2013, Dresden Initial License Exam, as Administered In-plant JPMs
ML13354B863
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/25/2013
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Walton R
Shared Package
ML11355A018 List:
References
Download: ML13354B863 (25)


Text

Exelon Nuclear Job Performance Measure CRD - LINEUP HEAD COOLING FOR ALTERNATE WATER INJECTION JPM Number: S-N-i Revision Number: 06 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 05 Bank JPM.

Revision 06 Revised for ILT 12-1 (2013-301) NRC Exam.

S-N-i Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.

S-N-i Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred resulting in RPV level dropping below -143".
3. All normal means of RPV level makeup have been lost.
4. The Shift Manager has decided to makeup to the RPV using alternate injection system lineups, including injecting water into the RPV using Reactor Head Cooling System.
5. DEOP 500-03 has been completed up through and including step G.7.f.
6. A Group II isolation signal is present.
7. Electricians are unavailable to take ammeter readings on MO 2-205-24 valve to determine when it is open.

INITIATING CUE

1. The Shift Manager has directed you to open MOV 2-205-24 in accordance DEOP 500-3 step G.7.g.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

S-N-i Page 4 of 9

Job Performance Measure (JPM)

  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-i Page 5 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the provided copy of DEOP 0500-03.

Local Starter Panel 28-1-1 is located on RBX 1st Floor behind MCC 28-1.

An insulated tool can be a flashlight, fuse puller, phone receiver, etc.

Ensure to provide cue for step 3 immediately after the candidate performs it, as it is time sensitive.

1. Establish communication Contacts Unit 2 NSO.

between the Local Starter Panel and the NSO in the _____ _____ _____

Control Room.

CUE:

Respond as Unit 2 NSO.

  • 2. At Local Starter Panel 28-1-1, DEPRESSES the MO open door and depress MO- 205-24 OPEN contactor 2-205-24 motor OPEN (the left contactor) with an contactor with an insulated insulated tool. _____ _____ _____

tool.

CUE:

After the OPEN contactor is pushed in, report that MO 2-205-24 valve has dual indication.

After approximately 5 seconds report that MO 2-205-24 valve has a full open indication.

3. Release OPEN contactor RELEASES open when notified by NSO that full contactor open indication is received.

CUE:

If the breaker is NOT opened within 5 seconds after releasing contactor, then report the valve has double indication.

If 10 seconds elapse, report as the NSO that the valve has full closed indication.

  • 4. Immediately OPEN breaker MO 2-205-24 breaker for MO 2-205-24, HEAD CLG switch placed in OFF RX INLET ISOL VLV) to position.

prevent valve from reclosing. _____ _____ _____

S-N-i Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

5. Closes breaker door. Door closed.

CUE:

The MO 2-205-24 breaker is OPEN.

6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-i Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

CRD - LINEUP HEAD COOLING FOR ALTERNATE WATER INJECTION Revision Number: 06 JPM Number: S-N-i Task Number and

Title:

2950L093, Line Up Reactor Head Cooling for Alternate Water Injection K/A Number and Importance: 295031.A1.08 3.8/3.9 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 19 minutes Actual Time Used: minutes

References:

DEOP 0500-03, rev 22 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-i Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred resulting in RPV level dropping below -143".
3. All normal means of RPV level makeup have been lost.
4. The Shift Manager has decided to makeup to the RPV using alternate injection system lineups, including injecting water into the RPV using Reactor Head Cooling System.
5. DEOP 500-03 has been completed up through and including step G.7.f.
6. A Group II isolation signal is present.
7. Electricians are unavailable to take ammeter readings on MO 2-205-24 valve to determine when it is open.

INITIATING CUE

1. The Shift Manager has directed you to open MOV 2-205-24 in accordance DEOP 500-3 step G.7.g.
2. Inform the Unit Supervisor when the task is complete.

S-N-i Page 9 of 9

Exelon Nuclear Job Performance Measure ISO COND - VALVE IN LOCAL SIGHTGLASS JPM Number: S-N-j Revision Number: 11 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 10 Bank JPM.

Revision 11 Revised for ILT 12-1 (2013-301) NRC Exam.

S-N-j Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this is an in-plant JPM.

DOCUMENT PREPARATION

1. Clean copy of DOP 1300-05.

S-N-j Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 is controlling RPV pressure using the Isolation Condenser.
3. The Isolation Condenser water level indication in the Control Room is erratic and unreliable.

INITIATING CUE

1. The Unit Supervisor has directed you to valve in the Unit 2 Isolation Condenser local water level sight glass per DOP 1300-05 and then report Isolation Condenser water level to the Control Room.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-j Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DOP 1300-05.

CUE:

IF examinee cannot find the sight glass drain valve and states the he/she would contact a supervisor, provide the report: what does the procedure state and/or trace the flowpath?

1. Verify the sight glass drain Petcock valve operator full valve is closed. CW.

CUE:

The component is in the condition you have described.

2. Verify 2A-1341A, ISOL CDSR Hand wheel is full CCW.

LVL INST ROOT VLV is open. _____ _____ _____

CUE:

The component is in the condition you have described.

