CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question I Given the following Unit I initial conditions:

The Unit is at 58% power.

Turbine bearing #8 vibration began to rise rapidly.

With bearing #8 vibration at 16 mils and continuing to rise, the operator attempted to manually trip the turbine by depressing the Turbine Trip pushbutton.

Current Conditions:

All turbine stop and control valves are OPEN.

lAD-i, B17 (Manual Turb Trip C/R) is DARK.

The crew is performing the Immediate Actions of AP/1/N5500/002, (Turbine Generator Trip).

In accordance with AP/02, the operator will attempt to CLOSE the turbine control valves at a rate of 100% over a period of (1)

If that action is NOT successful, the NEXT required action is to (2)

A.

(1) 3 minutes (2) trip the reactor B.

(1) 3 minutes (2) close all MSIVs and bypass valves C.

(1) 45 seconds (2) trip the reactor D.

(1) 45 seconds (2) close all MSIVs and bypass valves Pagelof76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 2 Given the following Unit I conditions:

Initial The crew is recovering from a faulted Steam Generator outside containment, upstream of the MSIVs.

SI has been terminated.

The crew is maintaining the plant in a stable condition per EPI1IAI5000IES-1.1 (SI Termination).

PZR pressure is 2185 psig and stable.

PZR level is 50% and stable.

Current NC pressure starts to decrease rapidly due to a significant leak on one of the PZR safety valves.

PRT pressure is 20 psig.

PZR level is 17%.

NC subcooling is negative 5°F.

Based on the event in progress:

(1)

Safety Injection re-initiation be required.

(2)

PZR Safety valve tailpipe temperature will be indicating A.

(1) wilINOT (2) 315°F B.

(1) will (2) 315°F C.

(I) will NOT (2) 260°F D.

(1) will (2) 260° F Page 2of76 Catawba 2013 NRC Initial License Exam

- Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 3 Given the following:

A small-break LOCA has occurred.

EP/1/N5000/E-1 (Loss of Reactor or Secondary Coolant) has been entered.

Neither train of ICCM is available.

Total CA Flow is 600 gpm and stable.

Core Exit T/Cs on OAC indicate 545°F.

All Hot Leg temperatures are 530°F.

All Cold Leg temperatures are 515°F.

NC B Loop W/R pressure is stable at 1000 psig.

Pressurizer level is 33% and stable.

(1)

In accordance with E-1, the value of subcooling is (1)

(2)

S/I termination criteria (2) met.

Which ONE of the following completes the above statements?

Reference Provided A.

(1) 0°F (2)

ARE B.

(1) 0°F (2) are NOT C.

(1)

+15°F (2)

ARE D.

(1)

-15°F (2) are NOT Page3of76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 4 During a Large Break LOCA, the operator notes the following trend (from Time 1 to Time 6) indication on Train A and Train B of ICCM subcooling margin monitor:

Time 1:

15°F Time 2:

0°F Time 3:

minus 5°F Time 4:

minus 35°F Time 5:

minus 35°F Time 6:

minus 35°F (1)

Subcooling margin indications are based on the average of loop wide range hot leg temperatures and the average of the (2)

What is the significance of the subcooling margin monitor indications for Times 4, 5, and 6?

A.

(1) 5highestCETs (2)

Subcooling margin monitor indication is at the bottom of its scale.

B.

(1) 5highestCETs (2)

Unit conditions have stabilized.

C.

(1) 40 ACC qualified CETs (2)

Subcooling margin monitor indication is at the bottom of its scale.

D.

(1) 40 ACC qualified GETs (2)

Unit conditions have stabilized.

Page4of76 Catawba 2013 NRC Initial License Exam - Reactor Operator

Question 5 CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR During a small break LOCA the following NCP vibration data are received for ID NCP:

Which ONE of the following is the earliest time at which the NCP trip criteria was MET, in accordance with annunciator response procedures?

A.

2100 B.

2105 C.

2110 D.

2115 Page5of76 Catawba 2013 NRC Initial License Exam - Reactor Operator Time 2100 2105 2110 2115 Shaft Vibration (mils)

Frame Vibration (mils) 5 2

12 4

19 6

22 8

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 6 Given the following Unit 1 conditions:

The Unit is at 100% power.

Pressurizer level is currently 50% and slowly decreasing.

1 NV-294 (NV Pumps Disch Flow Controller) valve demand signal indicates 100%.

I NV-309 (NCP Seal Injection Control Valve) is in auto.

(1)

Assuming NO operator action, which ONE of the following describes the cause of this transient?

(2)

Seal Injection providing cooling to the NCP seals.

A.

(1)

Tave input to the Pressurizer Level Control System has failed LOW.

(2)

Is NOT B.

(1)

Total Sealwater Flow Transmitter output has gradually failed LOW.

(2)

Is C.

(1)

Tave input to the Pressurizer Level Control System has failed LOW.

(2)

Is D.

(1)

Total Sealwater Flow Transmitter output has gradually failed LOW.

(2)

Is NOT Page 6 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 7 Given the following Unit I conditions:

The Unit has entered a refueling outage and is in Mode 5.

1A Train ND is OPERABLE and secured.

1 B Train ND is in service.

NC temperature is 110°F.

All SIG NR levels are 10%.

NC system drain procedure is in progress.

NC Wide Range level is 22%.

Subsequently:

ND Pump lB TRIPS.

In accordance with Technical Specifications, the Required Action is to immediately 2

Which ONE of the following completes the above statement?

A.

Suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM.

B.

Initiate action to restore required S/G secondary side water levels to within limits.

C.

Close all containment penetrations providing direct access from containment atmosphere to outside atmosphere.

D.

Initiate action to establish > 23 ft. of water above the top of reactor vessel flange.

Page 7of76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 8 Given the following Unit I conditions:

A LOCA inside containment is occurring.

Containment pressure peaked at 3.2 psig.

FWST level decreased to 30%.

(1)

The non-essential KC headers are automatically isolated by the (1) signal.

(2)

This isolation prevents KC pump runout due to the (2) valves receiving an OPEN signal.

Which ONE of the following completes the above statements?

A.

(1)

Safety Injection (2)

NDHX Inlet (IKC-56A181B)

B.

(1)

Phase B (2)

NDHX Inlet (1 KC-56A/81 B)

C.

(1)

Safety Injection (2)

NDHX Outlet (1 KC-57A182B)

D.

(1)

Phase B

  • (2)

NDHX Outlet (1 KC-57A/82B)

Page 8 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 9 Given the following Unit I conditions:

Initial:

The Unit was at 100% power.

A turbine trip occurred.

The reactor did NOT trip and could NOT be tripped from the Control Room.

Current:

Pressurizer pressure is 2350 psig.

The crew has transitioned to EP/1/A15000/FR-S.1 (Response to Nuclear Power Generation/ATWS).

The crew is initiating emergency boration in accordance with Step 4 of FR-S.1.

(1)

A minimum emergency boration flowrate of gpm is required to avoid swapping NV pump suction to the FWST.

(2)

Pzr PORV operation be required to enhance emergency boration flow.

Which ONE of the following completes the above statements, in accordance with FR-S. 1?

A.

(1) 30 (2)

Will NOT B.

(1) 60 (2)

Will NOT C.

(1) 30 (2)

Will D.

(1) 60 (2)

Will Page9of76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 10 A Unit shutdown is in progress for a refueling outage with the following conditions:

Pressurizer pressure is 1800 psig.

Steam line pressure is 750 psig.

Subsequently:

A large steam break occurs upstream of B MSIV and outside containment.

B steam generator completely depressurizes.

(Assume NO manual action is taken after the steam break occurs.)

Based on the above information:

(1) Safety Injection automatically occur.

(2) Main Steam Isolation automatically occurred due to ONLY.

A.

(1) did NOT (2)

HIGH negative rate of B steam line pressure B.

(1) did NOT (2)

LOW B steam line pressure C.

(1) did (2)

HIGH negative rate of B steam line pressure D.

(1) did (2)

LOW B steam line pressure Page 10 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 11 Given the following Unit 1 conditions:

The Unit was at 6% power during a post refueling startup with 1A CFPT in service.

Subsequently:

The following events occur at the listed times:

1000 An NC system leak develops.

PZR pressure is 2220 psig and decreasing at 2 psig/min.

PZR level is 26% and decreasing at 0.3%/minute 1003 1A CFPT trips due to low oil pressure.

