Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-18-038, Annual Property Insurance Status Report | 30 March 2018 | Annual Property Insurance Status Report | |
SVP-18-020, Core Operating Limits Report for Quad Cities Unit 2 Cycle 25 | 27 March 2018 | Core Operating Limits Report for Quad Cities Unit 2 Cycle 25 | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence MELLLA |
ML18086B221 | 27 March 2018 | Withdrawal of Submittal of Relief Request for an Alternative to the ASME Code - Revise Main Steam Isolation Valve Partial Stroke Testing Frequency | Surveillance Frequency Control Program Cold shutdown justification |
SVP-18-022, Unit 2 - Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory ... | 23 March 2018 | Unit 2 - Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory ... | Safe Shutdown Unanalyzed Condition High winds Ultimate heat sink Tornado Missile Enforcement Discretion FLEX Tornado Generated Missile Tornado Missile Protection Spent Fuel Pool Instrumentation Tornado Missile Risk Evaluator |
ML18082B039 | 23 March 2018 | NRR E-mail Capture - Acceptance for Review of Application Concerning Revisions to the Technical Specifications for Reactor Pressure Vessel Water Inventory Control | Water Inventory Control |
ML18068A147 | 9 March 2018 | NRC Response to Union of Concerned Scientists Comments Regarding Quad Cities Nuclear Power Station, Unit 2, High Pressure Coolant Injection Licensee Event Report 05000265/2017-001-00 | Mission time Probabilistic Risk Assessment Significance Determination Process |
ML18067A148 | 8 March 2018 | Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) | Decommissioning Funding Plan Authorized possession limits |
ML18067A149 | 8 March 2018 | Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation | Decommissioning Funding Plan |
ML18067A237 | 8 March 2018 | NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Revise Emergency Plan for Midwest Stations | |
ML18065A836 | 7 March 2018 | Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report | |
ML18065A204 | 6 March 2018 | Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. | Safe Shutdown Fitness for Duty Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Nuclear Accident Reporting System Severe Accident Management Guideline Earthquake Deep Dose Equivalent Fuel cladding Minimum staff Fire Protection Program Grace period Power change Siren |
ML18067A207 | 2 March 2018 | E-Mail Dated March 2, 2018 for Document Request Response for Quad Cities Nuclear Power Station ISI Inspection (DRS-M.Domke) | |
IR 05000254/2017006 | 2 March 2018 | Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2017006; 05000265/2017006) | |
RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) | 1 March 2018 | Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) | Coatings Fire Protection Program |
ML18058A523 | 1 March 2018 | Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements | Surveillance Frequency Control Program Cold shutdown justification |
RS-18-025, Submittal of Fitness for Duty Performance Data Reports for the Year 2017 | 28 February 2018 | Submittal of Fitness for Duty Performance Data Reports for the Year 2017 | Fitness for Duty |
RS-18-011, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events ... | 28 February 2018 | Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events ... | Emergency Lighting FLEX Spent Fuel Pool Instrumentation Hardened vent |
ML18058A796 | 27 February 2018 | Annual Fatigue Report Form for 2017 | |
ML18054B359 | 27 February 2018 | Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli | |
NMP1L3206, Exelon Generation Co., Submittal of Emergency Plan Revision | 27 February 2018 | Exelon Generation Co., Submittal of Emergency Plan Revision | |
NMP1L3206, Co., Submittal of Emergency Plan Revision | 27 February 2018 | Co., Submittal of Emergency Plan Revision | |
RS-18-006, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 26 February 2018 | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Water Inventory Control Post Accident Monitoring Hydrostatic Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Scram Discharge Volume Power Operated Valves Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Scaffolding |
ML18053A941 | 22 February 2018 | Single Positive Test Form Collected on 11/28/2017 | |
ML18053A940 | 22 February 2018 | Annual Report Form for Drug and Alcohol Tests for 2017 | |
