Technical Specification Bases Changes
ML13263A373
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/18/2013
From: Henderson K
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13263A373 (43)


Text

Kelvin Henderson Vice President 4* ENERGY, Catawba Nuclear Station 803-701-4251 Duke Energy CNOlVP I 4800 Concord Rd.

York, SC 29745 September 18, 2013 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Technical Specification Bases Changes Pursuant to 1 OCFR 50.4, please find attached changes to the Catawba Nuclear Station Technical Specification Bases. These Bases changes were made according to the provisions of Technical Specification 5.5.14, "Technical Specifications (TS) Bases Control Program."

Any questions regarding this information should be directed to Larry Rudy, Regulatory Affairs, at (803) 701-3084.

I certify that I am a duly authorized officer of Duke Energy Carolinas, LLC, and that the information contained herein accurately represents changes made to the Technical Specification Bases since the previous submittal.

Kelvin Henderson Attachment www.duke-energy.com

U.S. Nuclear Regulatory Commission September 18, 2013 Page 2 xc:

V. M. McCree, Regional Administrator U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 Mr. J. C. Paige NRC Project Manager (CNS)

U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852 G. A. Hutto, Senior Resident Inspector Catawba Nuclear Station

<cnENERGY.

Catawba Nuclear Station Duke Energy 4800 Concord Rd.

York, SC 29745 September 12, 2013 Re:

Catawba Nuclear Station Technical Specifications Bases Please replace the corresponding pages in your copy of the Catawba Technical Specifications Manual as follows:

REMOVE THESE PAGES INSERT THESE PAGES LIST OF EFFECTIVE PAGES Pages 13 - 19 (Bases section only)

Pages 13 - 19 (Bases section only)

TAB 3.6.5 B 3.6.5-1 thru B 3.6.5-4 Revision 2 B 3.6.5-1 thru B 3.6.5-4 Revision 3 TAB 3.8.1 B 3.8.1-1 thru B 3.8.1-29 Revision 4 B 3.8.1-1 thru B 3.8.1-29 Revision 5 If you have any questions concerning the contents of this Technical Specification update, contact Kristi Byers at (803)701-3758.

Randy Hart Manager, Regulatory Compliance www.duke-energy.com

ii

'ii B 2.1.1-1 B 2.1.1-2 B 2.1.1-3 B 2.1.2-1 B 2.1.2-2 B 2.1.2-3 B 3.0-1 B 3.0-2 B 3.0-3 B 3.0-4 B 3.0-5 B 3.0-6 B 3.0-7 B 3.0-8 B 3.0-9 B 3.0-10 B 3.0-11 B 3.0-12 B 3.0-13 B 3.0-14 B 3.0-15 B 3.0-16 B 3.0-17 B 3.0-18 B 3.0-19 B 3.1.1-1 thru B 3.1.1-6 BASES Revision 1 Revision 2 Revision 1 Revision 0 Revision 1 Revision 1 Revision 0 Revision 0 Revision 0 Revision 1 Revision 1 Revision 2 Revision 3 Revision 3 Revision 2 Revision 2 Revision 3 Revision 2 Revision 3 Revision 3 Revision 3 Revision 3 Revision 3 Revision 1 Revision 1 Revision 0 Revision 0 Revision 0 Revision 3 4/08/99 3/01/05 6/21/04 9/30/98 12/19/03 12/19/03 9/30/98 9/30/98 9/30/98 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 3/19/07 5/05/11 Catawba Units 1 and 2 Page 13 07/27/13

B 3.1.2-1 thru B 3.1.2-5 B 3.1.3-1 B 3.1.3-2 B 3.1.3-3 B 3.1.3-4 B 3.1.3-5 B 3.1.3-6 B 3.1.4-1 thru B 3.1.4-9 B 3.1.5-1 thru B 3.1.5-4 B 3.1.6-1 thru B 3.1.6-6 B 3.1.7-1 B 3.1.7-2 B 3.1.7-3 B 3.1.7-4 B 3.1.7-5 B 3.1.7-6 B 3.1.8-1 thru B 3.1.8-6 B 3.2.1-1 thru B 3.2.1.-11 B 3.2.2-1 thru B 3.2.2-10 B 3.2.3-1 thru B 3.2.3-4 B 3.2.4-1 thru B 3.2.4-7 B 3.3.1-1 thru B.3.3.1-55 B 3.3.2-1 thru B 3.3.2-49 B 3.3.3-1 thru B.3.3.3-16 B 3.3.4-1 thru B 3.3.4-5 Revision 2 Revision 1 Revision 1 Revision 1 Revision 1 Revision 1 Revision 1 Revision 1 Revision 2 Revision 1 Revision 0 Revision 2 Revision 2 Revision 2 Revision 2 Revision 2 Revision 2 Revision 4 Revision 3 Revision 2 Revision 2 Revision 6 Revision 9 Revision 5 Revision 2 5/05/11 4/26/00 4/26/00 4/26/00 4/26/00 4/26/00 4/26/00 5/05/11 5/05/11 5/05/11 9/30/98 1/08/04 1/08/04 1/08/04 1/08/04 1/08/04 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/26/11 5/05/11 08/02/12 5/05/11 Catawba Units 1 and 2 Page 14 07/27/13

B 3.3.5-1 thru B 3.3.5-6 B 3.3.6-1 thru B 3.3.6-5 B 3.3.9-1 thru B 3.3.9-5 B 3.4.1-1 thru B 3.4.1-5 B 3.4.2-1 B 3.4.2-2 B 3.4.2-3 B 3.4.3-1 thru B 3.4.3-6 B 3.4.4-1 thru B 3.4.4-3 B 3.4.4-2 B 3.4.4-3 B 3.4.5-1 thru B 3.4.5-6 B 3.4:6-1 thru B 3.4.6-5 B 3.4.7-1 thru B 3.4.7-5 B 3.4.8-1 thru B 3.4.8-3 B 3.4.9-1 thru B 3.4.9-5 B 3.4.10-1 B 3.4.10-2 B 3.4.10-3 B 3.4.10-4 B 3.4.11-1 thru B 3.4.11-7 B 3.4.12-1 thru B 3.4.12-13 B 3.4.13-1 thru B 3.4.13-7 B 3.4.14-1 thru B 3.4.14-6 Catawba Units 1 and 2 Revision 2 Revision 6 Revision 2 Revision 3 Revision 0 Revision 0 Revision 0 Revision 2 Revision 2 Revision 1 Revision 0 Revision 3 Revision 4 Revision 5 Revision 3 Revision 3 Revision 1 Revision 0 Revision 1 Revision 2 Revision 4 Revision 4 Revision 6 Revision 3 5/05/11 08/02/12 5/05/11 5/05/11 9/30/98 9/30/98 9/30/98 5/05/11 5/05/11 1/13/05 9/30/98 5/05/11 5/05/11 5/05/11 5/05/11 08/02/12 3/4/04 9/30/98 3/4/04 10/30/09 5/05/11 5/05/11 5/05/11 5/05/11 Page 15 07/27/13

B 3.4.15-1 thru B 3.4.15-10 B 3.4.16-1 thru B 3.4.16-5 B 3.4.17-1 thru B 3.4.17-3 B 3.4.18-1 B 3.4.18-2 B 3.4.18-3 B 3.4.18-4 B 3.4.18-5 B 3.4.18-6 B 3.4.18-7 B 3.4.18-8 B 3.5.1-1 thru B 3.5.1-8 B 3.5.2-1 thru B 3.5.2-10 B 3.5.3-1 B 3.5.3-2 B 3.5.3-3 B 3.5.4-1 thru B.3.5.4-6 B 3.5.5-1 thru B 3.5.5-4 B 3.6.1-1 B 3.6.1-2 B 3.6.1-3 B 3.6.1-4 B 3.6.1-5 B 3.6.2-1 thru B 3.6.2-8 B 3.6.3-1 thru B 3.6.3-14 B 3.6.4-1 thru B 3.6.4-4 Revision 6 Revision 4 Revision 2 Revision 0 Revision 0 Revision 1 Revision 0 Revision 0 Revision 0 Revision 0 Revision 1 Revision 3 Revision 3 Revision 0 Revision 1 Revision 1 Revision 4 Revision 1 Revision 1 Revision 1 Revision 1 Revision 1 Revision 1 Revision 2 Revision 4 Revision 2 5/05/11 10/23/12 5/05/11 1/13/05 1/13/05 3/18/08 1/13/05 1/13/05 1/13/05 1/13/05 3/18/08 5/05/11 5/05/11 9/30/98 4/29/04 4/29/04 5/05/11 5/05/11 7/31/01 7/31/01 7/31/01 7/31/01 7/31/01 5/05/11 5/05/11 5/05/11 Catawba Units 1 and 2 Page 16 07/27/13

