TAC:MF4668
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
| |
From | |
MONTHYEARRA-13-1007, 30-Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model2013-12-16016 December 2013
[table view]30-Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model ONS-2014-080, License Amendment Request (LAR) to Reduce Allowed Maximum Rated Thermal Power When High Pressure Injection (HPI) Equipment Is Inoperable License Amendment Request No. 2013-032014-06-30030 June 2014 License Amendment Request (LAR) to Reduce Allowed Maximum Rated Thermal Power When High Pressure Injection (HPI) Equipment Is Inoperable License Amendment Request No. 2013-03 RA-14-0014, Duke Energy Carolinas, LLC (Duke Energy): 10 CFR 50.46 - Annual Report for 2013 for Oconee Nuclear Station, Units 1, 2 and 32014-07-0707 July 2014 Duke Energy Carolinas, LLC (Duke Energy): 10 CFR 50.46 - Annual Report for 2013 for Oconee Nuclear Station, Units 1, 2 and 3 ML14337A0952014-11-25025 November 2014 Part 21 - Defect in LOCA Analysis for B&W Plants RA-14-0032, CFR 50.46 - 30-Day Report for Estimated Impacts to Peak Cladding Temperature Due to Fuel Pellet Thermal Conductivity Degradation2014-12-17017 December 2014 CFR 50.46 - 30-Day Report for Estimated Impacts to Peak Cladding Temperature Due to Fuel Pellet Thermal Conductivity Degradation ML15141A1472015-05-21021 May 2015 Request for Additional Information Regarding LAR to Reduce Allowed Maximum Rated Thermal Power When High Pressure Injection Equipment Is Inoperable LAR No. 2013-031 ML15166A0192015-06-0808 June 2015 Response to Request for Additional Information Regarding the License Amendment Request (LAR) to Reduce Allowed Maximum Rated Thermal Power When High Pressure Injection (HPI) Equipment Is Inoperable, LAR No. 2013-03 ML15166A3872015-09-24024 September 2015 Issuance of Amendments Regarding Allowed Maximum Rated Thermal Power 2014-06-30 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:MF4668&oldid=491888"