Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13364A28330 December 2013Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013Generic Fundamentals Examination
ML13338A44219 December 2013Request for Additional Information Regarding Relief Requests for the Fourth Ten-Year Inservice Inspection Interval
ML13350A53318 December 2013Acceptance of Requested Licensing Action Proposed Relief Requests for the Fourth 10-Year Inservice Testing Interval (TAC MF2905 Through MF2912 and MF2915)
PLA-7110, Registration for the Use of Dry Fuel Storage Module E-718 December 2013Registration for the Use of Dry Fuel Storage Module E-7
ML13312A91418 December 2013Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements 3.5.1.12Nondestructive Examination
Foreign Material Exclusion
ML13308C03413 December 2013Withdrawal of Requested Licensing Action Relief Request 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans
PLA-7120, Revised Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval for Susquehanna Units 1 and 2, PLA-712012 December 2013Revised Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval for Susquehanna Units 1 and 2, PLA-7120Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Power-Operated Valves
Grace period
ML13309A08011 December 2013Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors
ML13361A08811 December 2013Revision 116 to Technical Specifications Bases, Unit 2 ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML13361A08711 December 2013Revision 112 to Technical Specification Bases ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
TAC:MF117611 December 2013
ML13339A8965 December 2013Draft 4RR ISI Rais, Susquehanna, Units 1 and 2
ML13339A8885 December 2013E-mail from Jwhited to Dfilchner Sending RAIs to TS Amd for TS SR 3.5.1.12
ML13339A8925 December 2013Draft ADS Amendment RAIsForeign Material Exclusion
ML13339A8945 December 2013E-mail from J. Whited to D. Filchner Sending RAIs for 4RR ISI Relief Requests
ML13340A3825 December 2013Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters
PLA-7108, Response to Nrc'S Request for Additional Information Regarding Request to Change Technical Specification 3.3.6.14 December 2013Response to Nrc'S Request for Additional Information Regarding Request to Change Technical Specification 3.3.6.1
PLA-7106, Response to NRC Request for Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns, PLA-710627 November 2013Response to NRC Request for Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns, PLA-7106Fukushima Dai-Ichi
ML13326A00227 November 2013Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval (TAC Nos. MF2905 Through MF2915)
TAC:MF291327 November 2013
PLA-7100, Registration for the Use of Dry Fuel Storage Module D-7, PLA-710022 November 2013Registration for the Use of Dry Fuel Storage Module D-7, PLA-7100
ML13353A46922 November 2013CFR Part 26, Subpart I - Managing Fatigue, for Period Ending 2012
ML13325A12321 November 2013E-Mail from Jeff Whited to Jason Jennings (PPL) Transmitting Supplemental Info Request for 4th IST RRs
ML13325A12121 November 2013Draft Supplemental Information Request in Support of Non-Accept with Opportunity to Supplement Letter for Susquehanna 4th 10-year IST Relief Requests
IR 05000387/201301118 November 2013IR 05000388-13-011; 09/16/2013 - 09/19/2013; Susquehanna Steam Electric Station (SSES), Unit 2; Supplemental Inspection - Inspection Procedure (IP) 95001; Follow-up of Events and Notices of Enforcement DiscretionReactor Vessel Water Level
Half scram
Enforcement Discretion
Test box
Significance Determination Process
IR 05000388/201301118 November 2013IR 05000388-13-011; 09/16/2013 - 09/19/2013; Susquehanna Steam Electric Station (Sses), Unit 2; Supplemental Inspection - Inspection Procedure (IP) 95001; Follow-up of Events and Notices of Enforcement DiscretionReactor Vessel Water Level
Half scram
Enforcement Discretion
Test box
Significance Determination Process
ML13330A86215 November 2013Technical Requirements Manual Updates, Revision 78Shutdown Margin
Ultimate heat sink
Post Accident Monitoring
ML13310A38915 November 2013Reassignment of U.S. Nuclear Regulatory Commission Branch Chief
ML13330A86415 November 2013TRM2 - Technical Requirements Manual, Unit 2Shutdown Margin
Ultimate heat sink
Post Accident Monitoring
PLA-7091, Change in Completion Date for the Installation of Satellite Phone Base Stations and Antennas, PLA-709114 November 2013Change in Completion Date for the Installation of Satellite Phone Base Stations and Antennas, PLA-7091FLEX
Fukushima Dai-Ichi
IR 05000387/201300414 November 2013IR 05000387-13-004 & 05000388-13-004, 07/01/2013 - 09/30/2013; Susquehanna Steam Electric Station, Units 1 and 2; Licensed Operator Requalification Program, Maintenance Risk Assessment and Emergent Work Control, Problem Identification and RUltimate heat sink
Fire Barrier
Water Inventory Control
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
ML13305A89113 November 2013Request for Additional Information Regarding Request to Change Technical Specification 3.3.6.1
PLA-7096, Registration for the Use of Dry Fuel Storage Module D-611 November 2013Registration for the Use of Dry Fuel Storage Module D-6
ML13295A6066 November 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationSpent Fuel Pool Instrumentation
IR 05000338/20130145 November 2013Degraded Cornerstone Assessment Follow-Up Letter - 11/5/13, 05000338-13-014
IR 05000387/20130145 November 2013Susquehanna Degraded Cornerstone Assessment Follow-Up Letter - 11/5/13, 05000338-13-014
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13303B90430 October 2013Draft Request for Additional Information Regarding Proposed License Amendment Request to Change Technical Specification 3.3.6.1 to Allow Only One Manual Trip System to Be Operable for the Rhr.......
ML13303B98730 October 2013E-Mail Transmitting Draft RHR Amd RAIs
Press Release-I-13-037, NRC Assigns New Resident Inspectors to Susquehanna Nuclear Power Plant29 October 2013Press Release-I-13-037: NRC Assigns New Resident Inspectors to Susquehanna Nuclear Power PlantNew Resident Inspector
ML13308A31425 October 2013Technical Specifications Bases Unit 2 Manual, Revision 3Safe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML13308A31224 October 2013Technical Specification Bases Unit 1 Manual, Revision 3Safe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML13296A57423 October 2013Completion of Work Related to Spot Check of PPL Susquehanna,Llc Decommissioning Trust Fund Report
PLA-7092, Withdrawal of Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans for Susquehanna Ses (SSES) Unit 1 and Unit 2, PLA-709210 October 2013Withdrawal of Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans for Susquehanna Ses (SSES) Unit 1 and Unit 2, PLA-7092
PLA-7087, Registration for the Use of Dry Fuel Storage Module E-6, PLA-708710 October 2013Registration for the Use of Dry Fuel Storage Module E-6, PLA-7087
PLA-7055, Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval8 October 2013Proposed Relief Requests for the Fourth Ten-Year Inservice Testing IntervalInternal Flooding
Hydrostatic
Probabilistic Risk Assessment
Power-Operated Valves
Grace period
TAC:MF29058 October 2013
ML13277A3523 October 2013Acceptance Review: Susquehanna, Units 1 and 2, Proposed Relief Requests for the Fourth Ten-Year Inservice Inspection Interval
IR 05000387/20130101 October 2013IR 05000387-13-010 and 05000388-13-010; 7/29/2013 to 8/29/2013; PPL Susquehanna, LLC (Ppl); Susquehanna Steam Electric Station, Units 1 and 2; Component Design Bases InspectionProbabilistic Risk Assessment
Significance Determination Process
Open Phase Condition
Large early release frequency
Weak link
Power Uprate
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit