Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML14189A366 | 31 December 2013 | Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report, Revision 23, Effective Dtae of Contents | |
ONS-2014-085, Oconee Nuclear Station, Units 1, 2, and 3 - Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report, Revision 23, Effective Dtae of Contents | 31 December 2013 | Oconee Nuclear Station, Units 1, 2, and 3 - Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report, Revision 23, Effective Dtae of Contents | |
ML13364A337 | 30 December 2013 | 302 Initial Exam Final SRO Written Exam | Shutdown Margin Coast down |
ML13364A335 | 30 December 2013 | 302 Initial Exam Final RO Written Exam | Coast down |
ML13351A317 | 24 December 2013 | Safety Evaluation Input Regarding Temporary Technical Specification Change Request to Extend the Completion Time for an Inoperable Keowee Hydro Unit | Safe Shutdown Tornado Missile Probabilistic Risk Assessment Earthquake Offsite Circuit |
TAC:MF0939 | 23 December 2013 | ||
ML13354A012 | 23 December 2013 | Review of the October 2012 Steam Generator Tube Inservice Inspections During EOC 27 Refueling Outage | |
ONS-2013-045, Special Report in Accordance with Selected Licensee Commitment (SLC) 16.7.4, Hydrogen Analyzers. | 19 December 2013 | Special Report in Accordance with Selected Licensee Commitment (SLC) 16.7.4, Hydrogen Analyzers. | Grab sample |
ONS-2013-035, Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments 8T, 10T, 17T, and 25H | 19 December 2013 | Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments 8T, 10T, 17T, and 25H | Tornado Missile Probabilistic Risk Assessment Aging Management TORMIS Commercial Grade Fire Protection Program |
ML13352A341 | 18 December 2013 | Letter to Ms. Kit Douglass Providing Last Item Due as Part of Settlement Agreement Reached in Peer V. NRC Case (Case No. 13-1248 (Jdb)) | |
ONS-2013-037, Licensing Basis for Protected Service Water System - Responses to Request for Additional Information Item Nos. 172 Through 189, License Amendment Request (LAR) 2008-07 - Supplement 7 | 18 December 2013 | Licensing Basis for Protected Service Water System - Responses to Request for Additional Information Item Nos. 172 Through 189, License Amendment Request (LAR) 2008-07 - Supplement 7 | Safe Shutdown Shutdown Margin Mission time Fire Barrier Tornado Missile Safe Shutdown Earthquake Operator Manual Action Emergency Lighting B.5.b Earthquake Turbine Missile Fire Protection Program GOTHIC |
ML13350A098 | 16 December 2013 | E-mail from B.Shingleton to R.Guzman Clarification of Upper Shelf Energy Values for ONS Pressure-Temperature Curve 54 EFPY LAR | |
RA-13-1007, 30-Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model | 16 December 2013 | 30-Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model | Exclusive Use Affidavit |
TAC:MF4668 | 16 December 2013 | ||
ML13349A002 | 12 December 2013 | E-mail from B.Shingleton to R.Guzman Revised TS 3.8.1 Markup Pages for License Amendment Request to Extend Khu Allowed Outage Time for Field Pole Rewind Work | |
ONS-2013-036, (Ons), Units 1, 2, and 3 - Completion of Protected Service Water System Milestone 2 | 12 December 2013 | (Ons), Units 1, 2, and 3 - Completion of Protected Service Water System Milestone 2 | Fire Protection Program |
ML13343A002 | 9 December 2013 | 12/9/13 Email from R.Guzman to S.Severance - Oconee Nuclear Station License Amendment Request Standby Shutdown Facility Quality Requirements - Acceptance Review Determination (TAC Nos. MF3000, 3001, and 3002) | |
TAC:MF3000 | 9 December 2013 | ||
ML13346A020 | 6 December 2013 | Additional Information Regarding License Amendment Request for Temporary Technical Specification Change to Add a Required Action Completion Time for One Keowee Hydro Unit Inoperable for Generator Field Pole Rewinds License.... | |
ML13342A002 | 5 December 2013 | 12/5/13 E-mail from R.Guzman to B.Shingleton - Follow-up RAI to Pressure Temperature Curve LAR Supplement 3, Oconee Nuclear Station Units 1, 2, and 3 (TAC Nos. MF0763/64/65) | |
IR 05000269/2013302 | 5 December 2013 | Operator Licensing Written Examination Approval 05000269/13-302, 05000270/13-302, and 05000287/13-302 | |
ML13338A345 | 5 December 2013 | Closure Evaluation for Report Concerning Significant Emergency Core Cooling System Evaluation Model Errors/Changes | Fuel cladding |
ML13339A789 | 5 December 2013 | 12/5/13 e-mail from R.Guzman to B.Meixell GSI-191 Closure Options Due Date Request | |
ML13336A598 | 4 December 2013 | Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Proposed One-time TS Completion Time Change to Perform Khu Generator Field Pole Rewind Maintenance - Oconee Nuclear Station Units 1, 2, and 3 (TAC Nos. ME9021, ME9022, and M | Safe Shutdown |
ML13338A374 | 3 December 2013 | 12/3/13 E-mail from R.Guzman to B.Shingleton - Follow-up Request for Additional Information Keowee LAR for Temp TS Change to Support Keowee Generator Pole Rewind Work | |
ONS-2013-025, Emergency Plan Implementing Procedures Manual, Volume C, Revision 2013-14 | 2 December 2013 | Emergency Plan Implementing Procedures Manual, Volume C, Revision 2013-14 | Shutdown Margin Earthquake Minimum staff |