  • 3. Open 2-1301-39, ISOL CDSR Rotate hand wheel full SIGHT GLASS HI SIDE SV. CCW.

CUE:

The component is in the condition you have described.

  • 4. Open 2-1301-40, ISOL CDSR Rotate hand wheel full SIGHT GLASS LO SIDE SV CCW.

CUE:

The component is in the condition you have described.

  • 5. Open 2-1301-633, ISOL Rotate hand wheel full CDSR SIGHT GLASS HI CCW.

SIDE ROOT _____ _____ _____

S-N-j Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

The component is in the condition you have described.

  • 6. Open 2-1301-634, ISOL Rotate hand wheel full CDSR SIGHT GLASS LO CCW.

SIDE ROOT. _____ _____ _____

CUE:

The component is in the condition you have described.

7. Observe indicated level in the Observes indicated level in sight glass. the sight glass.

CUE:

The sight glass is completely FULL.

8. Report indicated sight glass Informs Control Room level to the control room. local Isolation Condenser sightglass level is full or _____ _____ _____

> 67 inches.

CUE:

Repeat back sight glass level.

9. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-j Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

ISO COND - VALVE IN LOCAL SIGHTGLASS Revision Number: 11 JPM Number: S-N-j Task Number and

Title:

207N008, Valve in Isolation Condenser Local Sight glass K/A Number and Importance: 207000.A3.01 3.5 / 3.7 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

DOP 1300-05, rev 06 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-j Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 is controlling RPV pressure using the Isolation Condenser.
3. The Isolation Condenser water level indication in the Control Room is erratic and unreliable.

INITIATING CUE

1. The Unit Supervisor has directed you to valve in the Unit 2 Isolation Condenser local water level sight glass per DOP 1300-05 and then report Isolation Condenser water level to the Control Room.
2. Inform the Unit Supervisor when the task is complete.

S-N-j Page 8 of 8

Exelon Nuclear Job Performance Measure SERV WATER - REVERSE FLOW THROUGH X AREA COOLERS JPM Number: S-N-k Revision Number: 00 Date: 06/11 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Bank JPM S-N-k Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is an in-plant JPM.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Clean copy of DOP 3900-02.

S-N-k Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A review of the Operator logs indicate that X-area temperature and cooler differential pressure has been increasing.
3. The x-area coolers are in a normal configuration.

INITIATING CUE

1. The Unit 3 Unit Supervisor has directed you to reverse flow through U3 x-area cooler from normal to reverse, per DOP 3900-02, step G.2.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-k Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide Examinee the supplied copy of DOP 3900-02.

1. Check X-area temperatures Verifies temperature at back panel 903-21 on TR3- indications on the 903-21.

1631-01; Steam Leak Detection points 13-16.

CUE:

The temperature indicated on TR3-1631-01; Stm Leak Detection points 13-16 are elevated slightly above normal.

2. Check SW dP across X-Area Checks the SW dP across Coolers by taking the the X-area.

difference between the following pressure indicators (at SW penetration through X-Area wall).

  • PI 3-3941-895, U3 MN STM _____ _____ _____

TUNNEL CLR SW IN/OUT HEADER.

CUE:

dP is slightly elevated above normal.

3. Refer to Figure 1, SW to U3 Refers to Figure 1.

X-Area Coolers.

  • 4. Open the following valves Rotates manual valve (Located North of MCC 36-1): hand wheel(s) Counter Clock Wise (CCW) until
  • 3-3999-325, U3 X AREA movement stops.

CLRS REVERSE FLOW VLV.

  • 3-3999-326, U3 X AREA CLRS REVERSE FLOW VLV.

S-N-k Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

Valve hand wheel(s) stops moving. The valve(s) is open.

  • 5. Close the following valves Rotates manual valve (North of MCC 36-1): hand wheel(s) Clock Wise (CW) until movement
  • 3-3999-327, U3 X AREA stops.

CLRS NORM FLOW VLV.

  • 3-3999-328, U3 X AREA CLRS NORM FLOW VLV.

CUE:

Valve hand wheel(s) stops moving. The valve(s) is open.

6. Check flow reversal by Verifies that SW dP across checking SW dP across X- the X-area coolers has Area Coolers has reversed reversed and that X-area and X-area temperatures temperatures are dropping _____ _____ _____

have dropped. as indicated on the 903-21 panel.

CUE:

dP - The pressures indicate reversed flow.

Temp - Temperature is trending down. Another NSO will monitor the downward trend.

7. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-k Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

Reverse Service Water Flow Through X-Area Coolers Revision Number: 00 JPM Number: S-N-k Task Number and

Title:

239N005: Perform a Unit 3 X-Area room cooler flow reversal operation.

K/A Number and Importance: Generic.1.30 4.4 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

DOP 3900-02, rev 12 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-k Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A review of the Operator logs indicate that X-area temperature and cooler differential pressure has been increasing.
3. The x-area coolers are in a normal configuration.

INITIATING CUE

1. The Unit 3 Unit Supervisor has directed you to reverse flow through U3 x-area cooler from normal to reverse, per DOP 3900-02, step G.2.
2. Inform the Unit Supervisor when the task is complete.

S-N-k Page 8 of 8