Category:Letter
MONTHYEARIR 05000277/20244012024-10-17017 October 2024 Security Baseline Inspection Report 05000277/2024401 and 05000278/2024401 (Cover Letter Only) RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000237/20230052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2023005; 05000249/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 IR 05000237/20230112024-08-0707 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 IR 05000237/20200012024-08-0606 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001 ML24184A1712024-08-0202 August 2024 SLRA Schedule Letter ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information2024-07-31031 July 2024 Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information ML24136A1322024-07-30030 July 2024 Transmittal Letter for Renewed License ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24193A0882024-07-24024 July 2024 Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Unit 1 Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations (Docket 50-10) ML24204A1862024-07-24024 July 2024 – Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2; TSTF-591, Revision 0; and 10 CFR 50.69 ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report IR 05000237/20243012024-06-27027 June 2024 NRC Initial License Examination Report 05000237/2024301; 05000249/2024301 ML24138A0572024-06-26026 June 2024 – Issuance of Amendment Nos. 285 and 278 Application to Adopt TSTF-564, Safety Limit MCPR ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years ML24138A1812024-06-18018 June 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24128A2742024-06-14014 June 2024 Notice of Acceptance and Opportunity for Hearing - Letter 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1772024-07-0303 July 2024 Request for Additional Information ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24066A0872024-03-0404 March 2024 NRR E-mail Capture - Dresden 2 and 3 - Request for Additional Information for Alternative Request I5R-22 ML24067A1242024-03-0101 March 2024 Email to Christian Williams: Request for Additional Information Regarding Dresden Relief Request Dated February 23, 2024 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23052A0652023-02-21021 February 2023 NRR E-mail Capture - Dresden Units 2 and 3 - Request for Additional Information for Alternative Request RV-23H ML23037A9192023-02-0707 February 2023 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000237/2023011 and 05000249/2023011 ML23019A0132023-01-12012 January 2023 NRR E-mail Capture - Final RAI Dresden 2 and 3 - License Amendment Pertaining to GNF3 Fuel Transition ML22290A0842022-10-13013 October 2022 NRR E-mail Capture - Dresden 2 and 3 - RAI License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies ML22270A1032022-09-27027 September 2022 Notification of NRC Baseline Inspection and Request for Information (05000249/2022004) ML22203A0442022-07-21021 July 2022 Request for Additional Information (RAI) ML22199A2422022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Dresden 2 and 3 Proposed Alternative Related to Sblc Nozzle Inspection for the Sixth Inservice Inspection Interval ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22021A5692022-01-21021 January 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000277/2022403 and 05000278/2022403 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21244A4012021-08-10010 August 2021 (Final) Request for Information (RAI) Dresden, Units 1, 2, 3, and ISFSI Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50 Appendix E ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21097A2602021-04-0808 April 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21096A1752021-04-0606 April 2021 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000237/2021011; 05000249/2021011 ML21063A3202021-03-0202 March 2021 RAIs for Dresden, Units 2 and 3, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (EPID L-2020-LLA-0239) (E-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21035A2222021-02-0404 February 2021 Notification of Conduct of a Fire Protection Team Inspection ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20337A4242020-12-0202 December 2020 Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection 05000237/2021401 and 05000249/2021401 ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20231A7432020-08-18018 August 2020 Request for Additional Information (IOLB/HFT-RAI-1) Dresden MSIV LAR ML20224A3532020-08-11011 August 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000249/2020004 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20094H0292020-03-27027 March 2020 Final: Dresden, Units 2 & 3 LAR Request for Additional Information to Modify Technical Specifications to Main Steam Isolation Valve Leakage Requirements ML20071G2242020-03-11011 March 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML19330E1772019-11-25025 November 2019 RAI Dresden/Clinton Request for LAR to Modify TSs Following Adoption of TSTF-542 ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs ML19232A1752019-08-20020 August 2019 Request for Additional Information - TSTF-500 Implementation LAR ML19226A3712019-08-14014 August 2019 Ltr. 08/14/19 Dresden Nuclear Power Station, Unit 2 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2019004 (DRS-M.Domke) ML19140A2822019-05-15015 May 2019 027 Pb FU RAI Subsequent to Clarification Call - Cu Greater than 15 Zn Holston (Jg) ML19140A2832019-05-15015 May 2019 Email - Peach Bottom Atomic Power Station, Units 2 and 3 Second Round RAI Request - Set 1 ML19253D2932019-05-0707 May 2019 002 Attachment 4D Confirmation Water Chemistry Chereskin Revised (002) ML19249C7252019-05-0303 May 2019 SLRA Requests for Additional Information - Set 2 May 3, 2019 2024-07-03
[Table view] |
Text
December 16, 2013 Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Pacilio:
On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos.50-010 and 50-171
Enclosure:
RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists
Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Pacilio:
On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos.50-010 and 50-171
Enclosure:
RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists DISTRIBUTION: ROrlikowski, RIII MFerdas, RI AKock, NRR KLois, NRR ML13347B326 OFC DWMEP DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston SGiebel BWatson JHickman DATE 12 / 16 / 2013 12 / 16 / 2013 12/16 /2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2012 DECOMMISSIONING FUNDING STATUS REPORT FOR DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1 The requests for additional information (RAIs) are in response to the 2013 Decommissioning Funding Status (DFS) Report for Dresden Nuclear Power Station, Unit 1 and Peach Bottom Atomic Power Station, Unit 1. On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1 (Dresden 1), and Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom) as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
RAI #1: Minimum Formula Amount On April 1, 2013, EGC provided radiological decommissioning costs associated with license termination for Dresden 1 and Peach Bottom. EGC did not provide the required minimum funding assurance amount, based on the formula from 10 CFR 50.75(c).
