ML13364A283 | 30 December 2013 | Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 | Generic Fundamentals Examination |
ML13338A442 | 19 December 2013 | Request for Additional Information Regarding Relief Requests for the Fourth Ten-Year Inservice Inspection Interval | |
ML13350A533 | 18 December 2013 | Acceptance of Requested Licensing Action Proposed Relief Requests for the Fourth 10-Year Inservice Testing Interval (TAC MF2905 Through MF2912 and MF2915) | |
PLA-7110, Registration for the Use of Dry Fuel Storage Module E-7 | 18 December 2013 | Registration for the Use of Dry Fuel Storage Module E-7 | |
ML13312A914 | 18 December 2013 | Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements 3.5.1.12 | Nondestructive Examination Foreign Material Exclusion |
ML13308C034 | 13 December 2013 | Withdrawal of Requested Licensing Action Relief Request 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans | |
PLA-7120, Revised Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval for Susquehanna Units 1 and 2, PLA-7120 | 12 December 2013 | Revised Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval for Susquehanna Units 1 and 2, PLA-7120 | Internal Flooding Hydrostatic Probabilistic Risk Assessment Power-Operated Valves Grace period |
ML13309A080 | 11 December 2013 | Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors | |
ML13361A088 | 11 December 2013 | Revision 116 to Technical Specifications Bases, Unit 2 Manual | Shutdown Margin Ultimate heat sink Post Accident Monitoring Hydrostatic Scram Discharge Volume |
ML13361A087 | 11 December 2013 | Revision 112 to Technical Specification Bases Manual | Shutdown Margin Ultimate heat sink Post Accident Monitoring Hydrostatic Scram Discharge Volume |
TAC:MF1176 | 11 December 2013 | ||
ML13339A896 | 5 December 2013 | Draft 4RR ISI Rais, Susquehanna, Units 1 and 2 | |
ML13339A888 | 5 December 2013 | E-mail from Jwhited to Dfilchner Sending RAIs to TS Amd for TS SR 3.5.1.12 | |
ML13339A892 | 5 December 2013 | Draft ADS Amendment RAIs | Foreign Material Exclusion |
ML13339A894 | 5 December 2013 | E-mail from J. Whited to D. Filchner Sending RAIs for 4RR ISI Relief Requests | |
ML13340A382 | 5 December 2013 | Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters | |
PLA-7108, Response to Nrc'S Request for Additional Information Regarding Request to Change Technical Specification 3.3.6.1 | 4 December 2013 | Response to Nrc'S Request for Additional Information Regarding Request to Change Technical Specification 3.3.6.1 | |
PLA-7106, Response to NRC Request for Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns, PLA-7106 | 27 November 2013 | Response to NRC Request for Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns, PLA-7106 | Fukushima Dai-Ichi |
ML13326A002 | 27 November 2013 | Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval (TAC Nos. MF2905 Through MF2915) | |
TAC:MF2913 | 27 November 2013 | ||
PLA-7100, Registration for the Use of Dry Fuel Storage Module D-7, PLA-7100 | 22 November 2013 | Registration for the Use of Dry Fuel Storage Module D-7, PLA-7100 | |
ML13353A469 | 22 November 2013 | CFR Part 26, Subpart I - Managing Fatigue, for Period Ending 2012 | |
ML13325A123 | 21 November 2013 | E-Mail from Jeff Whited to Jason Jennings (PPL) Transmitting Supplemental Info Request for 4th IST RRs | |
ML13325A121 | 21 November 2013 | Draft Supplemental Information Request in Support of Non-Accept with Opportunity to Supplement Letter for Susquehanna 4th 10-year IST Relief Requests | |
IR 05000387/2013011 | 18 November 2013 | IR 05000388-13-011; 09/16/2013 - 09/19/2013; Susquehanna Steam Electric Station (SSES), Unit 2; Supplemental Inspection - Inspection Procedure (IP) 95001; Follow-up of Events and Notices of Enforcement Discretion | Reactor Vessel Water Level Half scram Enforcement Discretion Test box Significance Determination Process |
IR 05000388/2013011 | 18 November 2013 | IR 05000388-13-011; 09/16/2013 - 09/19/2013; Susquehanna Steam Electric Station (Sses), Unit 2; Supplemental Inspection - Inspection Procedure (IP) 95001; Follow-up of Events and Notices of Enforcement Discretion | Reactor Vessel Water Level Half scram Enforcement Discretion Test box Significance Determination Process |
