Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13345B34831 December 2013Closeout of Generic Letter, 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4674 and MC4675)
ML13331A67331 December 2013GSI-191 Staff Summary for CloseoutmMission time
Tornado Missile
Safe Shutdown Earthquake
Coatings
Foreign Material Exclusion
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding WalkdownsUnanalyzed Condition
IR 05000413/201340413 December 2013IR 05000413-13-404 & 05000414-13-404 on 11/21/2013, Catawba Nuclear Station, US Nuclear Regulatory Commission Physical Security InspectionAffidavit
ML13346A25211 December 2013Notification of Licensed Operator Initial Examination - 05000413/14-301 and 05000414/14-301
ML14041A2952 December 2013Document No. 1457690303-R-M-00005-0, Revision 0, NTTF 2.3 Seismic Peer Review Supplementary Report, Catawba Nuclear Station Unit 2.Safe Shutdown
Unanalyzed Condition
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Seismic Walkdown Report
TAC:MF01062 December 2013
CNS-13-007, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns2 December 2013Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic WalkdownsSeismic Walkdown Report
ML13336A40726 November 2013301 Final Administrative DocumentsTime of Discovery
Shutdown Margin
Safe Shutdown Earthquake
Job Performance Measure
Earthquake
ML13336A42426 November 2013301 Final Administrative JPMsShutdown Margin
ML13336A39826 November 2013301 Draft SRO Written ExamSlow transfer
Earthquake
ML13336A39926 November 2013301 Draft Simulator ScenariosBoric Acid
Shutdown Margin
Post Accident Monitoring
Power change
Operational leakage
ML13336A40326 November 2013301 Draft Sim_IN-Plant JPMsBoric Acid
ML13336A42626 November 2013301 Post Exam Comments
ML13336A40426 November 2013301 Draft Administrative JPMsBoric Acid
ML13336A42126 November 2013301 Final Simulator ScenariosBoric Acid
Shutdown Margin
Post Accident Monitoring
Power change
Operational leakage
ML13336A42226 November 2013301 Final Sim_IN-Plant JPMsBoric Acid
ML13336A43826 November 2013301 General CorrespondenceJob Performance Measure
ML13336A39626 November 2013301 Draft RO Written ExaminationBoric Acid
Shutdown Margin
Reactor Vessel Water Level
Packing leak
Safe Shutdown Earthquake
Post Accident Monitoring
Earthquake
Downpower
Flow Induced Vibration
Overspeed trip
Manual Operator Action
Operational leakage
ML13336A39526 November 2013301 Draft Administrative DocumentsBoric Acid
CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology14 November 2013License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters MethodologyBoric Acid
Shutdown Margin
Fuel cladding
Coast down
Measurement Uncertainty Recapture
Affidavit
TAC:MF311914 November 2013
CNS-13-006, 10 CFR 21 Notification - Identification of Defect8 November 201310 CFR 21 Notification - Identification of DefectCommercial Grade
ML13312A9888 November 2013Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications
RA-13-1004, 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results6 November 201310 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing ResultsFitness for Duty
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13308A0071 November 2013Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection.
Press Release-II-13-061, NRC to Hold Meeting on Planned Modifications at Duke Energy Nuclear Power Plants29 October 2013Press Release-II-13-061: NRC to Hold Meeting on Planned Modifications at Duke Energy Nuclear Power PlantsEarthquake
ML13281A56228 October 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF1060 and MF1061)High Radiation Area
Safe Shutdown Earthquake
FLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
RA-13-1005, Capability to Perform Multi-Unit Dose Assessment, Supplement28 October 2013Capability to Perform Multi-Unit Dose Assessment, Supplement
IR 05000413/201300428 October 2013IR 05000413-13-004, 05000414-13-004; on 7/1/2013 - 9/30/2013; Catawba Nuclear Station, Units 1 and 2; Integrated InspectionSafe Shutdown
Boric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Process Control Program
Operability Determination
Maintenance Rule Program
Liquid penetrant
Power change
ML13233A18323 October 2013Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power PlantFukushima Dai-Ichi
Minimum staff
ML13295A30622 October 2013Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC
ML13296A00521 October 2013NRR E-mail Capture - Closeout for MF1777 Catawba 1 - Core Operating Limits Report for Cycle 21, Revision 0
ML13291A44218 October 2013TI-182 Phase 2 RFI
IR 05000413/20133018 October 2013NRC Operator License Examination Report 05000413/2013301 and 05000414/2013301
RA-13-020, Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask8 October 2013Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask
ML13303B5247 October 2013Duke Energy Carolinas, LLC - Quality Assurance Program Topical Report Amendment 40Fitness for Duty
Offsite Dose Calculation Manual
Nondestructive Examination
Process Control Program
Commercial Grade
Fatigue Rule
Fire Protection Program
ML13284A0843 October 2013Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302
ML13290A1292 October 2013Post Examination Documentation
ML13275A0761 October 2013Initial Exam 2013-301 Final SRO Written ExamPacking leak
Post Accident Monitoring
Earthquake
Downpower
Flow Induced Vibration
Overspeed trip
Manual Operator Action
Operational leakage
ML13275A0681 October 2013Initial Exam 2013-301 Final RO Written ExamPacking leak
Post Accident Monitoring
Downpower
Flow Induced Vibration
Overspeed trip
Manual Operator Action
Operational leakage
ML13268A44926 September 2013Response to Request for Additional Information Regarding Core Operating Limits Report for Cycle 21Shutdown Margin
ML13276A50325 September 2013License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating PlantsSafe Shutdown
Fire Protection Program
ML13276A50425 September 2013Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 1 of 2
ML13276A50525 September 2013Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 of 2Hot Short
Safe Shutdown
Boric Acid
High winds
Mission time
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
B.5.b
Earthquake
Pressure Boundary Leakage
Fire Protection Program
Unidentified leakage
Affidavit
Manual Operator Action
Operational leakage
ML13269A07723 September 2013Submittal of Technical Specification Bases ChangesSafe Shutdown
Surveillance Frequency Control Program
Fire Protection Program
ML13263A37318 September 2013Technical Specification Bases ChangesSafe Shutdown
Anticipated operational occurrence
Qualified Offsite Circuit
Surveillance Frequency Control Program
Offsite Circuit
Overspeed trip
ML13312A91911 September 2013Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for Central and EasternSafe Shutdown Earthquake
Fukushima Dai-Ichi
ML13260A42311 September 2013Written Examination Approval Letter 05000413-13-301 and 05000414-13-301