IR 05000269/2013407 | 2 December 2013 | NRC Temporary Instruction 2515/186 Inspection Report - 05000269/2013407, 05000270/2013407, and 05000287/2013407 (OUO Information Removed) | Affidavit |
ONS-2013-022, Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 5 | 2 December 2013 | Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 5 | |
PNO-II-13-008, A: Update: Oconee Unit 1 Shutdown Due to Reactor Coolant System (RCS) Pressure Boundary Leakage | 2 December 2013 | PNO-II-13-008A: Update: Oconee Unit 1 Shutdown Due to Reactor Coolant System (RCS) Pressure Boundary Leakage | Pressure Boundary Leakage |
ML13339A348 | 30 November 2013 | ANP-3267NP, Revision 0,MRP-227-A Applicant/Licensee Action Item #7 Analysis for the Oconee Nuclear Station Units, Licensing Report | Aging Management Stress corrosion cracking License Renewal Flow Induced Vibration Exclusive Use Affidavit |
ONS-2013-034, Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06, Supplement 5 | 29 November 2013 | Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06, Supplement 5 | Affidavit |
ONS-2013-023, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 3 | 29 November 2013 | Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 3 | |
IR 05000269/2013201 | 29 November 2013 | IR 05000269-13-201, 05000270-13-201, 05000287-13-201; May 21-October 24, 2013, Oconee Nuclear Station, Units 1, 2 and 3; Target Set Inspection - Cover Letter | Affidavit |
ONS-2013-029, Additional Information Regarding License Amendment Request for Temporary Technical Specification Change to Add a Required Action Completion Time for One Keowee Hydro Unit Inoperable for Generator Field Pole Rewinds License. | 26 November 2013 | Additional Information Regarding License Amendment Request for Temporary Technical Specification Change to Add a Required Action Completion Time for One Keowee Hydro Unit Inoperable for Generator Field Pole Rewinds License. | Safe Shutdown Tornado Missile Probabilistic Risk Assessment Offsite Circuit |
ONS-2013-031, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 25 November 2013 | Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | Unanalyzed Condition Seismic Walkdown Report |
ONS-2013-007, Core Operating Limits Report (COLR) | 25 November 2013 | Core Operating Limits Report (COLR) | Boric Acid Shutdown Margin |
ML13305A122 | 25 November 2013 | Enclosure 3 - Areva Document No. 32-9212003-000, Lst Considering RCS Piping and RVCH Limit for B&W Plant Designs, September 2012 | Hydrostatic |
ML13326A721 | 22 November 2013 | Request for Additional Information - Protected Service Water System | Safe Shutdown Mission time Earthquake Turbine Missile |
ONS-2013-027, Emergency Response Data System (ERDS) | 21 November 2013 | Emergency Response Data System (ERDS) | |
ONS-2013-015, Emergency Plan, Volume a, Revision 2013-01 | 14 November 2013 | Emergency Plan, Volume a, Revision 2013-01 | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Probabilistic Risk Assessment Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage Siren Operational leakage |
ML13322B276 | 14 November 2013 | 11/14/13 e-mail from B.Shingleton to R.Guzman PT Curves LAR Supplement 2 - ONS Unit 3 Lower Nozzle Belt Forging Reported in ANP-3127, Revision 2 | |
IR 05000269/2013004 | 14 November 2013 | IR 05000269-13-004, 05000270-13-004 & 05000287-13-004; 07/01/2013 09/30/2013; Oconee Nuclear Station Units 1, 2 and 3; and Emergency Preparedness IR 05000269-13-501, 05000270-13-501 & 05000287-13-501 | Safe Shutdown High winds Fire Barrier Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Condition Adverse to Quality Significance Determination Process Thermoset Operability Determination Fire Protection Program Fire Watch Scaffolding Siren |
ONS-2013-006, Technical Specification Bases Change | 13 November 2013 | Technical Specification Bases Change | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
ML13336A545 | 13 November 2013 | Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Keowee Hydro Unit Generator Field Pole Rewind Project - License Amendment Request | Safe Shutdown Mission time |
ML13316C262 | 12 November 2013 | Preliminary Notification of Event or Unusual Occurrence - PNO-II-13-008, Oconee Unit 1 Shutdown Due to Reactor Coolant System (RCS) Pressure Boundary Leakage | Pressure Boundary Leakage Unidentified leak |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
RA-13-1004, 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results | 6 November 2013 | 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results | Fitness for Duty |
ML13308A389 | 4 November 2013 | E-mail from R.Guzman to B.Shingleton Request for Additional Information - LAR to Update Pressure Temperature Limit Curves (TACs ME0763/64/65) | |
ML13303B828 | 1 November 2013 | Notice of Meeting with Duke Energy to Discuss Proposed License Amendment Request Regarding Temporary Technical Specification Change for One Keowee Hydro Unit Inoperable - Oconee Nuclear Station, Units 1, 2, and 3 | |
TAC:MF9023 | 1 November 2013 |