MONTHYEARRA-24-0276, EN 57402 - Catawba Nuclear Station Interim Part 21 Report2024-10-28028 October 2024 EN 57402 - Catawba Nuclear Station Interim Part 21 Report RA-24-0191, Submittal of Updated Final Safety Analysis Report (Revision 24), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of2024-10-22022 October 2024 Submittal of Updated Final Safety Analysis Report (Revision 24), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of RA-24-0259, Transmittal of Core Operating Limits Reports (COLR) for Oconee Nuclear Station (ONS) Unit 1 Cycle 33 (Revision 2), ONS Unit 2 Cycle 32 (Revision 1 and ONS Unit 3 Cycle 33 (Revisions O and 1)2024-10-16016 October 2024 Transmittal of Core Operating Limits Reports (COLR) for Oconee Nuclear Station (ONS) Unit 1 Cycle 33 (Revision 2), ONS Unit 2 Cycle 32 (Revision 1 and ONS Unit 3 Cycle 33 (Revisions O and 1) RA-24-0254, Resubmittal of Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components2024-10-14014 October 2024 Resubmittal of Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components RA-24-0247, Core Operating Limits Report (COLR) for Unit 1 Cycle 29 Reload Core2024-10-0707 October 2024 Core Operating Limits Report (COLR) for Unit 1 Cycle 29 Reload Core RA-24-0258, Reply to a Notice of Violation; EA-24-0492024-10-0707 October 2024 Reply to a Notice of Violation; EA-24-049 RA-24-0244, Snubber Program Plan Revision, AD-EG-ONS-1618, Oconee Nuclear Station Snubber Program Plan2024-09-30030 September 2024 Snubber Program Plan Revision, AD-EG-ONS-1618, Oconee Nuclear Station Snubber Program Plan RA-24-0229, Transmittal of Refuel 32 (O3R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval2024-09-23023 September 2024 Transmittal of Refuel 32 (O3R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval RA-24-0193, Supplement to Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-08-28028 August 2024 Supplement to Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-24-0185, Snubber Program Plan - Snubber Program Plan Revision, AD-EG-MNS-16182024-08-28028 August 2024 Snubber Program Plan - Snubber Program Plan Revision, AD-EG-MNS-1618 RA-24-0215, Registration for Use of General License Spent Fuel Cask Numbers 177 and 1782024-08-15015 August 2024 Registration for Use of General License Spent Fuel Cask Numbers 177 and 178 RA-24-0208, Refuel 26 (C2R26) Inservice Inspection (ISI) Report2024-08-12012 August 2024 Refuel 26 (C2R26) Inservice Inspection (ISI) Report RA-24-0209, Regulatory Conference, Additional Supporting Information2024-08-0606 August 2024 Regulatory Conference, Additional Supporting Information RA-24-0203, Regulatory Conference Supporting Information2024-07-31031 July 2024 Regulatory Conference Supporting Information RA-24-0197, Subsequent License Renewal Application Response to Request for Additional Information 2024 Annual Update and Subsequent License Renewal Application Supplement 5 Addition2024-07-31031 July 2024 Subsequent License Renewal Application Response to Request for Additional Information 2024 Annual Update and Subsequent License Renewal Application Supplement 5 Addition RA-24-0092, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required LPSW Pump Inoperable on a One-Time Basis2024-07-29029 July 2024 Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required LPSW Pump Inoperable on a One-Time Basis RA-24-0137, Relief Requests for Inservice Testing Plan – Fifth Interval2024-07-0101 July 2024 Relief Requests for Inservice Testing Plan – Fifth Interval RA-23-0245, License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2024-06-18018 June 2024 License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-24-0136, Subsequent License Renewal Application Third Annual Update to the License Renewal Application and Subsequent License Renewal Application Supplement 52024-05-24024 May 2024 Subsequent License Renewal Application Third Annual Update to the License Renewal Application and Subsequent License Renewal Application Supplement 5 RA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-24-0152, Duke Energy Carolinas, LLC - Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2024-05-22022 May 2024 Duke Energy Carolinas, LLC - Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-24-0132, Transmittal of Oconee Unit 2, Refuel 31 (O2R31) Steam Generator Tube Inspection Report2024-05-14014 May 2024 Transmittal of Oconee Unit 2, Refuel 31 (O2R31) Steam Generator Tube Inspection Report RA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-24-0096, Instrumentation and Control Safety Systems NRC Review of Framatome TXS-Compact Topical Report2024-04-24024 April 2024 Instrumentation and Control Safety Systems NRC Review of Framatome TXS-Compact Topical Report RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-24-0103, Response to Request for Additional Information (RAI) Regarding License Amendment Request for a One-Time Extension to the Integrated Leak Rate Test Interval2024-04-19019 April 2024 Response to Request for Additional Information (RAI) Regarding License Amendment Request for a One-Time Extension to