Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13345B348 | 31 December 2013 | Closeout of Generic Letter, 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4674 and MC4675) | |
ML13331A673 | 31 December 2013 | GSI-191 Staff Summary for Closeoutm | Mission time Tornado Missile Safe Shutdown Earthquake Coatings Foreign Material Exclusion |
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns | Unanalyzed Condition |
IR 05000413/2013404 | 13 December 2013 | IR 05000413-13-404 & 05000414-13-404 on 11/21/2013, Catawba Nuclear Station, US Nuclear Regulatory Commission Physical Security Inspection | Affidavit |
ML13346A252 | 11 December 2013 | Notification of Licensed Operator Initial Examination - 05000413/14-301 and 05000414/14-301 | |
ML14041A295 | 2 December 2013 | Document No. 1457690303-R-M-00005-0, Revision 0, NTTF 2.3 Seismic Peer Review Supplementary Report, Catawba Nuclear Station Unit 2. | Safe Shutdown Unanalyzed Condition Probabilistic Risk Assessment Fukushima Dai-Ichi Seismic Walkdown Report |
TAC:MF0106 | 2 December 2013 | ||
CNS-13-007, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 2 December 2013 | Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | Seismic Walkdown Report |
ML13336A407 | 26 November 2013 | 301 Final Administrative Documents | Time of Discovery Shutdown Margin Safe Shutdown Earthquake Job Performance Measure Earthquake |
ML13336A424 | 26 November 2013 | 301 Final Administrative JPMs | Shutdown Margin |
ML13336A398 | 26 November 2013 | 301 Draft SRO Written Exam | Slow transfer Earthquake |
ML13336A399 | 26 November 2013 | 301 Draft Simulator Scenarios | Boric Acid Shutdown Margin Post Accident Monitoring Power change Operational leakage |
ML13336A403 | 26 November 2013 | 301 Draft Sim_IN-Plant JPMs | Boric Acid |
ML13336A426 | 26 November 2013 | 301 Post Exam Comments | |
ML13336A404 | 26 November 2013 | 301 Draft Administrative JPMs | Boric Acid |
ML13336A421 | 26 November 2013 | 301 Final Simulator Scenarios | Boric Acid Shutdown Margin Post Accident Monitoring Power change Operational leakage |
ML13336A422 | 26 November 2013 | 301 Final Sim_IN-Plant JPMs | Boric Acid |
ML13336A438 | 26 November 2013 | 301 General Correspondence | Job Performance Measure |
ML13336A396 | 26 November 2013 | 301 Draft RO Written Examination | Boric Acid Shutdown Margin Reactor Vessel Water Level Packing leak Safe Shutdown Earthquake Post Accident Monitoring Earthquake Downpower Flow Induced Vibration Overspeed trip Manual Operator Action Operational leakage |
ML13336A395 | 26 November 2013 | 301 Draft Administrative Documents | Boric Acid |
CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology | 14 November 2013 | License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology | Boric Acid Shutdown Margin Fuel cladding Coast down Measurement Uncertainty Recapture Affidavit |
TAC:MF3119 | 14 November 2013 | ||
CNS-13-006, 10 CFR 21 Notification - Identification of Defect | 8 November 2013 | 10 CFR 21 Notification - Identification of Defect | Commercial Grade |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
RA-13-1004, 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results | 6 November 2013 | 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results | Fitness for Duty |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13308A007 | 1 November 2013 | Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. | |
Press Release-II-13-061, NRC to Hold Meeting on Planned Modifications at Duke Energy Nuclear Power Plants | 29 October 2013 | Press Release-II-13-061: NRC to Hold Meeting on Planned Modifications at Duke Energy Nuclear Power Plants | Earthquake |
ML13281A562 | 28 October 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF1060 and MF1061) | High Radiation Area Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation Fire Protection Program |
RA-13-1005, Capability to Perform Multi-Unit Dose Assessment, Supplement | 28 October 2013 | Capability to Perform Multi-Unit Dose Assessment, Supplement | |
IR 05000413/2013004 | 28 October 2013 | IR 05000413-13-004, 05000414-13-004; on 7/1/2013 - 9/30/2013; Catawba Nuclear Station, Units 1 and 2; Integrated Inspection | Safe Shutdown Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Locked High Radiation Area Significance Determination Process Job Performance Measure Process Control Program Operability Determination Maintenance Rule Program Liquid penetrant Power change |
ML13233A183 | 23 October 2013 | Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant | Fukushima Dai-Ichi Minimum staff |
ML13295A306 | 22 October 2013 | Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC | |
ML13296A005 | 21 October 2013 | NRR E-mail Capture - Closeout for MF1777 Catawba 1 - Core Operating Limits Report for Cycle 21, Revision 0 | |
ML13291A442 | 18 October 2013 | TI-182 Phase 2 RFI | |
IR 05000413/2013301 | 8 October 2013 | NRC Operator License Examination Report 05000413/2013301 and 05000414/2013301 | |
RA-13-020, Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask | 8 October 2013 | Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask | |
ML13303B524 | 7 October 2013 | Duke Energy Carolinas, LLC - Quality Assurance Program Topical Report Amendment 40 | Fitness for Duty Offsite Dose Calculation Manual Nondestructive Examination Process Control Program Commercial Grade Fatigue Rule Fire Protection Program |
ML13284A084 | 3 October 2013 | Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302 | |
ML13290A129 | 2 October 2013 | Post Examination Documentation | |
ML13275A076 | 1 October 2013 | Initial Exam 2013-301 Final SRO Written Exam | Packing leak Post Accident Monitoring Earthquake Downpower Flow Induced Vibration Overspeed trip Manual Operator Action Operational leakage |
ML13275A068 | 1 October 2013 | Initial Exam 2013-301 Final RO Written Exam | Packing leak Post Accident Monitoring Downpower Flow Induced Vibration Overspeed trip Manual Operator Action Operational leakage |
ML13268A449 | 26 September 2013 | Response to Request for Additional Information Regarding Core Operating Limits Report for Cycle 21 | Shutdown Margin |
ML13276A503 | 25 September 2013 | License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants | Safe Shutdown Fire Protection Program |
ML13276A504 | 25 September 2013 | Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 1 of 2 | |
ML13276A505 | 25 September 2013 | Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 of 2 | Hot Short Safe Shutdown Boric Acid High winds Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation B.5.b Earthquake Pressure Boundary Leakage Fire Protection Program Unidentified leakage Affidavit Manual Operator Action Operational leakage |
ML13269A077 | 23 September 2013 | Submittal of Technical Specification Bases Changes | Safe Shutdown Surveillance Frequency Control Program Fire Protection Program |
ML13263A373 | 18 September 2013 | Technical Specification Bases Changes | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Surveillance Frequency Control Program Offsite Circuit Overspeed trip |
ML13312A919 | 11 September 2013 | Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for Central and Eastern | Safe Shutdown Earthquake Fukushima Dai-Ichi |
ML13260A423 | 11 September 2013 | Written Examination Approval Letter 05000413-13-301 and 05000414-13-301 |