Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-18-038, Annual Property Insurance Status Report30 March 2018Annual Property Insurance Status Report
SVP-18-020, Core Operating Limits Report for Quad Cities Unit 2 Cycle 2527 March 2018Core Operating Limits Report for Quad Cities Unit 2 Cycle 25Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
MELLLA
ML18086B22127 March 2018Withdrawal of Submittal of Relief Request for an Alternative to the ASME Code - Revise Main Steam Isolation Valve Partial Stroke Testing FrequencySurveillance Frequency Control Program
Cold shutdown justification
SVP-18-022, Unit 2 - Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory ...23 March 2018Unit 2 - Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory ...Safe Shutdown
Unanalyzed Condition
High winds
Ultimate heat sink
Tornado Missile
Enforcement Discretion
FLEX
Tornado Generated Missile
Tornado Missile Protection
Spent Fuel Pool Instrumentation
Tornado Missile Risk Evaluator
ML18082B03923 March 2018NRR E-mail Capture - Acceptance for Review of Application Concerning Revisions to the Technical Specifications for Reactor Pressure Vessel Water Inventory ControlWater Inventory Control
ML18068A1479 March 2018NRC Response to Union of Concerned Scientists Comments Regarding Quad Cities Nuclear Power Station, Unit 2, High Pressure Coolant Injection Licensee Event Report 05000265/2017-001-00Mission time
Probabilistic Risk Assessment
Significance Determination Process
ML18067A1488 March 2018Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation)Decommissioning Funding Plan
Authorized possession limits
ML18067A1498 March 2018Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage InstallationDecommissioning Funding Plan
ML18067A2378 March 2018NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Revise Emergency Plan for Midwest Stations
ML18065A8367 March 2018Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report
ML18065A2046 March 2018Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan.Safe Shutdown
Fitness for Duty
Health Physics Network
High Radiation Area
Offsite Dose Calculation Manual
Met Tower
Nuclear Accident Reporting System
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Fuel cladding
Minimum staff
Fire Protection Program
Grace period
Power change
Siren
ML18067A2072 March 2018E-Mail Dated March 2, 2018 for Document Request Response for Quad Cities Nuclear Power Station ISI Inspection (DRS-M.Domke)
IR 05000254/20170062 March 2018Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2017006; 05000265/2017006)
RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)1 March 2018Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)Coatings
Fire Protection Program
ML18058A5231 March 2018Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing RequirementsSurveillance Frequency Control Program
Cold shutdown justification
RS-18-025, Submittal of Fitness for Duty Performance Data Reports for the Year 201728 February 2018Submittal of Fitness for Duty Performance Data Reports for the Year 2017Fitness for Duty
RS-18-011, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events ...28 February 2018Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events ...Emergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Hardened vent
ML18058A79627 February 2018Annual Fatigue Report Form for 2017
ML18054B35927 February 2018Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli
NMP1L3206, Exelon Generation Co., Submittal of Emergency Plan Revision27 February 2018Exelon Generation Co., Submittal of Emergency Plan Revision
NMP1L3206, Co., Submittal of Emergency Plan Revision27 February 2018Co., Submittal of Emergency Plan Revision
RS-18-006, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.26 February 2018Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Water Inventory Control
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Qualified Offsite Circuit
Surveillance Frequency Control Program
Scram Discharge Volume
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Scaffolding
ML18053A94122 February 2018Single Positive Test Form Collected on 11/28/2017
ML18053A94022 February 2018Annual Report Form for Drug and Alcohol Tests for 2017
ML18053A75922 February 2018Submittal of Exelon Cyber Security Plan RevisionsCyber Security
IR 05000254/201700416 February 2018Errata - Quad Cities Nuclear Power Station, Units 1 and 2 - NRC Integrated Inspection Report 05000254/2017004; 05000265/2017004; 07200053/2017001 and Emergency Preparedness Annual Inspection Report 05000254/2017501; 05000265/2017501Safe Shutdown
Temporary Modification
Significance Determination Process
Job Performance Measure
Surveillance Frequency Control Program
Operability Determination
Earthquake
Fire Protection Program
Power change
ML18043A88212 February 2018Annual Report Form for Drug and Alcohol Tests for 2017
RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-108 February 2018Summary of Changes to Quality Assurance Topical Report, NO-AA-10Safe Shutdown
Fitness for Duty
Shutdown Margin
Non-Destructive Examination
Offsite Dose Calculation Manual
Commercial Grade Dedication
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
License Renewal
Maintenance Rule Program
Fire Protection Program
ML18053A17731 January 2018Attachment 6A - Quad Cities - Marked-up Emergency Plan EP-AA-1000 PagesSafe Shutdown
Fitness for Duty
Health Physics Network
Nuclear Accident Reporting System
Severe Accident Management Guideline
Minimum staff
ML18053A18531 January 2018Enclosure 6 - Quad Cities - Evaluation of Proposed ChangesSafe Shutdown
Fitness for Duty
Cyber Security
Design basis earthquake
Severe Accident Management Guideline
Fuel cladding
Minimum staff
RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements31 January 2018License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing RequirementsMinimum staff
RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements31 January 2018Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing RequirementsMinimum staff
ML18053A17831 January 2018Attachment 6B - Quad Cities Clean Emergency Plan EP-AA-1000 PagesNuclear Accident Reporting System
Severe Accident Management Guideline
Minimum staff
ML18053A19031 January 2018Enclosure 9 - Information Related to Review of Proposed Changes by the State
ML18029A37529 January 2018Single Positive Test Form Collected on 04/02/2017
ML18025B44326 January 2018Withdrawal of License Amendment Request to Revise Technical Specification Requirements for Secondary Containment
ML18025B41825 January 2018NRC Integrated Inspection Report and Emergency Preparedness Annual Inspection Report 05000254/2017004; 05000265/2017004; 05000254/2017501 and 05000265/2017501Safe Shutdown
Enforcement Discretion
Fire impairment
Temporary Modification
Nuclear Accident Reporting System
Significance Determination Process
Job Performance Measure
Surveillance Frequency Control Program
Earthquake
Scaffolding
Power change
RS-18-018, Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements24 January 2018Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements
ML18022A61624 January 2018Approval of Alternatives to the ASME Code Regarding Reactor Vessel Penetration N-11B - Relief Request 15R-11, Revision 3 (CAC No. MF9286; EPID L-2017-LLR-0004) (RS-17-014)Nondestructive Examination
Incorporated by reference
IR 05000254/201700712 January 2018NRC Design Bases Assurance Inspection (Teams): Inspection Report 05000254/2017007; 05000265/2017007 (DRS-M.Jones)Probabilistic Risk Assessment
Job Performance Measure
Large early release frequency
Time Critical Operator Action
Power Uprate
ML18012A57011 January 2018Initial License Exam, April 2016; Delayed Release Date (DRS-C.Zoia)
ML17353A9499 January 2018Supplemental Information Needed for Acceptance of License Amendment Request to Revise Technical Specification Requirements for Secondary Containment
ML18009A8889 January 2018Single Positive Test Form Collected on 12/08/2017
ML18009A8869 January 2018Single Positive Test Form Collected on 12/08/2017
05000254/LER-2017-0045 January 2018Unit 1 HPCI Did Not Trip Due to Wear Debris in the Turbine Stop Valve Oil Resetting Solenoid
LER 17-004-00 For Quad Cities Nuclear Power Station, Unit 1 re: Unit 1 HPCI Did Not Trip Due to Wear Debris in the Turbine Stop Valve Oil Resetting Solenoid
RS-18-004, Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-114 January 2018Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-11Nondestructive Examination
Dissimilar Metal Weld