Exelon Nuclear Job Performance Measure CRD - LINEUP HEAD COOLING FOR ALTERNATE WATER INJECTION JPM Number: S-N-i Revision Number: 06 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-i Page 2 of 9 Revision Record (Summary)

Revision 05 Bank JPM.

Revision 06 Revised for ILT 12-1 (2013-301) NRC Exam.

Job Performance Measure (JPM)

S-N-i Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.

Job Performance Measure (JPM)

S-N-i Page 4 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred resulting in RPV level dropping below -143".
3. All normal means of RPV level makeup have been lost.
4. The Shift Manager has decided to makeup to the RPV using alternate injection system lineups, including injecting water into the RPV using Reactor Head Cooling System.
5. DEOP 500-03 has been completed up through and including step G.7.f.
6. A Group II isolation signal is present.
7. Electricians are unavailable to take ammeter readings on MO 2-205-24 valve to determine when it is open.

INITIATING CUE

1. The Shift Manager has directed you to open MOV 2-205-24 in accordance DEOP 500-3 step G.7.g.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Job Performance Measure (JPM)

S-N-i Page 5 of 9

  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-i Page 6 of 9 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Provide the Examinee with the provided copy of DEOP 0500-03.

Local Starter Panel 28-1-1 is located on RBX 1st Floor behind MCC 28-1.

An insulated tool can be a flashlight, fuse puller, phone receiver, etc.

Ensure to provide cue for step 3 immediately after the candidate performs it, as it is time sensitive.

1.

Establish communication between the Local Starter Panel and the NSO in the Control Room.

Contacts Unit 2 NSO.

CUE:

Respond as Unit 2 NSO.

2.

At Local Starter Panel 28-1-1, open door and depress MO-2-205-24 motor OPEN contactor with an insulated tool.

DEPRESSES the MO 205-24 OPEN contactor (the left contactor) with an insulated tool.

CUE:

After the OPEN contactor is pushed in, report that MO 2-205-24 valve has dual indication.

After approximately 5 seconds report that MO 2-205-24 valve has a full open indication.

3.

Release OPEN contactor when notified by NSO that full open indication is received.

RELEASES open contactor CUE:

If the breaker is NOT opened within 5 seconds after releasing contactor, then report the valve has double indication.

If 10 seconds elapse, report as the NSO that the valve has full closed indication.

4.

Immediately OPEN breaker for MO 2-205-24, HEAD CLG RX INLET ISOL VLV) to prevent valve from reclosing.

MO 2-205-24 breaker switch placed in OFF position.

Job Performance Measure (JPM)

S-N-i Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

5.

Closes breaker door.

Door closed.

CUE:

The MO 2-205-24 breaker is OPEN.

6.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-i Page 8 of 9 Operators Name:

Job

Title:

RO SRO JPM

Title:

CRD - LINEUP HEAD COOLING FOR ALTERNATE WATER INJECTION Revision Number: 06 JPM Number: S-N-i Task Number and

Title:

2950L093, Line Up Reactor Head Cooling for Alternate Water Injection K/A Number and Importance: 295031.A1.08 3.8/3.9 Suggested Testing Environment: In-Plant Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 19 minutes Actual Time Used:

minutes

References:

DEOP 0500-03, rev 22 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-i Page 9 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred resulting in RPV level dropping below -143".
3. All normal means of RPV level makeup have been lost.
4. The Shift Manager has decided to makeup to the RPV using alternate injection system lineups, including injecting water into the RPV using Reactor Head Cooling System.
5. DEOP 500-03 has been completed up through and including step G.7.f.
6. A Group II isolation signal is present.
7. Electricians are unavailable to take ammeter readings on MO 2-205-24 valve to determine when it is open.

INITIATING CUE

1. The Shift Manager has directed you to open MOV 2-205-24 in accordance DEOP 500-3 step G.7.g.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure ISO COND - VALVE IN LOCAL SIGHTGLASS JPM Number: S-N-j Revision Number: 11 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-j Page 2 of 8 Revision Record (Summary)

Revision 10 Bank JPM.

Revision 11 Revised for ILT 12-1 (2013-301) NRC Exam.

Job Performance Measure (JPM)

S-N-j Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. None, this is an in-plant JPM.

DOCUMENT PREPARATION

1. Clean copy of DOP 1300-05.

Job Performance Measure (JPM)

S-N-j Page 4 of 8 INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 is controlling RPV pressure using the Isolation Condenser.
3. The Isolation Condenser water level indication in the Control Room is erratic and unreliable.

INITIATING CUE

1. The Unit Supervisor has directed you to valve in the Unit 2 Isolation Condenser local water level sight glass per DOP 1300-05 and then report Isolation Condenser water level to the Control Room.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-j Page 5 of 8 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Provide the Examinee with the supplied copy of DOP 1300-05.

CUE:

IF examinee cannot find the sight glass drain valve and states the he/she would contact a supervisor, provide the report: what does the procedure state and/or trace the flowpath?

1.

Verify the sight glass drain valve is closed.

Petcock valve operator full CW.

CUE:

The component is in the condition you have described.

2.

Verify 2A-1341A, ISOL CDSR LVL INST ROOT VLV is open.

Hand wheel is full CCW.

CUE:

The component is in the condition you have described.

3.

Open 2-1301-39, ISOL CDSR SIGHT GLASS HI SIDE SV.