B 3.6.5-1 thru B 3.6.5-4 B 3.6.6-1 thru B 3.6.6-7 B 3.6.8-1 thru B 3.6.8-5 B 3.6.9-1 thru B 3.6.9-5 B 3.6.10-1 thru B 3.6.10-6 B 3.6.11-1 thru B 3.6.11-6 B 3.6.12-1 thru B 3.6.12-11 B 3.6.13-1 thru B 3.6.13-9 B 3.6.14-1 thru B 3.6.14-5 B 3.6.15-1 thru B 3.6.15-4 B 3.6.16-1 thru B 3.6.16-4 B 3.6.17-1 B 3.6.17-2 B 3.6.17-3 B 3.6.17-4 B 3.6.17-5 B 3.7.1-1 B 3.7.1-2 B 3.7.1-3 B 3.7.1-4 B 3.7.1-5 B 3.7.2-1 B 3.7.2-2 B 3.7.2-3 B 3.7.2-4 B 3.7.2-5 Revision 3 Revision 6 Revision 3 Revision 6 Revision 2 Revision 5 Revision 5 Revision 4 Revision 1 Revision 1 Revision 3 Revision 1 Revision 0 Revision 0 Revision 0 Revision 1 Revision 0 Revision 0 Revision 0 Revision 1 Revision 1 Revision 0 Revision 0 Revision 2 Revision 1 Revision 3 07/27/13 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 3/13/08 9/30/98 9/30/98 9/30/98 3/13/08 9/30/98 9/30/98 9/30/98 10/30/09 10/30/09 9/30/98 9/30/98 6/23/10 9/08/08 10/30/09 Catawba Units 1 and 2 Page 17 07/27/13

B 3.7.3-1 B 3.7.3-2 B 3.7.3-3 B 3.7.3-4 B 3.7.3-5 B 3.7.3-6 B 3.7.4-1 thru B 3.7.4-4 B 3.7.5-1 thru B 3.7.5-9 B 3.7.6-1 thru B 3.7.6-3 B 3.7.7-1 thru B 3.7.7-5 B 3.7.8-1 thru B 3.7.8-7 B 3.7.9-1 thru B 3.7.9-4 B 3.7.10-1 thru B 3.7.10-9 B 3.7.11-1 thru B 3.7.11-4 B 3.7.12-1 thru B 3.7.12-7 B 3.7.13-1 thru B 3.7.13-5 B 3.7.14-1 thru B 3.7.14-3 B 3.7.15-1 thru B 3.7.15-4 B 3.7.16-1 B 3.7.16-2 B 3.7.16-3 B 3.7.16-4 B 3.7.17-1 thru B 3.7.17-3 B 3.8.1-1 thru B,3.8.1-29 Revision 0 Revision 0 Revision 0 Revision 0 Revision 1 Revision 2 Revision 2 Revision 3 Revision 4 Revision 2 Revision 3 Revision 3 Revision 9 Revision 2 Revision 6 Revision 4 Revision 2 Revision 2 Revision 2 Revision 2 Revision 2 Revision 0 Revision 2 Revision 5 9/30/98 9/30/98 9/30/98 9/30/98 9/08/08 10/30/09 5/05/11 5/05/11 08/02/12 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 1/09/13 5/05/11 5/05/11 5/05/11 9/27/06 9/27/06 9/27/06 9/27/06 5/05/11 07/27/13 Catawba Units 1 and 2 Page 18 07/27/13

B 3.8.2-1 B 3.8.2-2 B 3.8.2-3 B 3.8.2-4 B 3.8.2-5 B 3.8.2-6 B 3.8.3-1 thru B 3.8.3-8 B 3.8.4-1 thru B3.8.4. 10 B 3.8.5-1 B 3.8.5-2 B 3.8.5-3 B 3.8.6-1 thru B 3.8.6-7 B 3.8.7-1 thru B 3.8.7-4 B 3.8.8-1 thru B 3.8.8-4 B 3.8.9-1 thru B 3.8.9-10 B 3.8.10-1 thru B 3.8.10-4 B 3.9.1-1 thru B 3.9.1-4 B 3.9.2-1 thru B 3.9.2.4 B 3.9.3-1 thru B 3.9.3-5 B 3.9.4-1 thru B 3.9.4-4 B 3.9.5-1 thru B 3.9.5-4 B 3.9.6-1 thru B 3.9.6-3 B 3.9.7-1 thru B 3.9.7-3 Revision 0 Revision 0 Revision 0 Revision 1 Revision 2 Revision 1 Revision 4 Revision 10 Revision 0 Revision 2 Revision 1 Revision 4 Revision 3 Revision 3 Revision 2 Revision 3 Revision 3 Revision 4 Revision 4 Revision 4 Revision 3 Revision 2 Revision 1 9/30/98 9/30/98 9/30/98 5/10/05 5/10/05 5/10/05 5/05/11 5/05/11 9/30/98 7/29/03 7/29/03 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 5/05/11 Catawba Units 1 and 2 Page 19 07/27/13

Containment Air Temperature B 3.6.5 B 3.6 CONTAINMENT SYSTEMS B 3.6.5 Containment Air Temperature BASES BACKGROUND The containment structure serves to contain radioactive material that may be released from the reactor core following a Design Basis Accident (DBA). The containment average air temperature is limited, during normal operation, to preserve the initial conditions assumed in the accident analyses for a loss of coolant accident (LOCA) or steam line break (SLB).

The containment average air temperature limit is derived from the input conditions used in the containment functional analyses and the containment structure external pressure analyses. This LCO ensures that initial conditions assumed in the analysis of containment response to a DBA are not violated during unit operations. The total amount of energy to be removed from containment by the Containment Spray and ECCS systems during post accident conditions is dependent upon the energy released to the containment due to the event, as well as the initial containment temperature and pressure. High initial temperature results in a higher peak containment temperature. Low initial temperature results in a higher peak containment pressure. Exceeding containment design pressure may result in leakage greater than that assumed in the accident analysis. Operation with containment temperature in excess of the LCO limit violates an initial condition assumed in the accident analysis.

APPLICABLE SAFETY ANALYSES Containment average air temperature is an initial condition used in the DBA analyses that establishes the containment environmental qualification operating envelope for both pressure and temperature. The limit for containment average air temperature ensures that operation is maintained within the assumptions used in the DBA analyses for containment (Ref. 1).

The limiting DBAs considered relative to containment OPERABILITY are the LOCA and SLB. The DBA LOCA and SLB are analyzed using computer codes designed to predict the resultant containment temperature and pressure transients.

Catawba Units 1 and 2 B 3.6.5-1 Revision No. 3

Containment Air Temperature B 3.6.5 BASES APPLICABLE SAFETY ANALYSES (continued)

No two DBAs are assumed to occur simultaneously or consecutively.

The postulated DBAs are analyzed with regard to Engineered Safety Feature (ESF) systems, assuming the loss of one ESF bus, which is the worst case single active failure, resulting in one train each of Containment Spray System, Residual Heat Removal System, and Air Return System being rendered inoperable.

The limiting DBA for the maximum peak containment air temperature is a SLB. For the upper compartment, the initial containment average air temperature assumed in the design basis analyses (Ref. 1) is 100'F.

Since the SLB analysis is not sensitive to the initial upper compartment maximum air temperature, the application of error uncertainty is not necessary for the LCO. The SLB analysis is more sensitive to the initial lower compartment maximum air temperature. For the lower compartment, the maximum initial average containment air temperature assumed in the design basis analyses is 135°F. This resulted in a maximum containment air temperature of 317°F. The environmental qualification temperature limit is 341 OF. The maximum lower compartment air temperature accounts for instrument error uncertainty.

The temperature upper limits are used to establish the environmental qualification operating envelope for both containment compartments.

The maximum peak containment air temperature for both containment compartments was calculated to be within the current environmental qualification temperature limit during the transient. The basis of the containment environmental qualification temperature is to ensure the performance of safety related equipment inside containment (Ref. 2).

The temperature upper limits are also used in the depressurization analyses to ensure that the minimum pressure limit is maintained following an event which has the potential to result in a net external pressure on the containment.

The containment pressure transient is sensitive to the initial air mass in containment and, therefore, to the initial containment air temperature.

The limiting DBA for establishing the maximum peak containment internal pressure is a LOCA. The initial containment air temperature minimum limits of 70°F for the upper compartment and 950F for the lower compartment, are used in this analysis to ensure that, in the event of an accident, the maximum containment internal pressure will not be exceeded in either containment compartment. These minimum temperature limits account for instrument error uncertainty.

Containment average air temperature satisfies Criterion 2 of Catawba Units 1 and 2 B 3.6.5-2 Revision No. 3

Containment Air Temperature B 3.6.5 BASES APPLICABLE SAFETY ANALYSES (continued) 10 CFR 50.36 (Ref. 3).

LCO During a DBA, with an initial containment average air temperature within the LCO temperature limits, the resultant peak accident temperature is maintained below the containment environmental qualification temperature. As a result, the ability of containment to perform its design function is ensured. In MODES 2, 3, and 4, containment air temperature may be as low as 60°F because the resultant calculated peak containment accident pressure would not exceed the design pressure due to a lesser amount of energy released from the pipe break in these MODES.

APPLICABILITY In MODES 1, 2, 3, and 4, a DBA could cause a release of radioactive material to containment. In MODES 5 and 6, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining containment average air temperature within the limit is not required in MODE 5 or 6.

ACTIONS A.1 When containment average air temperature in the upper or lower compartment is not within the limit of the LCO, the average air temperature in the affected compartment must be restored to within limits within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. This Required Action is necessary to return operation to within the bounds of the containment analysis. The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time is acceptable considering the sensitivity of the analysis to variations in this parameter and provides sufficient time to correct minor problems.

B.1 and B.2 If the containment average air temperature cannot be restored to within its limits within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

Catawba Units 1 and 2 B 3.6.5-3 Revision No. 3

Containment Air Temperature B 3.6.5 BASES SURVEILLANCE SR 3.6.5.1 and SR 3.6.5.2 REQUIREMENTS Verifying that containment average air temperature is within the LCO limits ensures that containment operation remains within the limits assumed for the containment analyses. In order to determine the containment average air temperature, an arithmetical average of ambient air temperature monitoring stations is calculated using measurements taken at locations within the containment selected to provide a representative sample of the overall containment atmosphere. The upper compartment measurements are taken at approximately elevation 652 feet near the inlet of each operating upper containment ventilation unit.

The lower compartment measurements are taken at approximately elevation 573 feet near the inlet of each operating lower containment ventilation unit. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

REFERENCES

1.

UFSAR, Section 6.2.

2.

10 CFR 50.49.

3.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

Catawba Units 1 and 2 B 3.6.5-4 Revision No. 3

AC Sources-Operating B 3.8.1 B 3.8 ELECTRICAL POWER SYSTEMS B 3.8.1 AC Sources-Operating BASES BACKGROUND The unit Essential Auxiliary Power Distribution System AC sources consist of the offsite power sources (preferred power sources, normal and alternate(s)), and the onsite standby power sources (Train A and Train B diesel generators (DGs)). As required by 10 CFR 50, Appendix A, GDC 17 (Ref. 1), the design of the AC electrical power system provides independence and redundancy to ensure an available source of power to the Engineered Safety Feature (ESF) systems.

The onsite Class 1 E AC Distribution System is divided into redundant load groups (trains) so that the loss of any one group does not prevent the minimum safety functions from being performed. Each train has connections to two preferred offsite power sources and a single DG.

From the transmission network, two electrically and physically separated circuits provide AC power, through step down station auxiliary transformers, to the 4.16 kV ESF buses. A detailed description of the offsite power network and the circuits to the Class 1 E ESF buses is found in the UFSAR, Chapter 8 (Ref. 2).

A qualified offsite circuit consists of all breakers, transformers, switches, interrupting devices, cabling, and controls required to transmit power from the offsite transmission network to the onsite Class 1 E ESF bus(es).

Certain required unit loads are returned to service in a predetermined sequence in order to prevent overloading the transformer supplying offsite power to the onsite Class 1 E Distribution System. Within 1 minute after the initiating signal is received, all automatic and permanently connected loads needed to recover the unit or maintain it in a safe condition are returned to service via the load sequencer.

The onsite standby power source for each 4.16 kV ESF bus is a dedicated DG. DGs A and B are dedicated to ESF buses ETA and ETB, respectively. A DG starts automatically on a safety injection (SI) signal Catawba Units 1 and 2 B 3.8. 1-1 Revision No. 5

AC Sources-Operating B 3.8.1 BASES BACKGROUND (continued)

(i.e., low pressurizer pressure or high containment pressure signals) or on an ESF bus degraded voltage or undervoltage signal (refer to LCO 3.3.5, "Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation"). After the DG has started, it will automatically tie to its respective bus after offsite power is tripped as a consequence of ESF bus undervoltage or degraded voltage, independent of or coincident with an SI signal. With no SI signal, there is a 10 minute delay between degraded voltage signal and the DG start signal. The DGs will also start and operate in the standby mode without tying to the ESF bus on an SI signal alone. Following the trip of offsite power, a sequencer strips loads from the ESF bus. When the DG is tied to the ESF bus, loads are then sequentially connected to its respective ESF bus by the automatic load sequencer. The sequencing logic controls the permissive and starting signals to motor breakers to prevent overloading the DG by automatic load application.

In the event of a loss of preferred power, the ESF electrical loads are automatically connected to the DGs in sufficient time to provide for safe reactor shutdown and to mitigate the consequences of a Design Basis Accident (DBA) such as a loss of coolant accident (LOCA).

Certain required unit loads are returned to service in a predetermined sequence in order to prevent overloading the DG in the process.

Approximately 1 minute after the initiating signal is received, all loads needed to recover the unit or maintain it in a safe condition are returned to service.

Ratings for Train A and Train B DGs satisfy the requirements of Regulatory Guide 1.9 (Ref. 3). The continuous service rating of each DG is 7000 kW with 10% overload permissible for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period. The ESF loads that are powered from the 4.16 kV ESF buses are listed in Reference 2.

APPLICABLE The initial conditions of DBA and transient analyses in the UFSAR, SAFETY ANALYSES Chapter 6 (Ref. 4) and Chapter 15 (Ref. 5), assume ESF systems are OPERABLE. The AC electrical power sources are designed to provide sufficient capacity, capability, redundancy, and reliability to ensure the availability of necessary power to ESF systems so that the fuel, Reactor Coolant System (RCS), and containment design limits are not exceeded.

These limits are discussed in more detail in the Bases for Section 3.2, Power Distribution Limits; Section 3.4, Reactor Coolant System (RCS);

and Section 3.6, Containment Systems.

Catawba Units 1 and 2 B 3.8.1-2 Revision No. 5

AC Sources-Operating B 3.8.1 BASES APPLICABLE SAFETY ANALYSES (continued)

The OPERABILITY of the AC electrical power sources is consistent with the initial assumptions of the Accident analyses and is based upon meeting the design basis of the unit. This results in maintaining at least one train of the onsite or offsite AC sources OPERABLE during Accident conditions in the event of:

a.

An assumed loss of all offsite power or all onsite AC power; and

b.

A worst case single failure.

The AC sources satisfy Criterion 3 of 10 CFR 50.36 (Ref. 6).

LCO Two qualified circuits between the offsite transmission network and the onsite Essential Auxiliary Power System and separate and independent DGs for each train ensure availability of the required power to shut down the reactor and maintain it in a safe shutdown condition after an anticipated operational occurrence (AOO) or a postulated DBA.

Qualified offsite circuits are those that are described in the UFSAR and are part of the licensing basis for the unit.

In addition, one required automatic load sequencer per train must be OPERABLE.

Each offsite circuit must be capable of maintaining rated frequency and voltage, and accepting required loads during an accident, while connected to the ESF buses.

The 4.16 kV essential system is divided into two completely redundant and independent trains designated A and B, each consisting of one 4.16 kV switchgear assembly, three 4.16 kV/600 V transformers, two 600 V load centers, and associated loads.

Normally, each Class 1E 4.16 kV switchgear is powered from its associated non-Class 1 E train of the 6.9 kV Normal Auxiliary Power System as discussed in "6.9 kV Normal Auxiliary Power System" in Chapter 8 of the UFSAR (Ref. 2). Additionally, a standby source of power to each 4.16 kV essential switchgear, not required by General Design Criterion 17, is provided from the 6.9 kV system via two separate and independent 6.9/4.16 kV transformers. These transformers are shared between units and provide the capability to supply a standby Catawba Units 1 and 2 B 3.8.1-3 Revision No. 5

AC Sources-Operating B 3.8.1 BASES LCO (continued) source of preferred power to each unit's 4.16 kV essential switchgear from either unit's 6.9 kV system. A key interlock scheme is provided to preclude the possibility of connecting the two units together at either the 6.9 or 4.16 kV level.

Each train of the 4.16 kV Essential Auxiliary Power System is also provided with a separate and independent emergency diesel generator to supply the Class I E loads required to safely shut down the unit following a design basis accident. Additionally, each diesel generator is capable of supplying its associated 4.16 kV blackout switchgear through a connection with the 4.16 kV essential switchgear.

Each DG must be capable of starting, accelerating to rated speed and voltage, and connecting to its respective ESF bus on detection of bus undervoltage. This will be accomplished within 11 seconds. Each DG must also be capable of accepting required loads within the assumed loading sequence intervals, and continue to operate until offsite power can be restored to the ESF buses. These capabilities are required to be met from a variety of initial conditions such as DG in standby with the engine hot and DG in standby with the engine at ambient conditions.

Additional DG capabilities must be demonstrated to meet required Surveillance, e.g., capability of the DG to revert to standby status on an ECCS signal while operating in parallel test mode.

Proper sequencing of loads, including tripping of nonessential loads, is a required function for DG OPERABILITY.

The AC sources in one train must be separate and independent (to the extent possible) of the AC sources in the other train. For the DGs, separation and independence are complete.

For the offsite AC sources, separation and independence are provided to the extent practical.

APPLICABILITY The AC sources and sequencers are required to be OPERABLE in MODES 1, 2, 3, and 4 to ensure that:

a.

Acceptable fuel design limits and reactor coolant pressure boundary limits are not exceeded as a result of AOOs or abnormal transients; and Catawba Units 1 and 2 B 3.8.1-4 Revision No. 5

AC Sources-Operating B 3.8.1 BASES APPLICABILITY (continued)

b.

Adequate core cooling is provided and containment OPERABILITY and other vital functions are maintained in the event of a postulated DBA.

The AC power requirements for MODES 5 and 6 are covered in LCO 3.8.2, "AC Sources-Shutdown."

ACTIONS A Note prohibits the application of LCO 3.0.4.b to an inoperable DG.

There is an increased risk associated with entering a MODE or other specified condition in the Applicability with an inoperable DG and the provisions of LCO 3.0.4.b, which allow entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, should not be applied in this circumstance.

When entering Required Actions for inoperable offsite circuit(s) and/or DG(s), it is also necessary to enter the applicable Required Actions of any shared systems LCOs when either normal or emergency power to shared components governed by these LCOs becomes inoperable.

These LCOs include 3.7.8, "Nuclear Service Water System (NSWS)";

3.7.10, "Control Room Area Ventilation System (CRAVS)"; 3.7.11, "Control Room Area Chilled Water System (CRACWS)"; and 3.7.12, "Auxiliary Building Filtered Ventilation Exhaust System (ABFVES)".

A..1 To ensure a highly reliable power source remains with one offsite circuit inoperable, it is necessary to verify the OPERABILITY of the remaining required offsite circuit on a more frequent basis. Since the Required Action only specifies "perform," a failure of SR 3.8.1.1 acceptance criteria does not result in a Required Action not met. However, if a second required circuit fails SR 3.8.1.1, the second offsite circuit is inoperable, and Condition C, for two offsite circuits inoperable, is entered.

A.2 Required Action A.2, which only applies if the train cannot be powered from an offsite source, is intended to provide assurance that an event coincident with a single failure of the associated DG will not result in a complete loss of safety function of critical redundant required features.

These features are powered from the redundant AC electrical power Catawba Units 1 and 2 B 3.8.1-5 Revision No. 5

AC Sources-Operating B 3.8.1 BASES ACTIONS (continued) train. This includes motor driven auxiliary feedwater pumps. The turbine driven auxiliary feedwater pump is required to be considered a redundant required feature, and, therefore, required to be determined OPERABLE by this Required Action. Three independent AFW pumps are required to ensure the availability of decay heat removal capability for all events accompanied by a loss of offsite power and a single failure. System design is such that the remaining OPERABLE motor driven auxiliary feedwater pump is not by itself capable of providing 100% of the auxiliary feedwater flow assumed in the safety analysis.

The Completion Time for Required Action A.2 is intended to allow the operator time to evaluate and repair any discovered inoperabilities. This Completion Time also allows for an exception to the normal "time zero" for beginning the allowed outage time "clock." In this Required Action, the Completion Time only begins on discovery that both:

a.

The train has no offsite power supplying it loads; and

b.

A required feature on the other train is inoperable.

If at any time during the existence of Condition A (one offsite circuit inoperable) a redundant required feature subsequently becomes inoperable, this Completion Time begins to be tracked.

Discovering no offsite power to one train of the onsite Class 1 E Electrical Power Distribution System coincident with one or more inoperable required support or supported features, or both, that are associated with the other train that has offsite power, results in starting the Completion Times for the Required Action. Twenty-four hours is acceptable because it minimizes risk while allowing time for restoration before subjecting the unit to transients associated with shutdown.

The remaining OPERABLE offsite circuit and DGs are adequate to supply electrical power to Train A and Train B of the onsite Class 1 E Distribution System. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time takes into account the component OPERABILITY of the redundant counterpart to the inoperable required feature. Additionally, the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time takes into account the capacity and capability of the remaining AC sources, a reasonable time for repairs, and the low probability of a DBA occurring during this period.

A.3 According to Regulatory Guide 1.93 (Ref. 7), operation may continue in Catawba Units 1 and 2 B 3.8.1-6 Revision No. 5

AC Sources-Operating B 3.8.1 BASES ACTIONS (continued)

Condition A for a period that should not exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. With one offsite circuit inoperable, the reliability of the offsite system is degraded, and the potential for a loss of offsite power is increased, with attendant potential for a challenge to the unit safety systems. In this Condition, however, the remaining OPERABLE offsite circuit and DGs are adequate to supply electrical power to the onsite Class 1E Distribution System.

The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time takes into account the capacity and capability of the remaining AC sources, a reasonable time for repairs, and the low probability of a DBA occurring during this period.

The second Completion Time for Required Action A.3 establishes a limit on the maximum time allowed for any combination of required AC power sources to be inoperable during any single contiguous occurrence of failing to meet the LCO. If Condition A is entered while, for instance, a DG is inoperable and that DG is subsequently returned OPERABLE, the LCO may already have been not met for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This could lead to a total of 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br />, since initial failure to meet the LCO, to restore the offsite circuit. At this time, a DG could again become inoperable, the circuit restored OPERABLE, and an additional 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (for a total of 9 days) allowed prior to complete restoration of the LCO. The 6 day Completion Time provides a limit on the time allowed in a specified condition after discovery of failure to meet the LCO. This limit is considered reasonable for situations in which Conditions A and B are entered concurrently. The "AND" connector between the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and 6 day Completion Times means that both Completion Times apply simultaneously, and the more restrictive Completion Time must be met.

As in Required Action A.2, the Completion Time allows for an exception to the normal "time zero" for beginning the allowed outage time "clock."

This will result in establishing the "time zero" at the time that the LCO was initially not met, instead of at the time Condition A was entered.

B._1 To ensure a highly reliable power source remains with an inoperable DG, it is necessary to verify the availability of the offsite circuits on a more frequent basis. Since the Required Action only specifies "perform," a failure of SR 3.8.1.1 acceptance criteria does not result in a Required Action being not met. However, if a circuit fails to pass SR 3.8.1.1, it is inoperable. Upon offsite circuit inoperability, additional Conditions and Required Actions must then be entered.

Catawba Units 1 and 2 B 3.8.1-7 Revision No. 5

AC Sources-Operating B 3.8.1 BASES ACTIONS (continued)

B.2 Required Action B.2 is intended to provide assurance that a loss of offsite power, during the period that a DG is inoperable, does not result in a complete loss of safety function of critical systems. These features are designed with redundant safety related trains. This includes motor driven auxiliary feedwater pumps. The turbine driven auxiliary feedwater pump is required to be considered a redundant required feature, and, therefore, required to be determined OPERABLE by this Required Action. Three independent AFW pumps are required to ensure the availability of decay heat removal capability for all events accompanied by a loss of offsite power and a single failure. System design is such that the remaining OPERABLE motor driven auxiliary feedwater pump is not by itself capable of providing 100% of the auxiliary feedwater flow assumed in the safety analysis. Redundant required feature failures consist of inoperable features associated with a train, redundant to the train that has an inoperable DG.

