Letter Sequence Other |
---|
CAC:MF8118, Clarify Application of Setpoint Methodology for LSSS Functions, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Open) CAC:MF8119, Clarify Application of Setpoint Methodology for LSSS Functions, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Open) |
|
MONTHYEARML16236A0972016-08-25025 August 2016 Operating Corporation - August 25, 2016, Core Design and Safety System Analysis Methodology Transition License Amendment Request Revised Project stage: Request ML16243A5132016-09-0101 September 2016 Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a Project stage: Meeting ML18068A6922018-03-0909 March 2018 Attachment 6 - List of Regulatory Commitments Project stage: Other ML18068A6912018-03-0909 March 2018 Attachment 5 - Proposed TS Bases Changes (for Information Only) Project stage: Other ULNRC-06401, Attachment 4 - Revised Technical Specification Pages2018-03-0909 March 2018 Attachment 4 - Revised Technical Specification Pages Project stage: Other ML18068A6892018-03-0909 March 2018 Attachment 3 - Proposed Technical Specification Changes (Mark-Up) Project stage: Other ML18068A6882018-03-0909 March 2018 Attachment 2 - Evaluation of the Proposed Change Project stage: Request ML18068A6862018-03-0909 March 2018 License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System (Ldcn 16-0013) Project stage: Request 2016-09-01
[Table View] |
|
---|
Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ML23088A1202023-03-29029 March 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Evaluation of the Proposed Change ML23088A1242023-03-29029 March 2023 Attachment 4: List of Commitments ULNRC-06751, Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control2023-03-29029 March 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control ULNRC-06781, License Amendment Request to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2022-12-0101 December 2022 License Amendment Request to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ULNRC-06780, Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-0072022-11-30030 November 2022 Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-007 ML22307A3142022-11-0303 November 2022 Attachment 2: Proposed Technical Specification 5.5.16 Changes (Markup) ML22307A3122022-11-0303 November 2022 Evaluation of the Proposed Change ML22307A3152022-11-0303 November 2022 Attachment 3: Proposed Technical Specification 5.5.16 Changes (Clean Pages) ML22307A3132022-11-0303 November 2022 Attacchment 1: 54032-CALC-01, Revision 1,Callaway Plant: Evaluation of Risk Significance of Permanent ILRT Extension ML22285A1192022-10-12012 October 2022 Attachment 2 to Enclosure 1: Revised Clean Technical Specifications ML22285A1242022-10-12012 October 2022 Attachment 7 to Enclosure 1: ANP-3943NP, Callaway Small Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 ML22285A1232022-10-12012 October 2022 Attachment 6 to Enclosure 1: ANP-3944NP, Callaway Realistic Large Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 ML22285A1222022-10-12012 October 2022 Attachment 5 to Enclosure 1: ANP-3947NP, Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel, Revision 3, Dated October 2022 ML22285A1182022-10-12012 October 2022 Attachment 1 to Enclosure 1: Marked-Up Existing Technical Specifications ML22285A1172022-10-12012 October 2022 Enclosure 1: Description and Assessment of the Proposed Change ML22285A1202022-10-12012 October 2022 Attachment 3 to Enclosure 1: Marked-Up Technical Specifications Bases (for Information Only) ML22285A1252022-10-12012 October 2022 Attachment 8 to Enclosure 1: ANP-3969NP, Callaway Non-LOCA Summary Report, Revision 2, Dated October 2022 ULNRC-06768, Attachment 4 to Enclosure 1: Framatome Affidavits for Withholding from Public Disclosure2022-10-0707 October 2022 Attachment 4 to Enclosure 1: Framatome Affidavits for Withholding from Public Disclosure ML22242A2932022-08-29029 August 2022 Attachment 5 to Enclosure 1 - Criticality Safety Evaluation Report ML22242A1242022-08-29029 August 2022 Enclosure 1: Description and Assessment of the Proposed Change ML22242A1262022-08-29029 August 2022 Attachment 2 to Enclosure 1 - Revised Clean Technical Specifications ML22242A1272022-08-29029 August 2022 Attachment 3 to Enclosure 1 - Marked-Up Technical Specification Bases ML22242A1252022-08-29029 August 2022 Attachment 1 to Enclosure 1 - Marked-Up Existing Technical Specifications ML22216A2412022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections (LDCN 21-0013) - Description and Assessment ML22181B1392022-06-30030 June 2022 Attachment 9 - Responses to NRC Audit Questions ULNRC-06723, Attachment 4 to Enclosure 1 - Holtec Affidavit for Withholding2022-06-30030 June 2022 Attachment 4 to Enclosure 1 - Holtec Affidavit for Withholding ML22181B1382022-06-30030 June 2022 Attachment 8 - Revised Operating License Changes ML22181B1372022-06-30030 June 2022 Attachment 7 - Proposed Operating License Changes (Mark-up) ML22181B1312022-06-30030 June 2022 Attachment 1 - Replacement for Attachment 1, Description and Assessment, of ULNRC-06688 ML22181B1352022-06-30030 June 2022 Attachment 5 - Replacement for Attachment 5, Cross-Reference of TSTF-505 and Callaway Technical Specifications, of ULNRC-06688 ML22153A1762022-06-0202 June 2022 Enclosure 1 - Description and Assessment of the Proposed Change ML22153A1752022-06-0202 June 2022 ULNRC-06729: Application for Technical Specification Change and Exemption Request Regarding Transition to Framatome Fuel, LDCN 22-0002 ML22153A1812022-06-0202 June 2022 Attachment 5 - Non-Proprietary Version of Licensing Summary Report ML22039A3192022-02-0808 February 2022 Enclosure 1: Callaway Plant - Description of the Proposed Changes ML22027A8072022-01-27027 January 2022 Enclosure 2: Callaway, Unit 1, License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 ULNRC-06690, Enclosure 5: Callaway, Unit 1, LAR Supplement to Address Audit Discussion Points Summarized in NRC Letter Dated September 14, 2021 (ML21238A138)2022-01-27027 January 2022 Enclosure 5: Callaway, Unit 1, LAR Supplement to Address Audit Discussion Points Summarized in NRC Letter Dated September 14, 2021 (ML21238A138) ML21335A4532021-12-0101 December 2021 Enclosure 1: Full Scope Implementation of Alternative Source Term - Evaluation of Proposed Changes ML21335A4522021-12-0101 December 2021 Supplement to License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications ML21328A1842021-11-24024 November 2021 Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-0007 ML21294A4042021-10-21021 October 2021 Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models ML21294A4102021-10-21021 October 2021 Enclosure 10 - Program Implementation ML21294A4112021-10-21021 October 2021 Enclosure 11 - Monitoring Program ML21294A4122021-10-21021 October 2021 Enclosure 12 - Risk Management Action Examples ML21294A4092021-10-21021 October 2021 Enclosure 9 - Key Assumptions and Sources of Uncertainty ML21294A4082021-10-21021 October 2021 Enclosure 8 - Attributes of the Real Time Risk Model ML21294A4072021-10-21021 October 2021 Enclosure 7 - PRA Model Update Process ML21294A4062021-10-21021 October 2021 Enclosure 6 - Justification of Application of At-Power PRA Models to Shutdown Modes ML21294A4032021-10-21021 October 2021 Enclosure 3 - Information Supporting Technical Adequacy of PRA Models Without PRA Standards Endorsed by Regulatory Guide 1.200, Revision 2 2023-08-03
[Table view] |
Text
Attachment 6 to ULNRC-0640 1 Page 1 of 1 LIST OF REGULATORY COMMITMENTS The folIo ing table identifies those actions committed to h Ameren Missouri in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. Please direct questions regarding these commitments to David Brow nawell at (3 14) 225-I $01.
Regulatory Commitment Due Date Commitment Tracking Number Planned modifications are in process to achieve the It is anticipated that the 50428 capabiliP, for one Class I E electrical equipment A/C planned modifications train to provide adeqtiate cooling for both trains of and procedure revisions electrical eqttipment during normal and accident will be completed during conditions by design changes. The planned the Spring 2019 modifications include the following: Refueling Outage Computer points are used to verify the DC switchboard rooms and ES F switchgear room temperatures are less than 87°F and provide an alarm to alert Control Room personnel. The temperature limits established for these i-oorns is 87°F (this includes an allowance for instrument error of +/-3°F).
The alarm setpoint on the associated temperature indicators will be lotvered to 83°F.
2016 Level
- Installation of four recirculation fans \\ith isolation dampers in the ESF switchgear rooms The wattage of the Control Room Presstirization heater 50429 ill be reduced to 5 +/- I KW.
Ameren Missouri will revise the Callaway Emergency 50430 Operating Procedures to provide instructions for restarting the supplemental cooling system for the case when operation of the supplemental cooling system is desired or needed due to the inoperability of a Class I E electrical equipment A/C train during or at the onset of an event/accident involving a loss of offsite power.