1005 1C NCP trips on underfrequency.

1008 Containment pressure reaches 1.2 psig.

Which ONE of the following is the EARLIEST time at which the reactor will be tripped based on a setpoint or manual action taken by procedures?

A.

1000 B.

1003 C.

1005 D.

1008 Page 11 of76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 12 Given the following Unit 1 conditions:

The Unit tripped due to a complete loss of offsite power.

The crew completed the Immediate Actions of EPIIIAJ5000IE-O (Reactor Trip or Safety Injection).

The crew transitioned to EPII/A/5000IES-O.1 (Reactor Trip Response), and is at Step 2 RNO of ES-O.1, which requires the MSIVs to be closed due to the loss of 6.9KV power.

The backup diesel VI compressor has been placed in service.

(1)

The purpose of closing the MSIVs is to (2)

Following completion of this step, automatic S/G PORV operation be available.

Which ONE of the following completes the above statements?

A.

(1) maintain SIG inventory (2) will NOT B.

(1) minimize cooldown (2) will NOT C.

(1) maintain S/G inventory (2) will D.

(1) minimize cooldown (2) will Page 12 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 13 During the performance of AP101A155001020, (Loss of Nuclear Service Water), Case I, Loss of RN Train, Step 8, the operator is directed to verify that each operating RN pump has the required minimum flow.

If this required minimum flow is NOT met, then a certain amount of flow will be directed through the (1)

, not to exceed (2) in order to avoid flow induced vibration problems.

Which ONE of the following completes the above statement?

A.

(1)

KCHx (2) 4650 gpm B.

(1)

NSHx (2) 4650 gpm C.

(1)

KCHx (2) 2550 gpm D.

(1)

NSHx (2) 2550 gpm Page 13 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 14 Given the following plant conditions:

Both Units are at 100% power.

A seismic event has occurred.

The crew is performing actions of AP/0/N5500/022 (Loss of Instrument Air).

All available Instrument Air Compressors are running and loaded.

Instrument Air pressure continues to DECREASE.

In accordance with AP122:

(1)

What is the LOWEST Instrument Air pressure at which the CRS is required to direct a reactor trip?

(2)

Loss of Normal Feedwater supply the reason for the manual reactor trip.

A.

(1)

S5 psig (2) is B.

(1) 60psig (2) is not C.

(1) 55psig (2) is not D.

(1) 6opsig (2) is Page 14 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 15 Note the step below from AP/1/A/5500/037 (Generator Voltage and Electric Grid Disturbances):

Select MANUAL on turbine control panel.

(1)

The above direction is given ONLY in (2)

The basis for this step is to ensure reactor power is maintained less than a maximum of Which ONE of the following completes the above statement?

A.

(1)

Case I (Abnormal Generator or Grid Voltage)

(2) 69%

B.

(1)

Case I (Abnormal Generator or Grid Voltage)

(2) 100%

C.

(1)

Case II (Abnormal Generator or Grid Frecuency)

(2) 69%

D.

(1)

Case II (Abnormal Generator or Grid Frequency)

(2) 100%

Page 15 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 16 Given the following Unit I initial conditions:

The Unit was at 100% power.

Subseauently:

At 0200:

The reactor tripped due to a LOCA outside containment.

At 0210:

The crew entered EPI1IAI5000/ECA-1.2, (LOCA Outside Containment).

At 0220:

The crew entered EP/1/A/5000/ECA-1.1, (Loss of Emergency Coolant Recirc).

At 0240:

The crew is at the step in ECA-1.1 for determining NC subcooling.

Current Conditions:

NCS pressure is 1100 psig.

lB NC pump is running.

1A, 1C, and 1D NC pumps have been secured.

Reactor Vessel D/P is 20%.

1A NI pump is running with flow indicated at 320 gpm.

1A NV pump is running with flow indicated at 415 gpm.

Both ND pumps are OFF.

No NS pumps are running.

Subcooling is 35°F.

(1)

What is the minimum required injection flowrate?

(2)

Which, if any, pump can be secured?

Reference Provided A.

(1) 380 gpm (2)

NEITHER pump B.

(1) 380 gpm (2)

IA NI pump ONLY C.

(1) 408 gpm (2)

IA NI pump ONLY D.

(1) 408 gpm (2)

NEITHER pump Page 16 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR The Unit was at 100% power.

Subsequently:

A medium break LOCA occurred inside containment.

Containment pressure peaked at 2.7 psig and is slowly decreasing.

The crew has implemented EP/2/N5000/FR-H.1 (Response to Loss of Secondary Heat Sink).

All attempts to restore flow to the S/Gs from the CA system have NOT been successful.

In accordance with FR-H.1:

(1)

The next prioritized source of feedwater for restoration of flow to the SIGs is through the CM/CF system by operating a (1)

(2)

The crew is FIRST required to establish bleed and feed when W/R level in at least 3 S/Gs decreases to less than (2)

A.

(1) main feedwater pump (2) 24%

B.

(1)

(2)

C.

(1) hotwell and booster pump ONLY (2) 24%

D.

(I) hotwell and booster pump ONLY (2) 36%

Page 17 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator Question 17 Given the following Unit 2 conditions:

Initial:

main feedwater pump 36%

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 18 Given the following Unit I conditions:

An NC system LOCA occurred on Unit 1.

INI-184B and INI-185A (Containment Sump Isolation Valves) are CLOSED and CANNOT be opened.

EPI1!AI5000IECA-1.1 (Loss of Emergency Coolant Recirculation) was entered.

All NC pumps are OFF.

Minimum ECCS flow to remove decay heat has been established.

In accordance with ECA-1.1, the operator will increase NCS make-up flow if...

A.

Hot leg Wide Range (WR) temperatures increase by 5°F.

B.

Pressurizer level is 2% and decreasing.

C.

RVLIS Lower Range (LR) is 64% and stable.

D.

Core Exit Thermocouples are 650°F and increasing.

Page 18 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 19 Given the following Unit I conditions:

AP/1/A/5500/015 (Rod Control Malfunction) is entered due to continuous rod movement.

Rods have been placed in manual.

Initial group demand was 85 steps withdrawn on Control Bank D.

Final group demand was 101 steps withdrawn on Control Bank D.

Subsequently:

Rod D-4 DRPI experiences a Data A Failure.

(All rods are at the same actual height and in Control Bank D.)

Rod D-4 indicates steps withdrawn on DRPI.

Which ONE of the following completes the above statement?

A.

108 B.

102 C.96 D.90 Page 19 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 20 Given the following Unit I conditions:

For a planned refueling outage, the Unit entered Mode 3 at 2120 on 08/12/2013.

Current Conditions:

The Unit is in Mode 6.

NC boron concentration is 2580 ppm.

At 1915 on 08/15/2013, a fuel bundle has been placed in the upenderfortransportto Spent Fuel Pool storage.

Based on the above conditions:

(1)

SLC 16.9-17 (Refueling Operations - Decay Time) required to be entered.

(2)

Tech Spec 3.9.1 (Boron Concentration) required to be entered.

A.

(1)is (2) is B.

(1) is (2) is not C.

(1) is not (2) is D.

(1) is not (2) is not Page 20 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 21 Given the following Unit 1 conditions:

Unit 1 is at 100% power.

1A S/G has developed a 200 GPD tube leak.

I EMF-33 (CSAE Discharge) Trip 2 light is LIT.

The following annunciator is alarming:

IRAD-1, B/i, IEMF-33 CSAE EXHAUST HI RAD uNh VENT VA UNIT 1

CSAE EXH For the above conditions, and PRIOR TO any operator action, which ONE of the following describes whether the as-found configuration of the control switch and indication in the photo above is CORRECT and why or why not?

A.

INCORRECT configuration. The VA light should be LIT due to automatic swapover caused by 1 EMF-33 reaching its Trip 2 setpoint.

B.

INCORRECT configuration. The switch should have already been in AUTO, to enable CSAE exhaust automatic swapover to Aux. Bldg. (VA) filtered exhaust immediately upon 1EMF-33 reaching its Trip 2 setpoint.

C.

CORRECT configuration. Swapover of the CSAE exhaust to Aux. Bldg. (VA) filtered exhaust will ONLY occur when the operator OPENS 1ABF-D-1 I and IABF-D-4.

D.

CORRECT configuration. Swapover of the CSAE exhaust to Aux. Bldg. (VA) filtered exhaust will ONLY occur when the operator takes the switch to the AUTO position.