The Completion Time for Required Action B.2 is intended to allow the operator time to evaluate and repair any discovered inoperabilities. This Completion Time also allows for an exception to the normal "time zero" for beginning the allowed outage time "clock." In this Required Action, the Completion Time only begins on discovery that both:

a.

An inoperable DG exists; and

b.

A required feature on the other train (Train A or Train B) is inoperable.

If at any time during the existence of this Condition (one DG inoperable) a required feature subsequently becomes inoperable, this Completion Time would begin to be tracked.

Discovering one required DG inoperable coincident with one or more inoperable required support or supported features, or both, that are associated with the OPERABLE DG, results in starting the Completion Time for the Required Action. Four hours from the discovery of these events existing concurrently is Acceptable because it minimizes risk while allowing time for restoration before subjecting the unit to transients associated with shutdown.

In this Condition, the remaining OPERABLE DG and offsite circuits are adequate to supply electrical power to the onsite Class 1 E Distribution System. Thus, on a component basis, single failure protection for the required feature's function may have been lost; however, function has not Catawba Units 1 and 2 B 3.8.1-8 Revision No. 5

AC Sources-Operating B 3.8.1 BASES ACTIONS (continued) been lost. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time takes into account the OPERABILITY of the redundant counterpart to the inoperable required feature. Additionally, the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time takes into account the capacity and capability of the remaining AC sources, a reasonable time for repairs, and the low probability of a DBA occurring during this period.

B.3.1 and B.3.2 Required Action B.3.1 provides an allowance to avoid unnecessary testing of OPERABLE DG(s). If it can be determined that the cause of the inoperable DG does not exist on the OPERABLE DG, SR 3.8.1.2 does not have to be performed. If the cause of inoperability exists on other DG(s), the other DG(s) would be declared inoperable upon discovery and Condition E of LCO 3.8.1 would be entered. Once the failure is repaired, the common cause failure no longer exists, and Required Action B.3.1 is satisfied. If the cause of the initial inoperable DG cannot be confirmed not to exist on the remaining DG(s),

performance of SR 3.8.1.2 suffices to provide assurance of continued OPERABILITY of that DG.

In the event the inoperable DG is restored to OPERABLE status prior to completing either B.3.1 or B.3.2, the problem investigation process will continue to evaluate the common cause possibility. This continued evaluation, however, is no longer under the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> constraint imposed while in Condition B.

These Conditions are not required to be entered if the inoperability of the DG is due to an inoperable support system, an independently testable component, or preplanned testing or maintenance. If required, these Required Actions are to be completed regardless of when the inoperable DG is restored to OPERABLE status.

According to Generic Letter 84-15 (Ref. 8), 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is reasonable to confirm that the OPERABLE DG(s) is not affected by the same problem as the inoperable DG.

B.4 According to Regulatory Guide 1.93 (Ref. 7), operation may continue in Condition B for a period that should not exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

In Condition B, the remaining OPERABLE DG and offsite circuits are adequate to supply electrical power to the onsite Class 1 E Distribution Catawba Units 1 and 2 B 3.8.1-9 Revision No. 5

AC Sources-Operating B 3.8.1 BASES ACTIONS (continued)

System. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time takes into account the capacity and capability of the remaining AC sources, a reasonable time for repairs, and the low probability of a DBA occurring during this period.

The second Completion Time for Required Action B.4 establishes a limit on the maximum time allowed for any combination of required AC power sources to be inoperable during any single contiguous occurrence of failing to meet the LCO. If Condition B is entered while, for instance, an offsite circuit is inoperable and that circuit is subsequently restored OPERABLE, the LCO may already have been not met for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

This could lead to a total of 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br />, since initial failure to meet the LCO, to restore the DG. At this time, an offsite circuit could again become inoperable, the DG restored OPERABLE, and an additional 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (for a total of 9 days) allowed prior to complete restoration of the LCO. The 6 day Completion Time provides a limit on time allowed in a specified condition after discovery of failure to meet the LCO. This limit is considered reasonable for situations in which Conditions A and B are entered concurrently. The "AND" connector between the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and 6 day Completion Times means that both Completion Times apply simultaneously, and the more restrictive Completion Time must be met.

As in Required Action B.2, the Completion Time allows for an exception to the normal "time zero" for beginning the allowed time "clock." This will result in establishing the "time zero" at the time that the LCO was initially not met, instead of at the time Condition B was entered.

C.1 and C.2 Required Action C.1, which applies when two offsite circuits are inoperable, is intended to provide assurance that an event with a coincident single failure will not result in a complete loss of redundant required safety functions. The Completion Time for this failure of redundant required features is reduced to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from that allowed for one train without offsite power (Required Action A.2). The rationale for the reduction to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is that Regulatory Guide 1.93 (Ref. 7) allows a Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for two required offsite circuits inoperable, based upon the assumption that two complete safety trains are OPERABLE. When a concurrent redundant required feature failure exists, this assumption is not the case, and a shorter Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is appropriate. These features are powered from redundant AC safety trains. This includes motor driven auxiliary feedwater pumps.

Single train features, such as turbine driven auxiliary pumps, are not included in the list.

Catawba Units 1 and 2 B 3.8.1-10 Revision No. 5

AC Sources-Operating B 3.8.1 BASES ACTIONS (continued)

The Completion Time for Required Action C.1 is intended to allow the operator time to evaluate and repair any discovered inoperabilities. This Completion Time also allows for an exception to the normal "time zero" for beginning the allowed outage time "clock." In this Required Action the Completion Time only begins on discovery that both:

a.

All required offsite circuits are inoperable; and

b.

A required feature is inoperable.

If at any time during the existence of Condition C (two offsite circuits inoperable) a required feature becomes inoperable, this Completion Time begins to be tracked.

According to Regulatory Guide 1.93 (Ref. 7), operation may continue in Condition C for a period that should not exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This level of degradation means that the offsite electrical power system does not have the capability to effect a safe shutdown and to mitigate the effects of an accident; however, the onsite AC sources have not been degraded. This level of degradation generally corresponds to a total loss of the immediately accessible offsite power sources.

Because of the normally high availability of the offsite sources, this level of degradation may appear to be more severe than other combinations of two AC sources inoperable that involve one or more DGs inoperable.

However, two factors tend to decrease the severity of this level of degradation:

a.

The configuration of the redundant AC electrical power system that remains available is not susceptible to a single bus or switching failure; and

b.

The time required to detect and restore an unavailable offsite power source is generally much less than that required to detect and restore an unavailable onsite AC source.

With both of the required offsite circuits inoperable, sufficient onsite AC sources are available to maintain the unit in a safe shutdown condition in the event of a DBA or transient. In fact, a simultaneous loss of offsite AC sources, a LOCA, and a worst case single failure were postulated as a part of the design basis in the safety analysis. Thus, the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time provides a period of time to effect restoration of one of Catawba Units 1 and 2 B 3.8.1-11 Revision No. 5

AC Sources-Operating B 3.8.1 BASES ACTIONS (continued) the offsite circuits commensurate with the importance of maintaining an AC electrical power system capable of meeting its design criteria.

According to Reference 6, with the available offsite AC sources, two less than required by the LCO, operation may continue for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If two offsite sources are restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unrestricted operation may continue. If only one offsite source is restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, power operation continues in accordance with Condition A.

D.1 and D.2 Pursuant to LCO 3.0.6, the Distribution System ACTIONS would not be entered even if all AC sources to it were inoperable, resulting in de-energization. Therefore, the Required Actions of Condition D are modified by a Note to indicate that when Condition D is entered with no AC source to any train, the Conditions and Required Actions for LCO 3.8.9, "Distribution Systems-Operating," must be immediately entered. This allows Condition D to provide requirements for the loss of one offsite circuit and one DG, without regard to whether a train is de-energized. LCO 3.8.9 provides the appropriate restrictions for a de-energized train.

According to Regulatory Guide 1.93 (Ref. 7), operation may continue in Condition D for a period that should not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

In Condition D, individual redundancy is lost in both the offsite electrical power system and the onsite AC electrical power system. Since power system redundancy is provided by two diverse sources of power, however, the reliability of the power systems in this Condition may appear higher than that in Condition C (loss of both required offsite circuits).

This difference in reliability is offset by the susceptibility of this power system configuration to a single bus or switching failure. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time takes into account the capacity and capability of the remaining AC sources, a reasonable time for repairs, and the low probability of a DBA occurring during this period.

E..1 With Train A and Train B DGs inoperable, there are no remaining standby AC sources. Thus, with an assumed loss of offsite electrical power, insufficient standby AC sources are available to power the Catawba Units 1 and 2 B 3.8.1-12 Revision No. 5

AC Sources-Operating B 3.8.1 BASES ACTIONS (continued) minimum required ESF functions. Since the offsite electrical power system is the only source of AC power for this level of degradation, the risk associated with continued operation for a very short time could be less than that associated with an immediate controlled shutdown (the immediate shutdown could cause grid instability, which could result in a total loss of AC power). Since any inadvertent generator trip could also result in a total loss of offsite AC power, however, the time allowed for continued operation is severely restricted. The intent here is to avoid the risk associated with an immediate controlled shutdown and to minimize the risk associated with this level of degradation.

According to Reference 7, with both DGs inoperable, operation may continue for a period that should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

F. 1 The sequencer(s) is an essential support system to both the offsite circuit and the DG associated with a given ESF bus. Furthermore, the sequencer is on the primary success path for most major AC electrically powered safety systems powered from the associated ESF bus.

Therefore, loss of an ESF bus sequencer affects every major ESF system in the train. When a sequencer is inoperable, its associated unit and train related offsite circuit and DG must also be declared inoperable and their corresponding Conditions must also be entered. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time provides a period of time to correct the problem commensurate with the importance of maintaining sequencer OPERABILITY. This time period also ensures that the probability of an accident (requiring sequencer OPERABILITY) occurring during periods when the sequencer is inoperable is minimal.

G.1 and G.2 If the inoperable AC electric power sources cannot be restored to OPERABLE status within the required Completion Time, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging plant systems.

Catawba Units 1 and 2 B 3.8.1-13 Revision No. 5

AC Sources-Operating B 3.8.1 BASES ACTIONS (continued)

H._1 Condition H corresponds to a level of degradation in which all redundancy in the AC electrical power supplies has been lost. At this severely degraded level, any further losses in the AC electrical power system will cause a loss of function. Therefore, no additional time is justified for continued operation. The unit is required by LCO 3.0.3 to commence a controlled shutdown.

SURVEILLANCE REQUIREMENTS The AC sources are designed to permit inspection and testing of all important areas and features, especially those that have a standby function, in accordance with 10 CFR 50, Appendix A, GDC 18 (Ref. 9).

Periodic component tests are supplemented by extensive functional tests during refueling outages (under simulated accident conditions). The SRs for demonstrating the OPERABILITY of the DGs are in accordance with the recommendations of Regulatory Guide 1.9 (Ref. 3), Regulatory Guide 1.108 (Ref. 10), and Regulatory Guide 1.137 (Ref. 11), as addressed in the UFSAR.

Where the SRs discussed herein specify voltage and frequency tolerances, the following is applicable. The minimum steady state output voltage of 3950 V is 95% of the nominal 4160 V output voltage. This value allows for voltage drop to the terminals of 4000 V motors whose minimum operating voltage is specified as 90% or 3600 V. It also allows for voltage drops to motors and other equipment down through the 120 V level where minimum operating voltage is also usually specified as 90%

of name plate rating.

The specified maximum steady state output voltage of 4580 V is equal to the maximum operating voltage specified for 4000 V motors. It ensures that for a lightly loaded distribution system, the voltage at the terminals of 4000 V motors is no more than the maximum rated operating voltages.

The specified minimum and maximum frequencies of the DG are 58.8 Hz and 61.2 Hz, respectively. These values are equal to +/- 2% of the 60 Hz nominal frequency and are derived from the recommendations given in Regulatory Guide 1.9 (Ref. 3).

Catawba Units 1 and 2 B 3.8.1-14 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.1.

This SR ensures proper circuit continuity for the offsite AC electrical power supply to the onsite distribution network and availability of offsite AC electrical power. The breaker alignment verifies that each breaker is in its correct position to ensure that distribution buses and loads are connected to their preferred power source, and that appropriate independence of offsite circuits is maintained. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

SR 3.8.1.2 and SR 3.8.1.7 These SRs help to ensure the availability of the standby electrical power supply to mitigate DBAs and transients and to maintain the unit in a safe shutdown condition.

To minimize the wear on moving parts that do not get lubricated when the engine is not running, these SRs are modified by a Note (Note 2 for SR 3.8.1.2) to indicate that all DG starts for these Surveillances may be preceded by an engine prelube period and followed by a warmup period prior to loading.

For the purposes of SR 3.8.1.2 and SR 3.8.1.7 testing, the DGs are started from standby conditions using a manual start, loss of offsite power signal, safety injection signal, or loss of offsite power coincident with a safety injection signal. Standby conditions for a DG mean that the diesel engine coolant and oil are being continuously circulated and temperature is being maintained consistent with manufacturer recommendations.

In order to reduce stress and wear on diesel engines, the manufacturer recommends a modified start in which the starting speed of DGs is limited, warmup is limited to this lower speed, and the DGs are gradually accelerated to synchronous speed prior to loading. These start procedures are the intent of Note 3, which is only applicable when such modified start procedures are recommended by the manufacturer.

Catawba Units 1 and 2 B 3.8.1-15 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.7 requires that the DG starts from standby conditions and achieves required voltage and frequency within 11 seconds. The 11 second start requirement supports the assumptions of the design basis LOCA analysis in the UFSAR, Chapter 15 (Ref. 5).

The 11 second start requirement is not applicable to SR 3.8.1.2 (see Note 3) when a modified start procedure as described above is used. If a modified start is not used, the 11 second start requirement of SR 3.8.1.7 applies.

Since SR 3.8.1.7 requires a 11 second start, it is more restrictive than SR 3.8.1.2, and it may be performed in lieu of SR 3.8.1.2. This is the intent of Note 1 of SR 3.8.1.2.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

SR 3.8.1.3 This Surveillance verifies that the DGs are capable of synchronizing with the offsite electrical system and accepting loads greater than or equal to the equivalent of the maximum expected accident loads. A minimum run time of 60 minutes is required to stabilize engine temperatures, while minimizing the time that the DG is connected to the offsite source.

Although no power factor requirements are established by this SR, the DG is normally operated at a power factor between 0.8 lagging and 1.0.

The 0.8 value is the design rating of the machine, while the 1.0 is an operational limitation to ensure circulating currents are minimized. The load band is provided to avoid routine overloading of the DG. Routine overloading may result in more frequent teardown inspections in accordance with vendor recommendations in order to maintain DG OPERABILITY.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

This SR is modified by four Notes. Note I indicates that diesel engine runs for this Surveillance may include gradual loading, as recommended Catawba Units 1 and 2 B 3.8.1-16 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued) by the manufacturer, so that mechanical stress and wear on the diesel engine are minimized. Note 2 states that momentary transients, because of changing bus loads, do not invalidate this test. Similarly, momentary power factor transients above the limit do not invalidate the test. Note 3 indicates that this Surveillance should be conducted on only one DG at a time in order to avoid common cause failures that might result from offsite circuit or grid perturbations. Note 4 stipulates a prerequisite requirement for performance of this SR. A successful DG start must precede this test to credit satisfactory performance.

SR 3.8.1.4 This SR provides verification that the level of fuel oil in the day tank is at or above the level at which fuel oil is automatically added. The level is expressed as an equivalent volume in gallons, and is selected to ensure adequate fuel oil for a minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of DG operation at full load plus 10%.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

SR 3.8.1.5 Microbiological fouling is a major cause of fuel oil degradation. There are numerous bacteria that can grow in fuel oil and cause fouling, but all must have a water environment in order to survive. Removal of water from the fuel oil day tanks eliminates the necessary environment for bacterial survival. This is the most effective means of controlling microbiological fouling. In addition, it eliminates the potential for water entrainment in the fuel oil during DG operation. Water may come from any of several sources, including condensation, ground water, rain water, contaminated fuel oil, and breakdown of the fuel oil by bacteria. Frequent checking for and removal of accumulated water minimizes fouling and provides data regarding the watertight integrity of the fuel oil system. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. This SR is for preventative maintenance.

The presence of water does not necessarily represent failure of this SR, provided the accumulated water is removed during the performance of this Surveillance.

Catawba Units 1 and 2 B 3.8.1-17 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.6 This Surveillance demonstrates that each required fuel oil system operates and transfers fuel oil from its associated storage tanks to its associated day tank. This is required to support continuous operation of standby power sources. This Surveillance provides assurance that the fuel oil valve is OPERABLE, and allows gravity feed of fuel oil to the day tank from underground storage tanks, to ensure the fuel oil piping system is intact, the fuel delivery piping is not obstructed, and the controls and control systems for fuel transfer systems are OPERABLE.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

SR 3.8.1.7 See SR 3.8.1.2.

