Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ULNRC-06424, Callaway, FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 00829 March 2018Callaway, FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 008
ULNRC-06424, Callaway, EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes29 March 2018Callaway, EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes
ULNRC-06424, Callaway, Unit 1, Submittal of Revised Emergency Action Level Matrix and Emergency Action Level Technical Basis Document29 March 2018Callaway, Unit 1, Submittal of Revised Emergency Action Level Matrix and Emergency Action Level Technical Basis Document
ML18088B36129 March 2018EIP-ZZ-00101 Addendum 2, Emergency Action Level Technical Basis Document, Revision 008Safe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
NFPA 805
Emergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
ML18088B36029 March 2018FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 008
ML18088B35929 March 2018EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes
ULNRC-06424, Submittal of Revised Emergency Action Level Matrix and Emergency Action Level Technical Basis Document29 March 2018Submittal of Revised Emergency Action Level Matrix and Emergency Action Level Technical Basis Document
ULNRC-06428, 10 CFR 50.46 Annual Report ECCS Evaluation Model Revisions29 March 201810 CFR 50.46 Annual Report ECCS Evaluation Model Revisions
ULNRC-06429, Nuclear Property Insurance Reporting27 March 2018Nuclear Property Insurance Reporting
ULNRC-06380, Proposed Supplement to NRC-Approved 10 CFR 50.55a Request (Relief Request 14R-01) Regarding Proposed Alternative to ASME Section XI Requirements for Class 3 Buried Piping27 March 2018Proposed Supplement to NRC-Approved 10 CFR 50.55a Request (Relief Request 14R-01) Regarding Proposed Alternative to ASME Section XI Requirements for Class 3 Buried PipingHydrostatic
VT-2
ULNRC-06414, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado ...23 March 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado ...Safe Shutdown
High winds
Loop seal
Ultimate heat sink
Tornado Missile
Enforcement Discretion
FLEX
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Tornado Missile Risk Evaluator
ML18078A78819 March 2018Owner'S Activity Reports (OAR-1 Forms) for Cycle/Refuel 22
ML18068A6919 March 2018Attachment 5 - Proposed TS Bases Changes (for Information Only)Surveillance Frequency Control Program
ML18068A6929 March 2018Attachment 6 - List of Regulatory Commitments
ULNRC-06401, Attachment 4 - Revised Technical Specification Pages9 March 2018Attachment 4 - Revised Technical Specification PagesUltimate heat sink
Surveillance Frequency Control Program
ML18068A6899 March 2018Attachment 3 - Proposed Technical Specification Changes (Mark-Up)
ML18068A6889 March 2018Attachment 2 - Evaluation of the Proposed Change
ML18068A6869 March 2018License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System (Ldcn 16-0013)
ULNRC-06417, Path Forward for Resolution of GSI-1916 March 2018Path Forward for Resolution of GSI-191Exemption Request
IR 05000483/20170061 March 2018Annual Assessment Letter for Callaway Plant (Report 05000483/2017006)Enforcement Discretion
Cyber Security
Functionality Assessment
Open Phase Condition
Operability Determination
ULNRC-06423, Follow-Up Clarification for Letter Dated December 19, 201727 February 2018Follow-Up Clarification for Letter Dated December 19, 2017Cyber Security
ML18044A86113 February 2018Annual Report Form for Drug and Alcohol Tests for 2017
ULNRC-06411, Fitness for Duty Annual Report for Drug and Alcohol12 February 2018Fitness for Duty Annual Report for Drug and AlcoholFitness for Duty
ML18036A6745 February 2018Enclosure 5: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 20)Ultimate heat sink
Anchor Darling
ML18036A6765 February 2018Enclosure 6: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 21)Stroke time
ML18036A6735 February 2018Enclosure 4: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 19)Packing leak
Stroke time
ML18036A6725 February 2018Enclosure 3: Response to Request for Additional Information (RAI) 1.cStroke time
CAC:MF95855 February 2018
ULNRC-06410, Callaway Plant, Unit 1 - Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (Ldcn 16-0001)5 February 2018Callaway Plant, Unit 1 - Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (Ldcn 16-0001)
ULNRC-06410, Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (LDCN 16-0001)5 February 2018Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (LDCN 16-0001)
ML18036A6695 February 2018Enclosure 1: Responses to Requests for Additional InformationStroke time
ML18036A6715 February 2018Enclosure 2: Response to Request for Additional Information (RAI) Item 1.a
ULNRC-06412, CFR 26, Subpart I - Managing Fatigue, for Period Ending December 31, 201730 January 2018CFR 26, Subpart I - Managing Fatigue, for Period Ending December 31, 2017Fitness for Duty
IR 05000483/201700428 January 2018NRC Integrated Inspection Report 05000483/2017004 and Exercise of Enforcement DiscretionSafe Shutdown
Boric Acid
Time of Discovery
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Mission time
Tornado Missile
Weld Overlay
Internal Flooding
Past operability
Enforcement Discretion
Nondestructive Examination
Functionality Assessment
Locked High Radiation Area
Condition Adverse to Quality
FLEX
Tornado-Generated Missile
Tornado Generated Missile
Significance Determination Process
Tornado Missile Protection
Stress corrosion cracking
Operability Determination
Maintenance Rule Program
Biofouling
Through-Wall Leak
Fire Protection Program
Dissimilar Metal Weld
Coast down
Operability Assessment
Water hammer
ULNRC-06413, Submittal of Core Operating Limits Report, Cycle 2326 January 2018Submittal of Core Operating Limits Report, Cycle 23Shutdown Margin
ML18025B46724 January 2018NRR E-mail Capture - Request for Extension of Due Date for RAI ResponseStroke time
ML18003B41923 January 2018Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1: SeismicSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML18023B00323 January 2018Single Positive Test Form Collected on 02/14/2017
ML18023B00423 January 2018Single Positive Test Form Collected on 09/11/2017
ML18023B00623 January 2018Single Positive Test Form Collected on 09/26/2017
ML18023B00723 January 2018Single Positive Test Form Collected on 09/27/2017
ML18023B00823 January 2018Single Positive Test Form Collected on 09/27/2017
ML18023B00923 January 2018Single Positive Test Form Collected on 10/02/2017
ML18023B01023 January 2018Single Positive Test Form Collected on 10/06/2017
ML18023B01123 January 2018Single Positive Test Form Collected on 12/04/2017
ML18023B01223 January 2018Single Positive Test Form Collected on 12/05/2017
ML18023B01323 January 2018Single Positive Test Form Collected on 12/18/2017
ML18023B01423 January 2018Single Positive Test Form Collected on 12/18/2017
IR 05000483/201750117 January 2018NRC Emergency Preparedness Annual Inspection Report 05000483/2017501
ULNRC-06408, Submittal of Single Positive Test Forms for January-December 201711 January 2018Submittal of Single Positive Test Forms for January-December 2017Fitness for Duty