ML18053A759 | 22 February 2018 | Submittal of Exelon Cyber Security Plan Revisions | Cyber Security |
IR 05000254/2017004 | 16 February 2018 | Errata - Quad Cities Nuclear Power Station, Units 1 and 2 - NRC Integrated Inspection Report 05000254/2017004; 05000265/2017004; 07200053/2017001 and Emergency Preparedness Annual Inspection Report 05000254/2017501; 05000265/2017501 | Safe Shutdown Temporary Modification Significance Determination Process Job Performance Measure Surveillance Frequency Control Program Operability Determination Earthquake Fire Protection Program Power change |
ML18043A882 | 12 February 2018 | Annual Report Form for Drug and Alcohol Tests for 2017 | |
RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-10 | 8 February 2018 | Summary of Changes to Quality Assurance Topical Report, NO-AA-10 | Safe Shutdown Fitness for Duty Shutdown Margin Non-Destructive Examination Offsite Dose Calculation Manual Commercial Grade Dedication Safe Shutdown Earthquake Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination License Renewal Maintenance Rule Program Fire Protection Program |
ML18053A177 | 31 January 2018 | Attachment 6A - Quad Cities - Marked-up Emergency Plan EP-AA-1000 Pages | Safe Shutdown Fitness for Duty Health Physics Network Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff |
ML18053A185 | 31 January 2018 | Enclosure 6 - Quad Cities - Evaluation of Proposed Changes | Safe Shutdown Fitness for Duty Cyber Security Design basis earthquake Severe Accident Management Guideline Fuel cladding Minimum staff |
RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | 31 January 2018 | License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | Minimum staff |
RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | 31 January 2018 | Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | Minimum staff |
ML18053A178 | 31 January 2018 | Attachment 6B - Quad Cities Clean Emergency Plan EP-AA-1000 Pages | Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff |
ML18053A190 | 31 January 2018 | Enclosure 9 - Information Related to Review of Proposed Changes by the State | |
ML18029A375 | 29 January 2018 | Single Positive Test Form Collected on 04/02/2017 | |
ML18025B443 | 26 January 2018 | Withdrawal of License Amendment Request to Revise Technical Specification Requirements for Secondary Containment | |
ML18025B418 | 25 January 2018 | NRC Integrated Inspection Report and Emergency Preparedness Annual Inspection Report 05000254/2017004; 05000265/2017004; 05000254/2017501 and 05000265/2017501 | Safe Shutdown Enforcement Discretion Fire impairment Temporary Modification Nuclear Accident Reporting System Significance Determination Process Job Performance Measure Surveillance Frequency Control Program Earthquake Scaffolding Power change |
RS-18-018, Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | 24 January 2018 | Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | |
ML18022A616 | 24 January 2018 | Approval of Alternatives to the ASME Code Regarding Reactor Vessel Penetration N-11B - Relief Request 15R-11, Revision 3 (CAC No. MF9286; EPID L-2017-LLR-0004) (RS-17-014) | Nondestructive Examination Incorporated by reference |
IR 05000254/2017007 | 12 January 2018 | NRC Design Bases Assurance Inspection (Teams): Inspection Report 05000254/2017007; 05000265/2017007 (DRS-M.Jones) | Probabilistic Risk Assessment Job Performance Measure Large early release frequency Time Critical Operator Action Power Uprate |
ML18012A570 | 11 January 2018 | Initial License Exam, April 2016; Delayed Release Date (DRS-C.Zoia) | |
ML17353A949 | 9 January 2018 | Supplemental Information Needed for Acceptance of License Amendment Request to Revise Technical Specification Requirements for Secondary Containment | |
ML18009A888 | 9 January 2018 | Single Positive Test Form Collected on 12/08/2017 | |
ML18009A886 | 9 January 2018 | Single Positive Test Form Collected on 12/08/2017 | |
05000254/LER-2017-004 | 5 January 2018 | Unit 1 HPCI Did Not Trip Due to Wear Debris in the Turbine Stop Valve Oil Resetting Solenoid LER 17-004-00 For Quad Cities Nuclear Power Station, Unit 1 re: Unit 1 HPCI Did Not Trip Due to Wear Debris in the Turbine Stop Valve Oil Resetting Solenoid | |
RS-18-004, Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-11 | 4 January 2018 | Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-11 | Nondestructive Examination Dissimilar Metal Weld |