Per 10 CFR 50.75(f)(1), the information in this report must include, at a minimum the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c).
For both Dresden 1 and Peach Bottom provide the amount of decommissioning funds estimated to be required based on the formula from 10 CFR Sections 50.75(b) and (c).
RAI # 2: Decommissioning Costs On April 1, 2013, EGC did not provide the estimated total cost of decommissioning activities as stated in the most recent Site Specific Cost Estimate (SSCE) update. EGC did provide the estimated cost of remaining decommissioning activities.
Per 10 CFR 50.82(a)(8)(v)(A) and (B) , the report must include the following information, current through the end of the previous calendar year: the amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon; an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
For both Dresden 1 and Peach Bottom provide the estimated total cost of decommissioning activities as stated in the most recent SSCE update.
RAI # 3: Decommissioning Costs On April 1, 2013, EGC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
Enclosure
2 Per 10 CFR 50.82(a)(8)(v),
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
For both Dresden 1 and Peach Bottom provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
Dresden Nuclear Power Station, Unit 1 Service List cc:
Site Vice President - Dresden Nuclear Director - Licensing and Regulatory Affairs Power Station Exelon Generation Company, LLC Exelon Generation Company, LLC 4300 Winfield Road 6500 North Dresden Road Warrenville, IL 60555 Morris, IL 60450-9765 Manager Licensing - Clinton, Dresden, Plant Manager - Dresden Nuclear and Quad Cities Power Station Exelon Generation Company, LLC Exelon Generation Company, LLC 4300 Winfield Road 6500 North Dresden Road Warrenville, IL 60555 Morris, IL 60450-9765 Vice President and Deputy General Counsel Manager Regulatory Assurance - Dresden Exelon Generation Company, LLC Nuclear Power Station 200 Exelon Way, KSA-3E Exelon Generation Company, LLC Kennett Square, PA 19348 6500 North Dresden Road Morris, IL 60450-9765 Document Control Desk - Licensing Exelon Generation Company, LLC Senior Vice President, Midwest Operations 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Business Services Company, LLC Vice President, Midwest Operations 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Business Services Company, LLC Senior Vice President - Operations Support 200 Exelon Way, KSA-3E Exelon Generation Company, LLC Kennett Square, PA 19348 4300 Winfield Road Warrenville, IL 60555 U.S. Nuclear Regulatory Commission Resident Inspectors Office Vice President - Operations Support Dresden Station Exelon Generation Company, LLC 6500 North Dresden Road 4300 Winfield Road Morris, IL 60450-9765 Warrenville, IL 60555 Chairman Vice President - Licensing and Regulatory Grundy County Board Affairs Administration Building Exelon Generation Company, LLC 1320 Union Street 4300 Winfield Road Morris, IL 60450 Warrenville, IL 60555
Regional Administrator U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Lisle, IL 60532-4352 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704
Peach Bottom Atomic Power Station, Unit 1 Service List cc:
Mr. Michael J. Pacilio 4300 Winfield Road Senior Vice President Warrenville, IL 60555 Exelon Generation Company, LLC 4300 Winfield Road Mr. Keith R. Jury Warrenville, IL 60555 Vice President, Licensing and Regulatory Affairs Mr. Christopher M. Crane Exelon Generation Company, LLC President and Chief Operating Officer 4300 Winfield Road Exelon Corporation Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 Mr. Timothy J. Tulon Vice President, Midwest Operations, Mr. Charles G. Pardee Exelon Generation Company, LLC Chief Operating Officer (COO) 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations Ms. Susan R. Landahl Exelon Generation Company, LLC Senior Vice President 200 Exelon Way, KSA 3-N Exelon Generation Company, LLC Kennett Square, PA 19348 4300 Winfield Road Warrenville, IL 60555 Mr. Robert J. Hovey Vice President, Nuclear Oversight Mr. Ronald J. De Gregorio Exelon Generation Company, LLC Senior Vice President, Operations Support 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Mr. Joseph P. Grimes, Jr. Power Station Senior Vice President, Mid-Atlantic Exelon Generation Company, LLC Operations 1848 Lay Road Exelon Generation Company, LLC Delta, PA 17314 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Plant Manager - Peach Bottom Atomic Power Station Mr. Stephen E. Kuczynski Exelon Generation Company, LLC Senior Vice President, Engineering and 1848 Lay Road Technical Services Delta, PA 17314 Exelon Generation Company, LLC 4300 Winfield Road Manager Regulatory Assurance - Peach Warrenville, IL 60555 Bottom Atomic Power Station Exelon Generation Company, LLC Mr. Bryan C. Hanson 1848 Lay Road Senior Vice President, Midwest Operations Delta, PA 17314 Exelon Generation Company, LLC
Mr. Roland Fletcher Vice President, Licensing and Regulatory Department of Environment Affairs Radiological Health Program Exelon Generation Company, LLC 2400 Broening Highway 4300 Winfield Road Baltimore, MD 21224 Warrenville, IL 60555 Director, Licensing and Regulatory Affairs Associate General Counsel Exelon Generation Company, LLC Exelon Generation Company, LLC Correspondence Control 4300 Winfield Road P.O. Box 160 Warrenville, IL 60555 Kennett Square, PA 19348 Correspondence Control Desk Manager Licensing Exelon Generation Company, LLC Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Correspondence Control Kennett Square, PA 19348 P.O. Box 160 Kennett Square, PA 19348 Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township R.D. #1 Delta, PA 17314 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Center Baltimore, MD 21202-6806 Ms. Susan Grey Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236