SR 3.8.1.8 Transfer of each 4.16 kV ESF bus power supply from the normal offsite circuit to the alternate offsite circuit demonstrates the capability of the alternate circuit distribution network to power the shutdown loads. The alternate circuit distribution network consists of an offsite power source through a 6.9 kV bus incoming breaker, its associated 6.9 kV bus tie breaker and the aligned 6.9/4.16 kV transformer to the essential bus.

The requirement of this SR is the transfer from the normal offsite circuit to the alternate offsite circuit via the automatic and manual actuation of the 6.9 kV bus tie breaker and 6.9 kV bus incoming breakers upon loss of the normal offsite source that is being credited. The 6.9 kV bus tie breaker provides a means for each of the offsite circuits to act as a backup in the event power is not available from one of the circuits. The Catawba power system design, without the tie breaker, meets all GDC 17 requirements as well as all other standards to which Catawba is committed. If the tie breaker is incapable of closing manually or automatically during its required MODE of applicability, then the Surveillance is not met and the normal offsite circuit that supplies that Class 1 E ESF bus is inoperable and the applicable Condition shall be entered and the Required Actions shall be performed. Table B 3.8.1-1 identifies the offsite circuit affected by a non-functioning tie breaker.

Catawba Units 1 and 2 B 3.8.1-18 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

The intent of the tie breaker is to provide an alternate means of power to a Class 1 E ESF bus; this assumes there are two available offsite circuits.

In the event an offsite circuit is lost for any reason, the function of the tie breaker is to close, and the offsite circuit that is supplying its normally connected Class 1E ESF bus is fully OPERABLE. With the tie breaker closed, then both Class 1 E ESF buses are provided power from a single offsite circuit, The normally connected offsite circuit of the Class 1 E ESF bus that is being supplied through the tie breaker shall be declared inoperable and the applicable Condition shall be entered and the Required Actions shall be performed. If the tie breaker does not close, then the associated Class 1 E ESF bus will be supplied power from its associated DG. In this event, the associated offsite circuit is inoperable and the applicable Condition shall be entered and the Required Actions shall be performed. Capability of manually swapping to a standby transformer is not required to satisfy this SR. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

Catawba Units 1 and 2 B 3.8.1-19 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

Table B 3.8.1-1 (page 1 of 1)

Relationship between Tie Breakers and Offsite Circuits Tie Breaker Description Essential Load Center and Affected Offsite Transformer Circuit 1TA-7 7kV Bus 1TA 1ETA from 1ATC Tie Breaker 1TC-7 7kV Bus 1TC 1 ETA from SATA from Unit 1 Tie Breaker 1A 2TC-7 7kV Bus 2TC 1 ETA from SATA from Unit 2 Tie Breaker 1TD-7 7kV Bus 1TD 1ETB from 1ATD Tie Breaker 1TB-7 7kV Bus 1TB 1ETB from SATB from Unit 1 Tie Breaker 1B 2TB-7 7kV Bus 2TB 1 ETB from SATB from Unit 2 Tie Breaker 2TA-7 7kV Bus 2TA 2ETA from 2ATC Tie Breaker 1TC-7 7kV Bus 1TC 2ETA from SATA from Unit 1 Tie Breaker 2A 2TC-7 7kV Bus 2TC 2ETA from SATA from Unit 2 Tie Breaker 2TD-7 7kV Bus 2TD 2ETB from 2ATD Tie Breaker 1TB-7 7kV Bus 1TB 2ETB from SATB from Unit 1 2B Tie Breaker 2TB-7 7kV Bus 2TB 2ETB from SATB from Unit 2 Tie Breaker Catawba Units 1 and 2 B 3.8.1-20 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.9 Each DG is provided with an engine overspeed trip to prevent damage to the engine. Recovery from the transient caused by the loss of a large load could cause diesel engine overspeed, which, if excessive, might result in a trip of the engine. This Surveillance demonstrates the DG load response characteristics and capability to reject the largest single load without exceeding predetermined voltage and frequency and while maintaining a specified margin to the overspeed trip. For this unit, the single load for each DG and its horsepower rating is as follows: Nuclear Service Water pump which is a 1000 H.P. motor. This Surveillance may be accomplished by:

a.

Tripping the DG output breaker with the DG carrying greater than or equal to its associated single largest post-accident load while paralleled to offsite power, or while solely supplying the bus; or

b.

Tripping its associated single largest post-accident load with the DG solely supplying the bus.

As required by Regulatory Guide 1.9 (Ref. 3), the load rejection test is acceptable if the increase in diesel speed does not exceed 75% of the difference between synchronous speed and the overspeed trip setpoint.

The value of 63 Hz has been selected for the frequency limit for the load rejection and it is a more conservative limit than required by Reference 3.

The time, voltage, and frequency tolerances specified in this SR are derived from Regulatory Guide 1.9 (Ref. 3) recommendations for response during load sequence intervals. The 3 seconds specified is equal to 60% of a typical 5 second load sequence interval associated with sequencing of the largest load. The voltage and frequency specified are consistent with the design range of the equipment powered by the DG. SR 3.8.1.9.a corresponds to the maximum frequency excursion, while SR 3.8.1.9.b and SR 3.8.1.9.c are steady state voltage and frequency values to which the system must recover following load rejection. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

This SR is modified by a Note. In order to ensure that the DG is tested under load conditions that are as close to design basis conditions as possible, the Note requires that, if synchronized to offsite power, testing must be performed using a power factor _* 0.9. This power factor is chosen to be representative of the actual design basis inductive loading that the DG would experience.

Catawba Units 1 and 2 B 3.8.1-21 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.10 This Surveillance demonstrates the DG capability to reject a full load without overspeed tripping or exceeding the predetermined voltage limits.

The DG full load rejection may occur because of a system fault or inadvertent breaker tripping. This Surveillance ensures proper engine generator load response under the simulated test conditions. This test simulates the loss of the total connected load that the DG experiences following a full load rejection and verifies that the DG does not trip upon loss of the load. These acceptance criteria provide for DG damage protection. While the DG is not expected to experience this transient during an event and continues to be available, this response ensures that the DG is not degraded for future application, including reconnection to the bus if the trip initiator can be corrected or isolated.

Although not representative of the design basis inductive loading that the DG would experience, a power factor of approximately unity (1.0) is used for testing. This power factor is chosen in accordance with manufacturer's recommendations to minimize DG overvoltage damage during testing.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

SR 3.8.1.11 As required by Regulatory Guide 1.108 (Ref. 10), paragraph 2.a.(1), this Surveillance demonstrates the as designed operation of the standby power sources during loss of the offsite source. This test verifies all actions encountered from the loss of offsite power, including shedding of the nonessential loads and energization of the emergency buses and respective loads from the DG. It further demonstrates the capability of the DG to automatically achieve the required voltage and frequency within the specified time.

The DG autostart time of 11 seconds is derived from requirements of the accident analysis to respond to a design basis large break LOCA. The Surveillance should be continued for a minimum of 5 minutes in order to demonstrate that all starting transients have decayed and stability is achieved.

Catawba Units 1 and 2 B 3.8.1-22 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

The requirement to verify the connection and power supply of the emergency bus and autoconnected loads is intended to satisfactorily show the relationship of these loads to the DG loading logic. In certain circumstances, many of these loads cannot actually be connected or loaded without undue hardship or potential for undesired operation. For instance, Emergency Core Cooling Systems (ECCS) injection valves are not desired to be stroked open, or high pressure injection systems are not capable of being operated at full flow, or residual heat removal (RHR) systems performing a decay heat removal function are not desired to be realigned to the ECCS mode of operation. In lieu of actual demonstration of connection and loading of loads, testing that adequately shows the capability of the DG systems to perform these functions is acceptable.

This testing may include any series of sequential, overlapping, or total steps so that the entire connection and loading sequence is verified.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

This SR is modified by two Notes. The reason for Note 1 is to minimize wear and tear on the DGs during testing. For the purpose of this testing, the DGs must be started from standby conditions, that is, with the engine coolant and oil continuously circulated and temperature maintained consistent with manufacturer recommendations. The reason for Note 2 is that performing the Surveillance would remove a required offsite circuit from service, perturb the electrical distribution system, and challenge safety systems.

