program
Fire Watch
Loss of condenser vacuum
ML22161B03328 July 2022Issuance of Amendment No. 193 Regarding Revision of Surveillance Requirements to Remove Shutdown LimitationSurveillance Frequency Control Program
Overspeed trip
IR 05000400/202201120 July 2022Biennial Problem Identification and Resolution Inspection Report 05000400 2022011Boric Acid
Aging Management
Operability Determination
License Renewal
Maintenance Rule Program
RA-22-0214, 10 CFR 50.54(Q) Review Form for Revisions to the Shearon Harris Nuclear Power Plant, Unit 1, Emergency Action Level (EAL) Technical Basis Document and the EAL Wallchart Document12 July 202210 CFR 50.54(Q) Review Form for Revisions to the Shearon Harris Nuclear Power Plant, Unit 1, Emergency Action Level (EAL) Technical Basis Document and the EAL Wallchart DocumentBoric Acid
Exemption Request
Grace period
RA-22-0197, Reactor and Senior Reactor Operator Initial Examinations 05000400/20223016 July 2022Reactor and Senior Reactor Operator Initial Examinations 05000400/2022301
ML22167A18530 June 2022Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191Coatings
IR 05000400/202240230 June 2022Material Control and Accounting Program Inspection Report 05000400/2022402 (OUO Removed)Affidavit
RA-22-0213, Notification of Modification to Permit Application for Industrial Stormwater Activities30 June 2022Notification of Modification to Permit Application for Industrial Stormwater ActivitiesGrab sample
Exemption Request
IR 05000400/202201013 June 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000400/2022010Significance Determination Process
Power-Operated Valves
Weak link
RA-22-0172, Duke Energy Progress, LLC - Supplement to Relief Request HNP-IST-004-RR1 for Inservice Testing Program Plan - Fourth Ten-Year Interval10 June 2022Duke Energy Progress, LLC - Supplement to Relief Request HNP-IST-004-RR1 for Inservice Testing Program Plan - Fourth Ten-Year IntervalStroke time
ML22153A3846 June 2022Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 CloseoutCoatings
PMNS20220537, Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-1912 June 2022Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-191
ML22138A40126 May 2022Project Manager Reassignment
RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes24 May 2022Duke Energy Common Emergency Plan, Revision 2, Summary of ChangesExemption Request
Minimum staff
Grace period
Siren
RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory16 May 202210 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified LaboratoryBlind Performance Test
RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility13 May 2022Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations FacilityHealth Physics Network
High winds
ML22129A00610 May 2022Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00Surveillance Frequency Control Program
Operational leakage
ML22130A0309 May 2022Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350
ML22101A2826 May 2022Regulatory Audit Summary Related to the Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme
IR 05000400/20220014 May 2022Integrated Inspection Report 05000400/2022001Commercial Grade Dedication
Internal Flooding
Functionality Assessment
Aging Management
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power change
Downpower
RA-22-0136, Annual Environmental (Nonradiological) Operating Report29 April 2022Annual Environmental (Nonradiological) Operating ReportZebra Mussel
Biofouling
RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.4627 April 2022Annual Report of Changes Pursuant to 10 CFR 50.46
RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 202127 April 2022Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021Annual Radioactive Effluent Release Report
ML22115A14125 April 2022NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition InformationHealth Physics Network
High winds
ML22109A21220 April 2022Duke Energy Pre-Submittal Public April 20, 2022, Meeting PresentationIncorporated by reference
Surveillance Frequency Control Program
Operational leakage
Press Release-II-22-012, NRC to Hold Virtual Meeting to Discuss Brunswick and Shearon Harris Nuclear Power Plant Performance20 April 2022Press Release-II-22-012: NRC to Hold Virtual Meeting to Discuss Brunswick and Shearon Harris Nuclear Power Plant Performance
ML22112A01920 April 2022News Release-II-22-012: NRC to Hold Virtual Meeting to Discuss Brunswick and Shearon Harris Nuclear Power Plant Performance
PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve19 April 2022Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve
ML22108A01815 April 2022NRR E-mail Capture - Accepted for Review - Duke Energy Relief Request for Harris Nuclear Plant Inservice Testing Program Plan - Fourth Ten-Year Interval to Extend Type C Test to 75 Months
RA-22-0117, Relief Request for Inservice Testing Program Plan - Fourth Ten-Year Interval7 April 2022Relief Request for Inservice Testing Program Plan - Fourth Ten-Year IntervalStroke time
Incorporated by reference
Local Leak Rate Testing
PMNS20220350, Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting4 April 2022Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting