ML13346A252
| ML13346A252 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/11/2013 |
| From: | Widmann M Division of Reactor Safety II |
| To: | Henderson K Duke Energy Carolinas, Duke Energy Corp |
| References | |
| 50-413/14-301, 50-414/14-301 | |
| Download: ML13346A252 (5) | |
See also: IR 05000413/2014301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
December 11, 2013
Mr. Kelvin Henderson
Site Vice President
Duke Energy Corporation
Catawba Nuclear Station
4800 Concord Road
York, SC 29745-9635
SUBJECT:
CATAWBA NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR
INITIAL EXAMINATION - 05000413/2014301 AND 05000414/2014301
Dear Mr. Henderson:
In a telephone conversation on December 4, 2013, between Mr. Eric Madsen, Supervisor,
Nuclear Operations Training and Mr. Mark Bates, Senior Operations Engineer, arrangements
were made for the administration of licensing examinations at Catawba Nuclear Station. The
operating test is scheduled to be administered during the weeks of May 12, and May 19, 2014.
The written examination is scheduled to be administered during the week of May 19, or May 26,
2014. The on-site preparatory week is scheduled for the week of April 14, 2014.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by February 28, 2014. Mr. Bates provided the written examination outline to your staff
on October 25, 2013. The written examination and the supporting reference materials identified
in Attachment 3 to ES-201 will be due by March 14, 2014. The operating test will be due by
March 21, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outline, examination, and test before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
K. Henderson
2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on
April 30, 2016. The public reporting burden for this collection of information is estimated to
average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and
maintaining the data needed, writing the examinations, and completing and reviewing the
collection of information. Send comments on any aspect of this collection of information,
including suggestions for reducing the burden, to the Information and Records Management
Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and
Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).
K. Henderson
3
Thank you for your cooperation in this matter. Mr. Madsen has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Bates at (404) 997-4612, (Internet E-mail:
Mark.Bates@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-413, 50-414
cc: Distribution via Listserv
_________________________
xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
OFFICE
RII:DRS
RII:DRS
SIGNATURE
NAME
BATES
WIDMANN
DATE
12/ 11 /2013
12/11 /2013
E-MAIL COPY?
YES
NO
YES
NO
Letter to Kelvin Henderson from Malcolm T. Widmann dated December 11, 2013.
SUBJECT:
CATAWBA NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR
INITIAL EXAMINATION - 05000413/2014301 AND 05000414/2014301
DISTRIBUTION:
C. Evans, RII EICS
L. Douglas, RII EICS
RIDSNRRDIRS
PUBLIC
A. Adams, NRR
RidsNrrPMCatawba Resource