SR 3.8.1.12 This Surveillance demonstrates that the DG automatically starts and achieves the required voltage and frequency within the specified time (11 seconds) from the design basis actuation signal (LOCA signal) and operates for >_ 5 minutes. The 5 minute period provides sufficient time to demonstrate stability. SR 3.8.1.12.d ensures that the emergency bus remains energized from the offsite electrical power system on an ESF signal without loss of offsite power.

Catawba Units 1 and 2 B 3.8.1-23 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. This SR is modified by a Note.

The reason for the Note is to minimize wear and tear on the DGs during testing. For the purpose of this testing, the DGs must be started from standby conditions, that is, with the engine coolant and oil continuously circulated and temperature maintained consistent with manufacturer recommendations.

SR 3.8.1.13 This Surveillance demonstrates that DG non-emergency protective functions (e.g., high jacket water temperature) are bypassed on a loss of voltage signal concurrent with an ESF actuation test signal. Non-emergency automatic trips are all automatic trips except:

a.

Engine overspeed;

b.

Generator differential current;

c.

Low - low lube oil pressure; and

d.

Voltage control overcurrent relay scheme.

The non-emergency trips are bypassed during DBAs and provide an alarm on an abnormal engine condition. This alarm provides the operator with sufficient time to react appropriately. The DG availability to mitigate the DBA is more critical than protecting the engine against minor problems that are not immediately detrimental to emergency operation of the DG. Currently, DG emergency automatic trips are tested periodically per the station periodic maintenance program.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

SR 3.8.1.14 Regulatory Guide 1.108 (Ref. 10), paragraph 2.a.(3), requires demonstration that the DGs can start and run continuously at full load Catawba Units 1 and 2 B 3.8.1-24 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued) capability for an interval of not less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The DG starts for this Surveillance can be performed either from standby or hot conditions. The provisions for prelubricating and warmup, discussed in SR 3.8.1.2, and for gradual loading, discussed in SR 3.8.1.3, are applicable to this SR.

In order to ensure that the DG is tested under load conditions that are as close to design conditions as possible, testing must be performed using a power factor of < 0.9. This power factor is chosen to be representative of the actual design basis inductive loading that the DG would experience.

The load band is provided to avoid routine overloading of the DG.

Routine overloading may result in more frequent teardown inspections in accordance with vendor recommendations in order to maintain DG OPERABILITY.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

This Surveillance is modified by a Note. The Note states that momentary transients due to changing bus loads do not invalidate this test. Similarly, momentary power factor transients above the power factor limit will not invalidate the test.

SR 3.8.1.15 This Surveillance demonstrates that the diesel engine can restart from a hot condition, such as subsequent to shutdown from normal Surveillances, and achieve the required voltage and frequency within 11 seconds. The 11 second time is derived from the requirements of the accident analysis to respond to a design basis large break LOCA. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

This SR is modified by two Notes. Note 1 ensures that the test is performed with the diesel sufficiently hot. The load band is provided to Catawba Units 1 and 2 B 3.8.1-25 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued) avoid routine overloading of the DG. Routine overloads may result in more frequent teardown inspections in accordance with vendor recommendations in order to maintain DG OPERABILITY. The requirement that the diesel has operated for at least an hour at full load conditions prior to performance of this Surveillance is based on manufacturer recommendations for achieving hot conditions. Momentary transients due to changing bus loads do not invalidate this test. Note 2 allows all DG starts to be preceded by an engine prelube period to minimize wear and tear on the diesel during testing.

SR 3.8.1.16 As required by Regulatory Guide 1.108 (Ref. 10), paragraph 2.a.(6), this Surveillance ensures that the manual synchronization and automatic load transfer from the DG to the offsite source can be made and the DG can be returned to standby operation when offsite power is restored. It also ensures that the autostart logic is reset to allow the DG to reload if a subsequent loss of offsite power occurs. The DG is considered to be in standby operation when the DG is at rated speed and voltage, the output breaker is open and can receive an autoclose signal on bus undervoltage, and the load sequence timers are reset.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

This SR is modified by a Note. The reason for the Note is that performing the Surveillance would remove a required offsite circuit from service, perturb the electrical distribution system, and challenge safety systems.

SR 3.8.1.17 Demonstration of the test mode override ensures that the DG availability under accident conditions will not be compromised as the result of testing and the DG will automatically reset to standby operation if a LOCA actuation signal is received during operation in the test mode. Standby operation is defined as the DG running at rated speed and voltage with the DG output breaker open. These provisions for automatic switchover are required by Regulatory Guide 1.9 (Ref. 3).

Catawba Units 1 and 2 B 3.8.1-26 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

The requirement to automatically energize the emergency loads with offsite power is essentially identical to that of SR 3.8.1.12. The intent in the requirement associated with SR 3.8.1.17.b is to show that the emergency loading was not affected by the DG operation in test mode.

In lieu of actual demonstration of connection and loading of loads, testing that adequately shows the capability of the emergency loads to perform these functions is acceptable. This testing may include any series of sequential, overlapping, or total steps so that the entire connection and loading sequence is verified.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

This SR is modified by a Note. The reason for the Note is that performing the Surveillance would remove a required offsite circuit from service, perturb the electrical distribution system, and challenge safety systems.

SR 3.8.1.18 Under accident and loss of offsite power conditions loads are sequentially connected to the bus by the automatic load sequencer. The sequencing logic controls the permissive and starting signals to motor breakers to prevent overloading of the DGs due to high motor starting currents. The load sequence time interval tolerance in Table 8-6 of Reference 2 ensures that sufficient time exists for the DG to restore frequency and voltage prior to applying the next load and that safety analysis assumptions regarding ESF equipment time delays are not violated.

Table 8-6 of Reference 2 provides a summary of the automatic loading of ESF buses.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

Catawba Units 1 and 2 B 3.8.1-27 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.8.1.19 In the event of a DBA coincident with a loss of offsite power, the DGs are required to supply the necessary power to ESF systems so that the fuel, RCS, and containment design limits are not exceeded.

This Surveillance demonstrates the DG operation, as discussed in the Bases for SR 3.8.1.11, during a loss of offsite power actuation test signal in conjunction with an ESF actuation signal. In lieu of actual demonstration of connection and loading of loads, testing that adequately shows the capability of the DG system to perform these functions is acceptable. This testing may include any series of sequential, overlapping, or total steps so that the entire connection and loading sequence is verified.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

This SR is modified by two Notes. The reason for Note 1 is to minimize wear and tear on the DGs during testing. For the purpose of this testing, the DGs must be started from standby conditions, that is, with the engine coolant and oil continuously circulated and temperature maintained consistent with manufacturer recommendations for DGs. The reason for Note 2 is that the performance of the Surveillance would remove a required offsite circuit from service, perturb the electrical distribution system, and challenge safety systems.

SR 3.8.1.20 This Surveillance demonstrates that the DG starting independence has not been compromised. Also, this Surveillance demonstrates that each engine can achieve proper speed within the specified time when the DGs are started simultaneously.

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

This SR is modified by a Note. The reason for the Note is to minimize wear on the DG during testing. For the purpose of this testing, the DGs Catawba Units 1 and 2 B 3.8.1-28 Revision No. 5

AC Sources-Operating B 3.8.1 BASES SURVEILLANCE REQUIREMENTS (continued) must be started from standby conditions, that is, with the engine coolant and oil continuously circulated and temperature maintained consistent with manufacturer recommendations.

REFERENCES

1.

10 CFR 50, Appendix A, GDC 17.

2.

UFSAR, Chapter 8.

3.

Regulatory Guide 1.9, Rev. 2, December 1979.

4.

UFSAR, Chapter 6.

5.

UFSAR, Chapter 15.

6.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).

7.

Regulatory Guide 1.93, Rev. 0, December 1974.

8.

Generic Letter 84-15, "Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability," July 2, 1984.

9.

10 CFR 50, Appendix A, GDC 18.

10.

Regulatory Guide 1.108, Rev. 1, August 1977 (Supplement September 1977).

11.

Regulatory Guide 1.137, Rev. 1, October 1979.

12.

ASME, Boiler and Pressure Vessel Code,Section XI.

13.

Response to a Request for Additional Information (RAI) concerning the June 5, 2006 License Amendment Request (LAR) Applicable to Technical Specification (TS) 3.8.1, "AC Sources-Operating,"

Surveillance Requirement (SR) 3.8.1.13, (TAC NOS. MD3217, MD3218, MD3219, and MD3220), April 4, 2007.

Catawba Units 1 and 2 B 3.8.1-29 Revision No. 5