Rotate hand wheel full CCW.

CUE:

The component is in the condition you have described.

4.

Open 2-1301-40, ISOL CDSR SIGHT GLASS LO SIDE SV Rotate hand wheel full CCW.

CUE:

The component is in the condition you have described.

5.

Open 2-1301-633, ISOL CDSR SIGHT GLASS HI SIDE ROOT Rotate hand wheel full CCW.

Job Performance Measure (JPM)

S-N-j Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:

The component is in the condition you have described.

6.

Open 2-1301-634, ISOL CDSR SIGHT GLASS LO SIDE ROOT.

Rotate hand wheel full CCW.

CUE:

The component is in the condition you have described.

7.

Observe indicated level in the sight glass.

Observes indicated level in the sight glass.

CUE:

The sight glass is completely FULL.

8.

Report indicated sight glass level to the control room.

Informs Control Room local Isolation Condenser sightglass level is full or

> 67 inches.

CUE:

Repeat back sight glass level.

9.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-j Page 7 of 8 Operators Name:

Job

Title:

RO SRO JPM

Title:

ISO COND - VALVE IN LOCAL SIGHTGLASS Revision Number: 11 JPM Number: S-N-j Task Number and

Title:

207N008, Valve in Isolation Condenser Local Sight glass K/A Number and Importance: 207000.A3.01 3.5 / 3.7 Suggested Testing Environment: In-Plant Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 20 minutes Actual Time Used:

minutes

References:

DOP 1300-05, rev 06 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-j Page 8 of 8 INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 is controlling RPV pressure using the Isolation Condenser.
3. The Isolation Condenser water level indication in the Control Room is erratic and unreliable.

INITIATING CUE

1. The Unit Supervisor has directed you to valve in the Unit 2 Isolation Condenser local water level sight glass per DOP 1300-05 and then report Isolation Condenser water level to the Control Room.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure SERV WATER - REVERSE FLOW THROUGH X AREA COOLERS JPM Number: S-N-k Revision Number: 00 Date: 06/11 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-k Page 2 of 8 Revision Record (Summary)

Revision 00 Bank JPM

Job Performance Measure (JPM)

S-N-k Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1.

This is an in-plant JPM.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. Clean copy of DOP 3900-02.

Job Performance Measure (JPM)

S-N-k Page 4 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A review of the Operator logs indicate that X-area temperature and cooler differential pressure has been increasing.
3. The x-area coolers are in a normal configuration.

INITIATING CUE

1. The Unit 3 Unit Supervisor has directed you to reverse flow through U3 x-area cooler from normal to reverse, per DOP 3900-02, step G.2.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-k Page 5 of 8 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Provide Examinee the supplied copy of DOP 3900-02.

1.

Check X-area temperatures at back panel 903-21 on TR3-1631-01; Steam Leak Detection points 13-16.

Verifies temperature indications on the 903-21.

CUE:

The temperature indicated on TR3-1631-01; Stm Leak Detection points 13-16 are elevated slightly above normal.

2.

Check SW dP across X-Area Coolers by taking the difference between the following pressure indicators (at SW penetration through X-Area wall).

Checks the SW dP across the X-area.

CUE:

dP is slightly elevated above normal.

3.

Refer to Figure 1, SW to U3 X-Area Coolers.

Refers to Figure 1.

4.

Open the following valves (Located North of MCC 36-1):

  • 3-3999-325, U3 X AREA CLRS REVERSE FLOW VLV.
  • 3-3999-326, U3 X AREA CLRS REVERSE FLOW VLV.

Rotates manual valve hand wheel(s) Counter Clock Wise (CCW) until movement stops.

Job Performance Measure (JPM)

S-N-k Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:

Valve hand wheel(s) stops moving. The valve(s) is open.

5.

Close the following valves (North of MCC 36-1):

  • 3-3999-327, U3 X AREA CLRS NORM FLOW VLV.
  • 3-3999-328, U3 X AREA CLRS NORM FLOW VLV.

Rotates manual valve hand wheel(s) Clock Wise (CW) until movement stops.

CUE:

Valve hand wheel(s) stops moving. The valve(s) is open.

6.

Check flow reversal by checking SW dP across X-Area Coolers has reversed and X-area temperatures have dropped.

Verifies that SW dP across the X-area coolers has reversed and that X-area temperatures are dropping as indicated on the 903-21 panel.

CUE:

dP - The pressures indicate reversed flow.

Temp - Temperature is trending down. Another NSO will monitor the downward trend.

7.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-k Page 7 of 8 Operators Name:

Job

Title:

RO SRO JPM

Title:

Reverse Service Water Flow Through X-Area Coolers Revision Number: 00 JPM Number: S-N-k Task Number and

Title:

239N005: Perform a Unit 3 X-Area room cooler flow reversal operation.

K/A Number and Importance: Generic.1.30 4.4 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 minutes Actual Time Used:

minutes

References:

DOP 3900-02, rev 12 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

Job Performance Measure (JPM)

S-N-k Page 8 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A review of the Operator logs indicate that X-area temperature and cooler differential pressure has been increasing.
3. The x-area coolers are in a normal configuration.

INITIATING CUE

1. The Unit 3 Unit Supervisor has directed you to reverse flow through U3 x-area cooler from normal to reverse, per DOP 3900-02, step G.2.
2. Inform the Unit Supervisor when the task is complete.