ML13330A862 | 15 November 2013 | Technical Requirements Manual Updates, Revision 78 | Shutdown Margin Ultimate heat sink Post Accident Monitoring |
ML13310A389 | 15 November 2013 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief | |
ML13330A864 | 15 November 2013 | TRM2 - Technical Requirements Manual, Unit 2 | Shutdown Margin Ultimate heat sink Post Accident Monitoring |
PLA-7091, Change in Completion Date for the Installation of Satellite Phone Base Stations and Antennas, PLA-7091 | 14 November 2013 | Change in Completion Date for the Installation of Satellite Phone Base Stations and Antennas, PLA-7091 | FLEX Fukushima Dai-Ichi |
IR 05000387/2013004 | 14 November 2013 | IR 05000387-13-004 & 05000388-13-004, 07/01/2013 - 09/30/2013; Susquehanna Steam Electric Station, Units 1 and 2; Licensed Operator Requalification Program, Maintenance Risk Assessment and Emergent Work Control, Problem Identification and R | Ultimate heat sink Fire Barrier Water Inventory Control Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Maintenance Rule Program |
ML13305A891 | 13 November 2013 | Request for Additional Information Regarding Request to Change Technical Specification 3.3.6.1 | |
PLA-7096, Registration for the Use of Dry Fuel Storage Module D-6 | 11 November 2013 | Registration for the Use of Dry Fuel Storage Module D-6 | |
ML13295A606 | 6 November 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | Spent Fuel Pool Instrumentation |
IR 05000338/2013014 | 5 November 2013 | Degraded Cornerstone Assessment Follow-Up Letter - 11/5/13, 05000338-13-014 | |
IR 05000387/2013014 | 5 November 2013 | Susquehanna Degraded Cornerstone Assessment Follow-Up Letter - 11/5/13, 05000338-13-014 | |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13303B904 | 30 October 2013 | Draft Request for Additional Information Regarding Proposed License Amendment Request to Change Technical Specification 3.3.6.1 to Allow Only One Manual Trip System to Be Operable for the Rhr....... | |
ML13303B987 | 30 October 2013 | E-Mail Transmitting Draft RHR Amd RAIs | |
Press Release-I-13-037, NRC Assigns New Resident Inspectors to Susquehanna Nuclear Power Plant | 29 October 2013 | Press Release-I-13-037: NRC Assigns New Resident Inspectors to Susquehanna Nuclear Power Plant | New Resident Inspector |
ML13308A314 | 25 October 2013 | Technical Specifications Bases Unit 2 Manual, Revision 3 | Safe Shutdown Shutdown Margin Ultimate heat sink Anticipated operational occurrence Post Accident Monitoring Hydrostatic Scram Discharge Volume |
ML13308A312 | 24 October 2013 | Technical Specification Bases Unit 1 Manual, Revision 3 | Safe Shutdown Shutdown Margin Ultimate heat sink Anticipated operational occurrence Post Accident Monitoring Hydrostatic Scram Discharge Volume |
ML13296A574 | 23 October 2013 | Completion of Work Related to Spot Check of PPL Susquehanna,Llc Decommissioning Trust Fund Report | |
PLA-7092, Withdrawal of Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans for Susquehanna Ses (SSES) Unit 1 and Unit 2, PLA-7092 | 10 October 2013 | Withdrawal of Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans for Susquehanna Ses (SSES) Unit 1 and Unit 2, PLA-7092 | |
PLA-7087, Registration for the Use of Dry Fuel Storage Module E-6, PLA-7087 | 10 October 2013 | Registration for the Use of Dry Fuel Storage Module E-6, PLA-7087 | |
PLA-7055, Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval | 8 October 2013 | Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval | Internal Flooding Hydrostatic Probabilistic Risk Assessment Power-Operated Valves Grace period |
TAC:MF2905 | 8 October 2013 | ||
ML13277A352 | 3 October 2013 | Acceptance Review: Susquehanna, Units 1 and 2, Proposed Relief Requests for the Fourth Ten-Year Inservice Inspection Interval | |
IR 05000387/2013010 | 1 October 2013 | IR 05000387-13-010 and 05000388-13-010; 7/29/2013 to 8/29/2013; PPL Susquehanna, LLC (Ppl); Susquehanna Steam Electric Station, Units 1 and 2; Component Design Bases Inspection | Probabilistic Risk Assessment Significance Determination Process Open Phase Condition Large early release frequency Weak link Power Uprate |
ML13309A230 | 30 September 2013 | Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100) | Safe Shutdown Ultimate heat sink Internal Flooding Enforcement Discretion Earthquake Hardened vent Backfit |