Page 21 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 22 In order to prevent condenser overpressurizaton upon a loss of vacuum, steam dump operation will be prevented by the C-9 permissive based on lowering vacuum sensed by at least (1) condenser pressure sensor(s) OR loss of cooling water supply based on (2)

Which ONE of the following completes the above statement?

A.

(1) 2 (2)

RC Pump breaker position B.

(1) 1 (2)

RC Pump breaker position C.

(1) 2 (2)

RC system flowrate D.

(1) 1 (2)

RC system flowrate Page 22 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 23 Given the following LWR (Liquid Waste Release) Permit Report excerpt for a planned release of Recycle Monitor Tank A:

See Attached Liquid Waste Release Permit Report excerpt (1 page)

(1)

In accordance with SLC 16.11-2, (Radioactive Liquid Effluent Monitoring Instrumentation),

which item on the provided LWR excerpt will require that additional sampling be performed prior to the release?

(2)

If the concentration of radioactive material released to unrestricted areas exceeds the limits specified on the Liquid Waste Discharge Permit Report and in SLC 16.11-1 (Liquid Effluents), the concentration must be restored to within limits discovery.

Which ONE of the following completes the above statements?

A.

(1)

Setpoint Data (2) within one hour of B.

(1)

Setpoint Data (2) immediately upon C.

(1)

RL Pump Data (2) immediately upon D.

(1)

RL Pump Data (2) within one hour of Page 23 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

Ca, 1,

Cu 0

Cl)

.0<

w CuxQ 00 zo CE)<

C,z C)

£4

[

zi II INN l10 a

II 100 uz ZZZZ I

II 1+4 I.

II II ICajIaJ It I

10 Ir0 11 a

I 110 IVI0 I

II I.

Ii-I--

I II V

I1.

1INI I

a

  • a II II II II a

a a..

It-II-(I-IT I

II II a

It a

a-a..

11 II a.

a.-

a i

a..

I.

II I*.

I a

a a.

I I

I

II I

I a

i.

a

a.

p p..

a I..

a C

a a.

a p

a i

a a

i II II a

a a

a.

a I..

I.-

II a

p.

a a

a II X

a**

a--

a u

a I*

ii.

a ii a.

11 01.

a ii a.-

ii-.

a a

a.-

a a

Ii 4jf it a

ii a

I bI a

ii..

u.

a a

II a.

ii-ii..

(a U

1 11--

114 U1.

a ii..

It a

rjj a-ii-.

)

.J a

II a

II4 a

a-ii

(

it a-a ii

  • E a

114)

UG.

I--

Z aat I-.Li a

0 r2aj a.

a a

1.

u.

u a

a II.4 a

al iI 111 a)

J It Z

1114

-D.

Q 0

I 4.1.

I

-U It

.10 IC U

.fl

.a

.1 1.

C p

  • . C.

U 11 4

4)Q 0

UC U

4

Ø f.

..4 1

444 tflI14

-i *c 0-a 0a-41.I 0

  • .4.4 as zt T-a.

>ZCC a4,C La Z

U

  • .lOQ. -

4 ca w

.-a zV41.I OU XU OI b

U41 C.l CrIU C.

Wa1 UI-t U_mcI I..

CI

..C LatC

.T..1.4 f--Ir4 D.OC-44 u,OaCa IC-aC C.

00 U

.-.0C.a a

liau

  • i.t,.

C.*.t*.4 a.

lilU a:

aa1.1.

ao 1

iC ILaJW UWf4l4 ILiJ A0 a.0 V

a-I Ut 0%0 N-a0 I

0 (C

I-00.0 4-0 4-C)

(U0r E

(a

(.0 X

  • - 0 Cu, cU.

C C) 2 Ca) 0 c.1 CC

.0 CU

.4 CU C) 4)

  • Q 14 a4 0

44.1 14 4

U

.4)

C.

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 24 Which ONE of the following describes an action, including the reason for the action, in accordance with EP/1/A/5000/FR-Z.1 (Response to High Containment Pressure)?

A.

Initiate ONE train of ND Auxiliary Spray, if containment pressure exceeds 5 psig 50 minutes following Rx Trip, in order to reduce the challenge to containment integrity due to high pressure.

B.

Isolate faulted steam generators in order to reduce the challenge to containment integrity due to high pressure.

C. Secure ND Auxiliary Spray when containment pressure decreases below 3 psig in order to reduce the challenge to containment integrity due to low pressure.

D.

Initiate BOTH trains of ND Auxiliary Spray, if containment pressure exceeds 15 psig 60 minutes following Rx Trip, in order to reduce the challenge to containment integrity due to high pressure.

Page 25 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 25 Given the following Unit 1 initial conditions:

The Unit is at 100% power.

Subsequently:

A small break LOCA occurs.

The crew is performing EPII/A/5000/ES-l.2 (Post LOCA Cooldown and Depressurization).

All NC pumps are secured.

(1)

What is the maximum NC system cooldown rate specified in this procedure?

(2)

Which method is the first choice for the NC system depressurization for the given conditions?

A.

(1) 100°F/hr (2)

NV auxiliary spray B.

(1)

Maximum achievable rate (2)

NV auxiliary spray C.

(1) 100°F/hr (2)

NC PORV D.

(1)

Maximum achievable rate (2)

NC PORV Page 26 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 26 Given the following:

Unit I has experienced a small break LOCA.

The crew has completed applicable steps of EPIIIAI5000/E-0 (Reactor Trip or Safety Injection) and entered EPIIIAI5000IE-I (Loss of Reactor or Secondary Coolant).

1 B NCP has been secured due to #1 seal failure.

Subsequently:

IA, IC, & ID NCPs are in service.

Core Exit Thermocouples: 706°F and slowly increasing.

RVLIS Level: 60% and slowly decreasing.

IC NCP Motor Stator Temp: 315°F and slowly increasing.

Subcooling: -5°F.

The crew has transitioned to FR-C.2, (Response to Degraded Core Cooling).

How will the crew address immediate operation of the NCPs (trip vs. leave running), in accordance with FR-C.2?

IANCP ICNCP IDNCP A.

leave running trip leave running B.

leave running trip trip C.

trip trip trip D.

leave running leave running leave running Page 27 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 27 During a large break LOCA, the following conditions are given:

The ECCS suctions have been swapped to the Cold Leg Recirculation alignment.

NS suction has been swapped to the containment sump.

1A NS is in service.

FWSTIevel=4%.

Containment Sump level is off scale high.

Containment pressure = 7 psig and slowly decreasing.

CETs 560°F.

RVLIS Level is 57% and slowly decreasing.

PZR level is 0%.

NC Subcooling is -5°F.

Which ONE of the following describes:

(1)

The implications of the above conditions.

(2)

Which procedure entry conditions are met?

A.

(1)

Containment sump level is higher than would be expected for a Large Break LOCA.

(2)

EPIIIN5000IFR-C.2 (Response to Degraded Core Cooling)

B.

(1)

The level of water in the core region has been reduced such that the core has become uncovered.

(2)

EP/1/A/5000/FR-C.2 (Response to Degraded Core Cooling)

C.

(1)

Containment sump level is higher than would be expected for a Large Break -LOCA.

(2)

EP/IIN5000IFR-Z.2 (Response to Containment Flooding)

D.

(1)

The level of water in the core region has been reduced such that the core has become uncovered.

(2)

EPIIIAI5000!FR-Z.2 (Response to Containment Flooding)

Page 28 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

Question 28 Given the following:

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR TIME

]

NC Tcold Temperatures S!G Water Temperatures 0600 202°F 273°F 0700 205°F 264°F 0800 209°F 255°F 0900 212°F 246°F What is the EARLIEST time at which an NCP may be started, in accordance with Tech. Spec.

3.4.6, (RCS Loops

- Mode 4)?

A.

0600 B.

0700 C.

0800 D.

0900 Page 29 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 29 Given the following Unit I conditions:

The Unit is at 100% power.

NV makeup controls were last adjusted three (3) days ago.

The CRS directs setpoints to be updated per OP/1/A/61 50/009, Enclosure 4.1 (Automatic Makeup).

Given the current sample results:

NC Boron = 600 ppm RMWST Boron = 35 ppm FWST Boron = 2900 ppm BAT Boron = 7500 ppm (1).1 will require changing INV-238A (B/A Xfer Pmp to BlenderCtrl) setpoint to (2)

Upon decreasing VCT level, an automatic makeup will begin at A.

(1) 7.2 (2) 32.7 B.

(1) 7.2 (2) 35 C.

(1) 8.0 (2) 32.7 D.

(1) 8.0 (2) 35 Page 30 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 30 Given the following:

Unit 1 is in Mode 5.

The reactor coolant system is water solid.

IA ND is in service. lB ND is secured.

lB NV pump is in service.

1 NV-294 (NV Pumps Disch Flow Controller) is being controlled manually.

1 NV-309 is in automatic.

All plant parameters are stable.

Subsequently:

IKC-56A (KC to ND Hx 1A Sup Isol) closes due to controller malfunction.

Operators are taking action to stabilize NC system pressure while lB ND is placed in service.

Letdown flow is maintained constant in order to maximize system cleanup.

In response to this event (and prior to placing I B ND in service):

(1) lBNVpumpmotorampswillbe (2) 1NV-309 (NCP Seal Injection Control Valve) will throttle A.

(1) lower (2) open B.

(1) lower (2) closed C.

(1) higher (2) open D.

(1) higher (2) closed Page 31 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 31 Given the following Unit I conditions:

The Unit is in Mode 5 following core reload.

IA ND Pump is operating.

ND system flow is 3100 gpm.

NC system level is at 6.7%.

Subsequently:

NC system level remains stable at 6.7%.

Core Exit T/Cs are stable at 115°F.

IA ND pump flow and discharge pressure begin to oscillate.

In accordance with AP/1/A15500/019 (Loss of Residual Heat Removal System), Case IV, Loss of ND in Mid Loop, the operator is first required to initiate containment evacuation, containment closure, and then to A.

manually trip 1A ND pump.

B.

place lB ND train in service.

C.

attempt to mitigate IA ND pump conditions by raising NC level to greater than 25%.

D.

attempt to mitigate IA ND pump conditions by reducing ND flow to less than 1000 gpm.

Page 32 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 32 Given the following plant conditions:

Initial:

Unit I is at 100% power.

Unit2isinMode6.

lB NV pump is running.

1A NV pump is OFF.

Subsequently:

KC cooling flow to the Unit I NV pumps is lost.

The crew enters AP/1/A/5500/021, (Loss of Component Cooling) and has dispatched an operator to align backup cooling to an NV pump.

The crew is performing Enclosure 5, Maximize NV Pump Run Time.

(1)

The crew dispatched the operator to align alternate cooling to (1)

NV pump(s).

(2)

While the alternate cooling alignment is being performed, the operating pump will be (2)

A.

(1)

ONLY IA (2)

Secured immediately.

B. (I)

ONLY IA (2)

Operated for a maximum of 10 minutes.

C.

(1)

IAandlB (2)

Secured immediately.

D.

(1) lAandlB (2)

Operated for a maximum of 10 minutes.

Page 33 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 33 I NC-54A (Nitrogen to PRT Containment Isolation)

(I) receive an automatic isolation signal if containment pressure exceeds 1.2 psig.

I NC-I 07 (PRT to NCDT Pumps Suction)

(2) receive an automatic isolation signal if PRT pressure exceeds 8.0 psig.

A.

(1) does (2) does B.

(I) does (2) does not C.

(I) does not (2) does D.

(1) does not (2) does not Page 34 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 34 Given the following Unit 2 initial conditions:

The Unit was at 100% power when the reactor was manually tripped due to a partially stuck open PZR Safety Valve.

Subsequently:

At 1005:

Containment pressure is NEGATIVE 0.2 psig.

At 1010:

PRT pressure rises to approximately 50 psig and then rapidly decreases.

(1)

At time 1005, Tech Spec. 3.6.4 (Containment Pressure) met.

(2)

At time 1010, the PRT rupture disc(s) operated A.

(1) is NOT (2) as designed B.

(1) is NOT (2) earlier than designed C.

(1) is (2) as designed D.

(1) is (2) earlier than designed Page 35 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 35 Which ONE of the following describes the NORMAL and BACKUP makeup supplies to the KC Surge Tank?

NORMAL BACKUP A.

YE RN B.

YM YD C.

YM RN D.

YF YD Page 36 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 36 Given the following Unit 1 conditions:

The Unit was at 60% power prior to a steam leak in the turbine building.

The crew has isolated the leak per AP/1/A/5500/028 (Secondary Steam Leak).

The crew is responding to low Pressurizer pressure per APIIIAI5500/01 I (Pressurizer Pressure Abnormalities).

Subsequently:

IA and 1D Pressurizer Heaters automatically ENERGIZED at appropriate setpoint.

Pressurizer pressure is at 2140 psig and slowly increasing.

I B Pressurizer Heater is DE-ENERGIZED due to breaker failure.

Based on the above listed conditions:

(1)

Automatic PZR PORV operation blocked.

(2)

Tech Spec 3.4.9 (Pressurizer) met.

A.

(1) is NOT (2) is B.

(I) is NOT (2) is NOT C.

(1) is (2) is D.

(1) is (2) is NOT Page 37 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 37 Given the following Unit 2 conditions:

The Unit is at 100% power.

2B Pressurizer heaters are manually energized to promote mixing following unit start-up.

All plant parameters are at equilibrium.

A fault causes breaker 2LXH-6C (2B NC PZR Heater Power Panel PHP2B Feeder) to OPEN.

(1)

How will the output of the pressurizer master control change?

(2)

What is the systems response to the loss of heat input?

A.

(1)

Increase (2)

Pressurizer Spray Valves will close prior to A & ID Pressurizer Heaters energizing.

B.

(1)

Decrease (2)

Pressurizer Spray Valves will close prior to A & D Pressurizer Heaters energizing.

C.

(1)

Increase (2)

A and D Pressurizer Heaters will energize prior to Pressurizer Spray Valves closing.

D.

(1)

Decrease (2)

A and D Pressurizer Heaters will energize prior to Pressurizer Spray Valves closing.

Page 38 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 38 In accordance with Technical Specifications, which ONE of the following reactor trips is required to be OPERABLE to provide protection against Departure from Nucleate Boiling (DNB) from Mode 2 to 100% power?

A.

Pressurizer low pressure B.

OPDT C. LowNCloopflow D. OTDT Page 39 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 39 Given the following Unit 1 conditions:

The Unit is at 100%.

Testing has revealed that ONE channel of Auxiliary Feedwater Auto-Start logic on Trip of ALL Main Feedwater Pumps will NOT actuate within the acceptance criteria.

The channel is declared INOPERABLE at time 0415.

In accordance with T.S. 3.3.2, (ESFAS Instrumentation), the required action is to place the channel in A.

trip no later than 0515.

B.

bypass no later than 0515.

C.

trip no later than 0445.

D.

bypass no later than 0445.

Page 40 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 40 Given the following Unit 1 conditions:

Initial:

The Unit is at 80% power.

Lower Containment Ventilation Units (LCVUs) IA, 1 B, 1 C are in operation.

Upper Containment Ventilation Unit (UCVU) 1 B is in operation.

Subsequently:

Containment temperature, pressure, and humidity are slowly increasing.

Containment radiation levels are normal.

In accordance with AP/1/A15500/028, (Secondary Steam Leak), ALL LCVUs will be operated in (1) speed, and (2) cooling.

A.

(1)

HIGH (2)

NORM B.

(1)

HIGH (2)

MAX C.

(I)

LOW (2)

NORM D.

(1)

LOW (2)

MAX Page 41 of 76 Catawba 2013 NRC Initial License Exam

- Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 41 Given the following Unit 1 conditions:

The Unit is in Mode 4.

IAD-13 /A7 (ICE COND LOWER INLET DOORS OPEN) alarm is LIT.

The lower inlet door position display panel indicates that a door is open.

The door is confirmed to be cracked opened, and cannot be closed.

No other alarms related to the ice condenser, NF system or AHUs are lit.

Which, if any, of the following is REQUIRED to be entered based on the current plant conditions?

1.

Tech Spec 3.6.13 (Ice Condenser Doors) 2.

Tech Spec 3.6.12 (ke Bed)

A.

I ONLY B.

2 ONLY C.

land2 D.

No Tech. Spec. entry required.

Page 42 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 42 In order to align IA train ND to supply containment spray, 1 NS-43A (ND Pump A to NS Spray Header Containment Isolation Valve) must be opened.

(1)

In order to open this valve, must be open.

(2)

Once aligned, spray be directed thcough the NS spray rings.

A.

(1)

INS-I 8A (NS Pump A Suct from Cont Sump)

(2) will B.

(1)

.(2)

C.

(1)

(2)

D.

(1)

(2)

I NS-1 8A (NS Pump A Suct from Cont Sump) will NOT 1NI-185A (ND Pump 1A Cont Sump Suct) will 1NI-185A (ND Pump 1A Cont Sump Suct) will NOT Page 43 of 76 Catawba 2013 NRC Initial License Exam

- Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 43 Which Motor Control Center provides power to INS-20A (NS Pump IA Suct from FWST)?

A.

1EMXA B.

IEMXD C.

1MXC D.

1MXD Page 44 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 44 In order to protect the Main Turbine from overspeed following a loss of generator load, the (I) will close at a maximum of (2) of rated speed.

A.

(1)

Intercept Valve (2) 103%

B.

(1)

Intercept Valve (2) 105%

C.

(1)

Reheat Stop Valve (2) 103%

D.

(1)

Reheat Stop Valve (2) 105%

Page 45 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 45 Given the following Unit I conditions:

Reactor power is 8%.

Steam Dumps are in MANUAL.

Preparations are being made to place the Main Turbine online.

Subsequently:

1SV-21 (IA S/G Safety No. 2) fails OPEN and cannot be isolated.

Complete the following statement:

(1)

Assuming no operator action, reactor power will STABILIZE at approximately A.

8%

B.

10.5%

C.

13%

D.

15.5%

Page 46 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 46 Given the following Unit 2 conditions:

Unit 2 is currently at normal operating pressure and temperature making preparations for unit startup following refueling shutdown.

2A and 2B CA pumps are maintaining SIG levels.

2A CFPT has been reset and pump startup preparations are in progress.

Subsequently:

The RO allows all SIG levels to increase to 80%

(1) 2A CFPT is currently (2)

A purpose of the P-14 signal to avoid challenging main steam piping and supports due to excess weight.

A.

(1) reset (2) is B.

(1) reset (2) is not C.

(1) tripped (2) is not D.

(1) tripped (2) is Page 47 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 47 Given the following Unit I initial conditions:

The Unit was at 100% power.

The 1C SIG secondary manway failed resulting in a reactor trip and safety injection.

10 minutes later:

Containment pressure is 3.2 psig and slowly decreasing.

S/G parameters are as follows:

. s: A NRLevel 14%

8%

5%

16%

CA Flow 110 gpm 130 gpm 120 gpm 100 gpm All NC Tcolds are 445°F and decreasing.

All NC Thots are 475 °F and decreasing.

All MSIVs are OPEN and will NOT close.

The crew has entered EPI1IA/5000/ECA-2.1 (Uncontrolled Depressurization of All Steam Generators).

(1)

How will the crew respond to step 6 to Control feed flow... in EP!11N5000/ECA-2.i?

(2)

Which temperature indication is used to initiate dumping steam and evaluating changes to CA flow for stabilizing NC temperature in this procedure?

A.

(1)

Reduce flow toO gpm each in IA and 1D S/Gs and maintain at least 75 gpm in lB and IC S/Gs.

(2)

NC Thots B.

(1)

Reduce flow to 75 gpm each in all four S/Gs.

(2)

NC Thots C.

(1)

Reduce flow toO gpm each in IA and ID S/Gs and maintain at least 75 gpm in lB and IC S/Gs.

(2)

NC Tcolds D.

(I)

Reduce flow to 75 gpm each in all four StGs.

(2)

NC Tcolds Page 48 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 48 Which ONE of the following breaker operations can be performed from the control room given the accompanying condition?

A.

CLOSE 1 ETA-2 (Alternate Feeder to 1 FTA) with 1 FTA-1 (Alternate Incoming Breaker from I ETA) OPEN.

B.

CLOSE PCB-15 (Unit Tie PCB) with PCB 14 (Unit Tie PCB) CLOSED.

C.

CLOSE GEN PCB I B while MOD lever is in the SAFE position.

D.

CLOSE I HTA-5 (1 HTA and 2HTA Tie breaker) with 1 HTA-1 (Incoming Feeder from XFMR lATE) and 2HTA-4 (Incoming Feeder from XFMR 2ATE) CLOSED.

Page 49 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 49 (1)

Auxiliary Control Power Batteries ICBA and ICBB are capable of powering their associated loads for at least (1) without any manual load shedding of DC loads.

(2)

Manual DC load shedding is performed so that battery capacity is maintained at a value of no less than (2)

, as indicated on ICDA and ICDB voltage indication on IMC 8.

In accordance with EP!1/A15000/ECA-0.0 (Loss of All AC Power), Enclosure 23, DC Loads to be Shed During Loss of All AC Power, which ONE of the following completes the above statements?

A.

(1) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (2) 100 volts B.

(1) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

  • (2) 105 volts C.

(1) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (2) 100 volts D.

(1) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (2) 105 volts Page 50 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 50 In order to prevent blowing inverter input fuses, the Static Inverter must be (1) prior to closing the (2)

A.

(1)

Synchronized (2)

DC Input Breaker.

8.

(1)

Synchronized (2)

AC Output Breaker.

C.

(1)

Pre-charged (2)

DC Input Breaker.

D.

(1)

Pre-charged (2)

AC Output Breaker.

Page 51 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 51 Given the following conditions:

Unit 1 is at 100% power when the following alarm is received:

lAD-Il, B17, DiG A PANEL TROUBLE An NLO is dispatched and confirms that the power supply to the 1A DIG Battery Charger is de-energized.

A loss of which ONE of the following power supplies is the cause for these conditions?

A.

IEDE B.

IEMXE C.

IEADA D.

IVADA Page 52 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 52 Given the following Unit I conditions:

Initial:

A containment air release (VQ) is in progress.

1 EMF-39 (Containment Gas) Trip 2 setpoint is set to 1300 counts per minute (cpm) per the gas waste release permit.

I EMF-36 (Unit Vent Gas) is operable.

Subsequently:

A small reactor coolant leak develops around an instrument line.

The crew has determined that Safety Injection initiation is not warranted.

IEMF-39 countrate is 1000 cpm and increasing.

Current:

IEMF-38/39 sample pump has tripped off due to breaker failure.

1 RAD-1 D/4, IEMF-38/39 Containment Loss of Flow alarm is LIT.

1EMF-36 Trip 2 has actuated.

Which ONE of the following describes the effect of the above conditions?

A.

The VQ release will continue until manual operator action is taken to secure it.

B.

IEMF-36 detects the activity released and stops the VQ release.

No Containment Ventilation Isolation (Sh) signal is initiated.

C.

I EMF-39 loss of flow alarm actuates an Sh signal. The Sh signal stops the VQ release.

D.

I EMF-36 detects the activity released and actuates an Sh signal.

The Sh signal stops the VQ release.

Page 53 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 53 Given the following Unit 2 conditions:

The Unit is at 100%.

B Train KC is in service.

2A RN train is in operation for testing.

The RN trains are split with 2RN-48B (RN Supply X-Over Isol) closed.

2B RN pump flow is indicating 2700 gpm.

Subsequently:

2RN-351 2B KC HX Outlet Throttle) fails closed due to valve stem separation.

Assuming flow cannot be restored, which ONE of the following parameters will exceed an operational setpoint AND require a unit trip?

A.

Containment temperature B.

NCP stator temperatures C.

NCP motor bearing temperatures D.

Letdown Heat Exchanger temperature Page 54 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 54 Given the following Unit 1 conditions:

The VI system on Unit I has become heavily contaminated with oil and debris.

The VI Air Dryer begins to rapidly clog.

(1)

VI header pressure will decrease until lVl-670 (VI Auto Dryer Bypass) automatically opens at (1)

(2)

If IVI-670 FAILS and does NOT automatically open, AP/01N5500!022, (Loss of Instrument Air), directs the operators to (2) the air dryers locally.

A.

(1) 80 psig (2) bypass B.

(1) 85psig (2) bypass C.

(1) 8Opsig (2) swap D.

(1) 85 psig (2) swap Page 55 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 55 Given the following Unit I conditions:

Unit I was at 100% power.

At 1000, a secondary steam leak occurred in Unit I containment.

The crew has started a controlled shutdown per AP!1!N55001009 (Rapid Downpower).

Containment pressure and temperature trends indicate:

Time Temperature Pressure 1000 113°F 0.15 psig 1005 117°F 0.28 psig 1010 119°F 0.42 psig 1015 122°F 0.48 psig 1020 126°F 0.65 psig 1025 129°F 0.91 psig Assuming NO manual operator actions have occurred, which ONE of the following is the EARLIEST time period at which the Lower Containment Ventilation Units (LCVUs) cooling water bypass valves (full flow valves) automatically OPEN?

A.

Between 1005 and 1010 B.

Between 1010 and 1015 C.

Between 1015 and 1020 D.

Between 1020 and 1025 Page 56 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 56 Given the following Unit 1 conditions:

The Unit was at 8% power.

Turbine warming was in progress.

Subsequently:

1A and 1C NCPs tripped due to A train power supply fault.

A fast transfer on the associated 6900V busses did NOT occur.

(1)

An automatic reactor trip occur.

(2)

Following a reactor trip, the setpoint for a main feedwater isolation to automatically occur is less than or equal to Which ONE of the following completes the above statements?

A.

(1)

Will (2) 553°F B.

(1)

Will (2) 564°F C.

(1)

Will NOT (2) 553°F D.

(1)

WiIINOT (2) 564°F Page 57 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 57 Given the following:

Steam Dump Valve 1SB-3 (Main Steam Bypass to Condenser Control Valve #3) fails open during a plant startup. No operator action has been taken. Pressurizer pressure and reactor power trends (Power Range) indicate:

Time PZR Pressure N-41 N-42 N-43 N-44 (psig) 0835 1950 8

10 8

9 0836 1910 9

10 9

9 0837 1870 9

10 10 9

0838 1830 10 11 10 9

What is the EARLIEST time at which an automatic Reactor Trip signal will be generated?

A.

0835 B.

0836 C.

0837 D.

0838 Page 58 of 76 Catawba 2013 NRC Initial License Exam

- Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 58 As Unit 1 power increases above 20%,

(1) input(s) into the anticipatory circuit of narrow range S/G level response. This is due to a(n)

(2) transfer within the SIG water level control system.

A.

(1)

Steam Flow and Feed Flow (2)

Manual B.

(1)

Steam Flow and Feed Flow (2)

Automatic C.

(1)

Wide RangeS/G Level

-(2)

Manual D.

(1)

WideRangeS/G Level (2)

Automatic Page 59 of 76 Catawba 2013 NRC Initial License Exam

- Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 59 Unit I was initially at 100% power when the following sequence of events occurred:

1000 A Loss of Offsite Power occurred.

The reactor tripped.

When 1A DIG attempted to load lETA, 86N (Normal Incoming Undervoltage) relay actuated.

1005 A large break LOCA inside containment developed.

Containment pressure quickly increased to 3.0 psig and continues to slowly increase.

At 1010, which ONE of the foilowing describes the status of the VE (Annulus Ventilation) fans?

A.

ONLY I B VE fan is running.

B.

1A AND 1 B VE fans are running.

C.

ONLY 1 B VE fan will start in 4 minutes.

D.

1A AND 1 B VE fans will start in 4 minutes.

Page 60 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 60 Given the following:

Unit 1 is in Mode 6 with core unload in progress.

IA KF pump is running.

An RP Technician in the Spent Fuel Pool (SFP) building reports that level in the SEP is DECREASING.

The fuel assembly most recently removed from the core is currently in the reactor building manipulator crane.

In accordance with API1/A15500/026 (Loss of Refueling Canal Level):

(1)

If the level in the Spent Fuel Pool decreases to 38.0 feet, the 1A KF pump required to be secured.

(2)

The fuel assembly in the reactor building manipulator crane is REQUIRED to be placed A.

(1) is (2)

Into the upender and lowered to the fully down position.

B.

(1) is (2)

Fully down in the core or the deep end of the canal.

C.

1) is NOT (2)

Into the upender and lowered to the fully down position.

D.

(1) is NOT (2)

Fully down in the core or the deep end of the canal.

Page 61 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 61 Which ONE of the following describes the effect of IEMF-15, Spent Fuel Building Refueling Bridge Monitor losing power?

A.

Fuel movement in the Spent Fuel Pool must be stopped immediately.

B.

SEP Ventilation System automatically swaps to filter mode.

C.

New fuel elevator cannot be operated in the UP direction.

D.

The Auxiliary Hoist cannot be raised.

Page 62 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 62 Given the following conditions:

Unit I and 2 are at 100% power.

VQ release is in progress on both units.

Subsequently:

A leaking isolation valve has initiated an unplanned release from C Waste Gas Decay Tank.

A packing leak has developed at 1WG-160 (WGDT Outlet to Unit Vent Isol).

OEMF-41 (Aux Bldg Ventilation) is in Trip 2.

1 EMF-36 (Unit Vent Gas Monitor) is in Trip 2.

No operator action has been taken.

Currently:

(1) 2AVA alignedtofiltermode.

(2)

Unit 2 VQ release been secured.

A.

(1) is (2) has B.

(1) is (2) has NOT C.

(1) is NOT (2) has NOT D.

(I) is NOT (2) has Page 63 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 63 Given the following Unit I initial conditions:

The Unit is at 100% power.

IAI Cont Floor & Equip Sump Pump has automatically started due to normal operational leakage.

Subsequently:

IEMF-53A, (Containment Hi Range) loses power.

(Note the following component designators):

IWL-825A, (Cont Smp Pumps Disch Cont Isol) 1WL-827B, (Cont Smp Pumps Disch Cont Isol)

Which ONE of the following describes the status of the components listed below?

IWL-825A IWL-827B Pump IAI A.

OPEN OPEN ON B.

CLOSED CLOSED OFF C.

CLOSED OPEN OFF D.

CLOSED OPEN ON Page 64 of 76 Catawba 2013 NRC Initial License Exam

- Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 64 Which ONE of the following statements describes an interlock provided for the cross-connect of the Instrument Air (VI) and Station Air (VS) systems?

As (VI) system pressure decreases,__________________________________

A.

1VI-500 (VI to VS Supply Isolation) CLOSES at 85 psig.

B.

lVl-500 (VI to VS Supply Isolation) CLOSES at 76 psig.

C. IVS-78 (VS Auto Backup to VI) OPENS at 80 psig.

D.

IVS-78 (VS Auto Backup to VI) OPENS at 76 psig.

Page 65 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 65 If normal cooling has been lost to the E and F VI compressors, the (1)

System can be aligned to supply cooling water to the E and F VI compressors with the discharge aligned to the (2)

System.

A.

(1)

RE (2)

RN B.

(1)

RE (2)

RL C.

(1)

RL (2)

RN D.

(1)

RN (2)

RL Page 66 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 66 Which ONE of the following describes an appropriate example of information to be communicated to the shifts by use of an OFS Guide, in accordance with the requirements of SOMP 01-13 (Operations Work List, Routine Task List, and OPS Guides)?

A.

Notification that engineering has determined a Tech Spec inoperability may exist under certain conditions due to new analyzed failure scenarios.

B.

OSM direction to verify IA D/G Lube Oil Temp two times per shift due to an annunciator failure.

C.

Temporary procedure instructions for a system which is currently being modified, while a procedure change is being completed.

D.

Direction, from the unit lead, concerning work (or evolutions) that need(s) to be completed on a particular shift.

Page 67 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 67 In accordance with SOMP 02-O1,(Safety Tagging and ConfigurationControl):

(1)

Using a Configuration Control Card (CCC) to position components within the boundaries of an R&R to allow additional venting/draining capacity allowed.

(2)

When more than Tag Sticker(s) is/are required for a control panel switch, a controlling sticker shall be placed on the switch and the Tag Sticker(s) will be placed in the Control Room Sticker Logbook.

Which ONE of the following completes the above statements?

A.

(1)

IS (2)

One B.

(1)

IS (2)

Two C.

(1)

IS NOT (2)

One D.

(1)

IS NOT (2)

Two Page 68 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 68 Given the following Unit I conditions:

The Unit is in Mode 6.

(1)

In accordance with Tech. Spec. 3.9.6 (Refueling Cavity Water Level), if water level is LESS than 23 above the reactor vessel flange, then control rod drive shaft unlatching (2)

In accordance with PTI1IAI4600/002 F,

(Mode 6 Periodic Surveillance Items),

if 1KFP512O (Spent Fuel Pool Level) fails low during fuel unloading operations, a check of NC system WR level (2) adequate to satisfy the requirements of this PT.

A.

(1) must be stopped (2) is B.

(1) must be stopped (2) is NOT C.

(1) may continue 2) is D.

(I) may continue

-(2) is NOT Page 69 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 69 With Unit I in Mode 3, which ONE of the following describes the MAXIMUM NC system pressure, in accordance with Tech Spec 2.1.2 (RCS Pressure SL), and the MAXIMUM time allowed to restore compliance, per Tech Spec 2.2.2 (SL Violations)?

A.

2735 psig 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B.

2735 psig 5 minutes C.

2750 psig 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D.

2750 psig 5 minutes Page 70 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 70 With both Units at 100% power the following alarm will function.

IAD-13, A/5, Main Fire Pump ACtrI Pwr Trouble To identify the status of this annunciator, a will be placed on or near the annunciator window in the Control Room.

A.

distinctive GREEN flag B.

distinctive RED flag C.

WHITE deficiency sticker D.

YELLOW Restricted sticker Page 71 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 71 Consider the following conditions relating to planned radiation releases:

1.

EMF-50 (WG Disch Monitor - Waste Gas) Trip 2 has actuated.

2.

Turbine Building Sump release exceeds EMF-31 (Turbine Building Sump) pre-set level.

In accordance with the applicable procedures, which ONE of the following completes the below statements (consider each separately):

(1)

Re-initiation of the Waste Gas release at least once without resampling (1) allowed.

(2)

Re-initiation of the Turbine Building Sump release at least once without resampling (2) allowed when the release exceeds EMF-31 pre-set level.

A.

(1) is (2) is NOT B.

(1) is (2) is C.

(1) is NOT (2) is D.

(1) is NOT (2) is NOT Page 72 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 72 Given the following Unit I conditions:

The Unit has just entered Mode 5 in preparation for refueling.

The missile shield has not been removed.

A lower containment entry is planned for the next shift.

The on-duty crew will perform purge of containment in preparation for the containment entry.

Currently, the VP system is secured with all fans off and containment purge and exhaust valves closed.

For this planned containment purge:

(1) The NORMAL-REFUEL SELECTOR switch is placed in the (1) position.

(2) This alignment is used in order to (2)

Which ONE of the following completes the above statements, in accordance with OP/1/A/6450/015 (Containment Purge System)?

A.

(1)

NORM (2)

Prevent overpressurization of upper containment and an unmonitored release path.

B.

(1)

NORM (2)

Prevent opening the ice condenser doors and to ensure air flow is routed through clean upfilters.

C.

(1)

REFUEL (2)

Prevent overpressurization of upper containment and an unmonitored release path.

D.

(1)

REFUEL (2)

Prevent opening the ice condenser doors and to ensure air flow is routed through clean up filters.

Page 73 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 73 Given the following Unit 1 conditions:

The crew is performing a SIG depressurization in accordance with EP/1/A/5000IFR-C.2 (Response to Degraded Core Cooling) due to an ORANGE Path on SPDS.

While in FR-C.2 the crew receives a RED Path for NC Integrity.

The crew (1) transition to EP/1/N5000tFR-P.1 (Response To Imminent Pressurized Thermal Shock Condition) because (2)

A.

(1) will (2)

Pressurized Thermal Shock is a higher priority concern because of the potential challenge to reactor vessel integrity.

B.

(1) will (2) during the performance of an ORANGE path procedure, if any RED condition arises, then the RED condition is addressed first.

C.

(1) will NOT (2)

Core Cooling is a higher priority concern and should be completed prior to performing a lower priority procedure.

0.

(1) willNOT (2) transition to this procedure could cause further degradation of core cooling.

Page 74 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 74 (1)

OEMF-41 (Aux. Bldg. Radiation Monitor) indicating 5x10 5 cpm (1) require initiation of a Site Assembly.

(2)

The minimum level of emergency classification which ALWAYS requires an evacuation of non-essential personnel is A.

(1) will (2)

Site Area Emergency B.

(1) will (2)

General Emergency C.

(1) will NOT (2)

Site Area Emergency D.

(1) will NOT (2)

General Emergency Page 75 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

CNS 2013 NRC Exam 75 Questions REACTOR OPERATOR Question 75 Which ONE of the following is a Post Accident Monitoring Instrument, AND is controlled by Tech. Spec. 3.3.3, [Post-Accident Monitoring (PAM) Instrumentation]?

A.

Containment Humidity B.

SG Water Level Wide Range C.

1 EMF-36L, Unit Vent Gas Monitor D.

IEMF-38L, Containment Monitor - Particulate Page 76 of 76 Catawba 2013 NRC Initial License Exam - Reactor Operator

REACTOR OPERATOR

-Catawba Nuclear Station ILT 2013 NRC Written Exam (Sept. 2013)

REFERENCE PACKAGE CONTENTS EXAM ID:

ILT2O13NRC Exam RO Exam I

Databook Figure 57, Reactor Coolant Saturation Curve, Wide Range 2

Databook Figure 58, Reactor Coolant Saturation Curve, Narrow Range 3

ECA-1.1 (Loss of Emergency Coolant Recirculation), Step 18 4

ECA-1.1, Enclosure 4 (Minimum S/I flowrate Versus Time After Trip)

Unit I Data Book Source: OAC Reactor Coolant Saturation Calculations 2500 2400 2300 2200 2100 2000 1900 1800 1700

° 1600

. 1500 1400 1300 1200 1100 1000 C.)

900 800 700 600 500 400 300 200 100 0

200 250 300 350 400 450 500 550 600 650 700 NC System Temperature (Deg F)

Rev. 2, 4/5/2002 Figure 57 - Reactor CooTant Saturation Curve, Wide Range Page 1

Unit I Data Book Source: OAC Reactor Coolant Saturation Calculations 850 800 750 700 650 600 550 500 450 400 350 300 250 200 150 100 50 0

100 150 200 250 300 350 400 450 500 NC Temperature (Deg F)

Normal Conditions

Adverse Conditions 550 Rev. 2, 4/5/2002 Figure 58 - Reactor Coolant Saturation Curve, Narrow Range Page 1

CNS LOSS OF EMERGENCY COOLANT RECIRCULATION PAGE NO.

EP/1/A!5000!ECA-1.1 20 of 82 Revision 40 ACTION/EXPECTED RESPONSE I

I

RESPONSE

NOT OBTAINED

17. (Continued) d.

Attempt to start 1 B NC pump to provide

d. if I B NC pump cannot be started, normal pressurizer spray. REFER IQ THEN start NC pump(s) as necessary (NC Pump Start).

to provide normal pressurizer spray.

REFER] Enclosure 3 (NC Pump Start).

18.

Verify Sf1 termination criteria as follows:

a.

Verify RVLIS indication is adequate as

a. Q ]EQ. Step 25.

follows:

. IF all NC pumps are off, THEN verify REACTOR VESSEL LR LEVEL -

GREATER THAN 61%.

OR

. ffl any NC pump is on, THEN verify REACTOR VESSEL DIP GREATER THAN REQUIRED DIP FROM TABLE BELOW:

Required REACTOR VESSEL DIP TRNA TRNB Number of With NC Pump 1A With NC Pump 1C NC Pumps On On Off On Off 4

80%

N/A 80%

N/A 3

60%

32%

60%

32%

2 45%

20%

45%

20%

1 35%

14%

35%

14%

CNS LOSS OF EMERGENCY COOLANT RECIRCULATION PAGE NO.

EP/1/A15000/ECA-1.1 21 of 82 Revision 40 I

ACTION/EXPECTED RESPONSE I

I

RESPONSE

NOT OBTAINED

18. (Continued) b.

NC subcooling based on core exit T/Cs b.

Perform the following:

- GREATER THAN 50°F.

1)

Determine minimum S/I flow required. REFER IQEnclosure 4 (Minimum S/I Flowrate Versus Time After Trip).

2) Stop S/I pumps as required to obtain the following:

. Minimize S/I flow

. Maintain S/I flow greater than or equal to flow required by (Minimum S/I Flowrate Versus Time After Trip).

_3) IQStep25.

I 19.

Ensure the following containment isolation signals

- RESET:

  • PhaseA
  • Phase B.

I CNS I

LOSS OF EMERGENCY COOLANT RECIRCULATION I PAGE NO.

I EP/1/A)5000IECA-1.1 I

76 of 82 I - Page 1 of 1 Revision 40 Minimum S!I Flowrate Versus Time After Trip FLOW RATE (GPM)

S/I FLOW REOUI1ED TO MATCH D-ECAY HEAT 600 500 400 300 200 100 0

789 100 2

3 4

56789 1000 3

4 56789 10000 z ::

iiz:::

=

iz:::

10 2

3 456 TINE (MINUTES)

Ill isjra (5 r5 (J 11 00 1

661.

() () ()

861.

i £61.

961.

961-() ( J 1761.

E61.

() ( CJ 6l-1-61.

Ill u168[

fl 1

£91.

1) J (1 15 1) 981.

981-(i1 (a) f

() £9[

() (dl (51 (d) () 8[

ía)

[81.

Ill 1a) 6L[

9L[

(a) (a) 1J

( £L[

(5) [q) () (1 (J L1.

ro !9)

I-L[

11111 11111 III IIIIIIIIIIIIIIIIIIIIIII POH 01 NOl1NlDS000-L 0S0U000

£0 066 1000 oioi 1-HVd-lt1-ON VJNOd (D (a) ()

l 9) £91.

S91.

1791.

f!

[91-1)@(a)J[J 091.

691.

() @1 () () ()

891.

£91.

991.

991.

[J 1791-1ai) 1.91-Ci)Z c>

m c

C.)

I

[)(dlHdl(l 091.

0171.

((a(1H1 OEI.

01. ifl)@

01.1.

61[ 6E[

6[1.

5h1601.

I5)d5Ja)917[

1J(a)(1(9)9[

(5)[a)[a)(d)(91 91-1. (31(59Q[

L17[ LE[

L1.

L1.[ L0[

dlC)[(1 9[

dl)).[J 9[ (

9I. [N1(1 91.1. (J1)@

901.

917[ 9C1.

£a)f a)19) 91-a)a)19)g 1.1. 901.

(1dji5i)9 17171.

(i171. (D.J17L[

O[

E17[

9)C5)9)[ 1 C1.[ C01.

()idl JL(9) [(a]()(J(a

()(dl(Jo 1.17[ I)1.E[ I((

(([ (1.0[

(9)[3 II

()

dji) liii)

(j In (J OJO) 1l 1)

(J laNaI

()*

001-06

[3)IaNclWCv) 09

()@O( o

[dl@(1 09 568 1a)6L 69 (A(aJI186 lSI3l1d)l71 99 3)IdIa)I9)9 q5jj99 5

L6 5 L9 LL 13?9

ØLS (aN96 (98 (aJlaNJ9LJJ(aHdl(aIS99 I1i99 i1519 9

g 30 ov9 ra) 99 a5l&175 a15)(9 179 9)

$(

519)19) 17L i9)15(8)[9)179 1a)fa) 8 9)*Nat 9

cg 13)(a)15dl6 1)(5&(9)8

[a)I5JI9)SL 1a)1dNr9)9 (5)9))[Jl9Jg

[6 1.9 1

a)(a)

[L ar8

[9 ta)

J9l 9

-/c C)

/

(a) (a) ía) 151 151 (a)

(a) (a) (a)

Ia) (l (a)

ID ID (a)

(151 (a) lJ 191 (A) (Xj (A]

IA) (Al RI r j Ri ID (Kl (Al (A) Ri (Al (K) íA)

Ri Ri

19) (9) [9) ) 19) (9) Ri (9) (9)
19) (9) (9) (9) (9) 19) 19) (9) 19)

Ri

ía)

[9) (Al (A) IA) (K) (A) (K) (A) IA) IA (Al IA) 1K) (A 1K) Ri IA) IA A

n) ID (a) ID ID )?

(Al (a) 19) ID (a) (dl (9) (dl (9)

[9)1 (dl dl A) 19) 111 Ii) (11 (ii (A] II) [1) (A) ID (A) [1) [1 ID Ri 11 (I) (El Ri (A). ID r 15) (5)

Is a) (5) (5) 15) (5) 15) (5) Ri (5) (5)

05) (5) 5) (5)

(a) () 19) (9) (9) 151 (9) (9)

19) 19) 15 (9) (9) 1
19) 9) (9) 9)

dl (6) () 9) 5) (6i 16) (61 9) 9) (6) (6

16) I 16)
6) 16)
6) 0 0 (9) ( Ii) (9) 1 f9) 19) Ri Ri Ri
19) Ri (9) Ri Ri 19) S Ri
16) (6) (6) (61 rdJ 16) (61 16) lol 16) 16) 16) (El
19) 5 15 5

161 16)

19) 911 (N) IN) (5) 911 9) IN) (9)
19) 91)
19) 91) [9) [9)

ía) 9) 19)

N

)i9) 19) a)1i

1) I-i)
19) (, I(i) 1j 111 iRi ID hi 9)9)

-1 (91 Ri (91 611 (9) (9) 61)

19) 61) 19) 19) (9) (9) (9)[9) 15)

ID i1 (r) IP) 19) (El 1n) (El 1r) 1) J9 ID (E (a) (El (r) (a) (9) (El ID (F) 11 Ii) (1) (jj 113 (j) 11) (1) 0] Ri ill (A) (1) ID 0 (I) 111 3

19) 91(19) 19) (9) 91) ii) IF)) 1H ([i) (9) (F3 ID (5) (51 IF4 19) 91) IF(

16)

19) (9) 15) (9) 151 (9) 19) (9) (1 (5) 15) 19) (51 [51 (5) ID 15) (51 Ri 151 (9) (a) ID ID (a) (a) (5) (5) (51 r (51 (5)
15) (5) 19)
15) ID 15)

(3 150 (dl (dl Ia) 16) !al 161 (61 (6) (ii) 19)

(61 16) (61 (di (9) 9)3(a)

6) (5) 16 51(9) iS) 151 (5) 15) (5) (5) 15
5) (51 15) 15) (5) 51 5i
15) (5, Ri 15) 151 151
15) (5) 151 151 (51 (5) ID ID 1 (6) Ri 151 (5)

Ri (90 9) (9) (90 19 [9) (9) (90

9) (9) 9) 19 90 (9 90 190 (90 90 191 1v1 (5) Ri (5) @3Ri (51 (9] 15) 15] (5) 151151 ID (9) 9)
16) (5)15)1(5) 61Ri5)5]IDl5)

(51IDID (5)Ri[5i(51Ri(a)RiI9)IiliSl (Z1Ri111121 RiID1 (t)I(9) 19)9)19i191 15119)(5l (51(51151 (9)511ID15115119115191151(5i 1

s 11 Ri 1

)

,i5)151IDI5](51I51 I)a1RiIa)[sIalia)a)Ri(si

[91151(51(9)

(9l(K(161(9lIDRi (J(J151 1

1Ri 1

51I61i[51151 (DDI5)151IDID (9)19l(51(dll51(t)()(5)i9)1E)

RiIDRi(

RiRiRi l13IDRi (AlID 1

51RiRiIDRiRi151ID 11310(A1ID,WL1(i)3DIIIIDuI) r[iiJcDI;(AlT)f(111W(A)

IdlIDIDio)

IDIDRi)1511dlRi ioiRiRiI5)RiIDID1&15lfo jc,$

4 D \\ o rS HS +/-N T1OiN +/-NGfl+/-

001 HOQSJd

/

(5) (6) 5)15)

(9) (6)

Ri dl s rs 19)

ID Ri 9)

(51 (6) ID (5) 6E (9) b (a) (5) (5) SC 15)19) ID 0 IDzC Rib (6) (5) (51 9E IDI6)b51ID 9C ID (6) (5)

(5)

VC

15) 115) 9) 19) 1-C

) 0 617 ID (51 s (9) 1 ID

£17 (6) (5) (5) 9 bIDID 917

[IDl Vl (5)5).

(a). (6)

Ii 113) 113) 11 19)

SIDoC (5) dl) 8 I (91. [

[51(6JIDID0o (5)1 (91)5)) ID 91.

[5)9)119)151111.

IDID S (5)) (51 91.

19) 1 (51 (5) (51 91.

(5) (6) (6) 5)0 (5)

16) 5)5 1-I.

dl (51 [a] (5) (5) 01.

(13 ID (5) S dl) 8 ID C

15) ftP
9) 191 di.

[\\

!33HS3JO3S 001 HOOSJd

,L\\JJ >