Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ZS-2014-0100, Offsite Dose Calculation Manual31 December 2013Offsite Dose Calculation ManualBoric Acid
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
B.5.b Mitigating Strategies
Deep Dose Equivalent
RS-13-248, Relief Request 14R-17, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fourth Inservice Inspection Interval30 December 2013Relief Request 14R-17, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fourth Inservice Inspection IntervalVT-2
CAC:MF335230 December 2013
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding WalkdownsUnanalyzed Condition
TAC:MF022323 December 2013
ML13365A14023 December 2013U.S. Dept of Homeland Security/Final After Action (Aar)/Improvement Plan (IP) for the August 21, 2013, Radiological Emergency Preparedness (REP) Partial Participation Hostile Action Based (HAB) Plume Exposure Pathway Exercise for the Dresde
ML13354B93820 December 2013Order (Granting Joint Unopposed Motion for Extension of Time)
ML13353A60519 December 2013Establishment of Atomic Safety and Licensing Board in the Matter of Dresden Nuclear Power Confirmatory Order Modifying License
RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.19 December 2013Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.Safe Shutdown
Reactor Vessel Water Level
Mission time
Stroke time
Post Accident Monitoring
Scram Discharge Volume
MELLLA
ML13353A72219 December 2013Notice of Appearance of Tamra S. Domeyer on Behalf of Exelon Generation Company, LLC in the Matter of Dresden, Units 2 and 3
TAC:MF335919 December 2013
ML13353A72319 December 2013Joint Unopposed Motion for Extension of Time to File Answer to Petition to Intervene
IR 05000237/201330117 December 2013Er 05000237/13-301; 05000249/13-301; 9/30/2013 - 11/26/2013; Exelon Nuclear Operations, Inc., Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination ReportJob Performance Measure
ML13354B94717 December 2013MIP-Dresden Nuclear Power Station 2014 Master Inspection Plan
ML13347B32616 December 2013M. Pacilio Ltr. Request for Additional for Decommissioning Funding Status Report for Dresden Unit 1 and Peach Bottom Unit 1
ML13347B09613 December 2013As-Administered ExamHot Short
Grab sample
Scram Discharge Volume
Earthquake
Fuel cladding
Recently irradiated fuel
Power change
ML13347B34013 December 2013Referral Memo of the Secretary to the ASLB Regarding Request for Hearing in the Matter of Exelon Generation Company, LLC, Dresden Nuclear Power Station
ML13346B04212 December 2013Notice of Appearance of Marilyn S. Teitelbaum
ML13346B05212 December 2013Notice of Appearance of Rochelle G. Skolnick
ML13347B09812 December 2013Changes to Dresden 2013 Written Exam QuestionsHot Short
Fuel cladding
RA-13-119, Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1.12 December 2013Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1.
ML13346B03012 December 2013Petition to Intervene and Request for Hearing
TAC:MF117611 December 2013
ML13309A08011 December 2013Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors
ML13354B8502 December 20132013, Dresden Initial License Exam, as Administered Admin JPMsJob Performance Measure
RA-13-109, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns27 November 2013Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic WalkdownsFukushima Dai-Ichi
Design basis earthquake
ML13354B86325 November 20132013, Dresden Initial License Exam, as Administered In-plant JPMsJob Performance Measure
ML13354B98925 November 20132013, Dresden Initial License Exam, ES-401-9 Form
ML13354B98425 November 20132013, Initial License Exam, ES-301-6 Form
ML13354B93925 November 20132013 Dresden Initial License Exam, Es 401-1 Sheets
ML13354B97525 November 20132013, Dresden Initial License Exam, Proposed System JPMsHalf scram
Squib
Job Performance Measure
ML13354C00025 November 20132013 Dresden Initial License Exam, Es 401-4 Form
ML13354B95725 November 20132013, Dresden Initial License Exam, Early Written ExamScram Discharge Volume
ML13354B87025 November 20132013, Dresden Initial License Exam, as Administered System JPMsSquib
Job Performance Measure
ML13354B96225 November 20132013, Dresden Initial License Exam, Proposed In-Plant JPMsJob Performance Measure
ML13354B92425 November 20132013, Dresden Initial License Exam, Written Exam ReferencesSafe Shutdown
High Radiation Area
Locked High Radiation Area
Surveillance Frequency Control Program
Scram Discharge Volume
Deep Dose Equivalent
Recently irradiated fuel
Fire Watch
Power change
ML13354B94525 November 20132013 Dresden Intial License Exam, Es 401-3 Sheets
SVPLTR 13-0048, Notification of Readiness for NRC 95001 Inspection25 November 2013Notification of Readiness for NRC 95001 Inspection
ML13354B96025 November 20132013, Dresden Initial License Exam, Proposed Admin JPMsJob Performance Measure
ML13269A28725 November 2013County Station, Units 1 and 2; and Quad Cities Nuclear Power Station, Units 1 and 2 - Request for Additional Information Related to Potential Loss of Spent Fuel Pool CoolingSafe Shutdown
Ultimate heat sink
Fukushima Dai-Ichi
Earthquake
ML13354C04925 November 20132013, Dresden Initial License Exam, ES-201-1 Form
ML13354B86925 November 20132013, Dresden Initial License Exam, as Administered ScenariosHalf scram
Post Accident Monitoring
Overtravel
Power change
SVPLTR 13-0047, Core Operating Limits Report for Unit Cycle 2422 November 2013Core Operating Limits Report for Unit Cycle 24Safety Limit Minimum Critical Power Ratio
MELLLA
ML13220A23822 November 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation StrategiesSafe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
Hardened vent
GOTHIC
ML13317A82920 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Dresden Nuclear Power Station Units 2 and 3, TAC Nos.: MF1046 and MF1047Safe Shutdown
High winds
Ultimate heat sink
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Containment Hardened Vent
Frazil ice
Earthquake
SVPLTR 13-0045, CFR 72.48 Evaluation Summary Changes, Tests or Experiments, Including a Summary of Report Evaluation of Each Performed18 November 2013CFR 72.48 Evaluation Summary Changes, Tests or Experiments, Including a Summary of Report Evaluation of Each Performed
ML13316B8348 November 2013Fifth (5 Th) Ten-Year Interval Inservice Testing ProgramSafe Shutdown
Grab sample
Stroke time
Squib
Incorporated by reference
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
Grace period
ML13311A3136 November 20132013 Annual Report - Guarantees of Payment of Deferred Premiums
ML13310B6856 November 2013NRR E-mail Capture - Preliminary Additional RAI Questions Regarding Use of Code Case N-786
IR 05000237/20134065 November 2013IR 05000237-13-406; 05000249-13-406; 09/23/2013 - 09/27/2013, Dresden Nuclear Power Station, Units 2 and 3; Routine Security Baseline Inspection (Cover Letter Only)Affidavit