the Integrated Leak Rate Test Interval RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini2024-04-17017 April 2024 Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Training RA-24-0101, (Mns), Units 1 and 2, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2024-04-16016 April 2024 (Mns), Units 1 and 2, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations RA-24-0086, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-04-0101 April 2024 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-24-0085, Onsite Property Insurance Coverage2024-04-0101 April 2024 Onsite Property Insurance Coverage RA-24-0082, Core Operating Limits Report (COLR) for Unit 2 Cycle 27 Reload Core2024-03-21021 March 2024 Core Operating Limits Report (COLR) for Unit 2 Cycle 27 Reload Core RA-24-0073, Transmittal of Oconee Unit 2, Refuel 31 (O2R31) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval2024-03-21021 March 2024 Transmittal of Oconee Unit 2, Refuel 31 (O2R31) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval RA-24-0067, Independent Spent Fuel Storage Installation (ISFSI)2024-02-29029 February 2024 Independent Spent Fuel Storage Installation (ISFSI) RA-24-0004, End of Cycle 29 (M1R29) Inservice Inspection Summary Report2024-02-21021 February 2024 End of Cycle 29 (M1R29) Inservice Inspection Summary Report RA-24-0053, Registration for Use of General License Spent Fuel Cask Number 1762024-02-20020 February 2024 Registration for Use of General License Spent Fuel Cask Number 176 RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0297, Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 502023-11-15015 November 2023 Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 50 RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes 2024-09-30
[Table view] |
Text
Benjamin C Waldrep 526 South Church Street Charlotte, NC 28202 ENER~IGY, MailingAddress:
EC07H/P. 0. Box 1006 Charlotte, NC 28201-1006 Office: 704 382 8162 Fax: 704 382 6056 Benjamin. Waldrepaduke-energW.com 10 CFR 50.4 Serial Number: RA-13-1005 October 28, 2013 Attention: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555-001 Catawba Nuclear Station (CNS), Units 1 and 2 Docket Numbers 50-413 and 50-414 Renewed License Numbers NPF-35 and NPF-52 McGuire Nuclear Station (MNS), Units 1 and 2 Docket Numbers 50-369 and 50-370 Renewed License Numbers NPF-9 and NPF-17 Oconee Nuclear Station (ONS), Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-287 Renewed License Numbers DPR-38, DPR-47, and DPR-55
Subject:
Duke Energy Carolinas, LLC, Capability to Perform Multi-Unit Dose Assessment, Supplement
Reference:
- 1. Nuclear Energy Institute (NEI) Letter, Commitment for Implementation of Multi-Unit Dose Assessment Capability-,Pollock to Wiggins; dated March 14, 2013 (ADAMS Accession Number ML13073A522)
- 2. NRC Letter, Industry Implementation of Multi-Unit Dose Assessment Capability,Wiggins to Pollock; dated February 27, 2013 (ADAMS Accession Number ML13029A632)
- 3. Duke Energy Letter, Duke Energy Carolinas, LLC, Capability to Perform Multi-Unit Dose Assessment Capability, Michael J. Annacone to U.S. NRC, Dated June 26, 2013 (ADAMS Accession Number ML13190A316)
- 4. Internal NRC Memorandum to Matthew A. Mitchell, Chief, Projects Management Branch Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation; From Brian K. Harris, Project Manager, Projects Management Branch, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation;
Subject:
Summary of September 5, 2013, Public Teleconference to discuss Licensee use of manual calculations to perform multi-unit/multi-source dose assessment related to Near-Term Task Force Recommendation 9.3; dated September 27, 2013 (ADAMS Accession Number ML13266A407)
Ladies and Gentlemen:
On June 26, 2013, Duke Energy Carolinas, LLC. submitted information concerning the capability to perform offsite dose assessment during an event involving multiple release points at the Catawba, McGuire and Oconee Nuclear Stations (Reference 3). The NRC staff used a teleconference format to present technical issues for discussion with selected licensees regarding the initial review of the multi-unit/multi-source dose assessment submittals.
U.S. Nuclear Regulatory Commission October 28, 2013 Page 2 By an internal NRC correspondence (Reference 4), the NRC summarized the teleconference conducted on September 5, 2013, communicating the staff expectation that licensees have an automated multi-unit/multi-source dose assessment capability and requested that the selected licensees provide a voluntary response to supplement their original submittals within 30 days from the date of issuance of the meeting summary.
In response, Raddose V has the capability to perform automated and manual multi-unit/multi-source dose assessments. Therefore, procedural enhancements and training are required to ensure that Raddose V is performed in a fully automated and permanent manner. As previously stated in Reference 3, the required procedural changes and training will be implemented by December 31, 2014.
There are no regulatory commitments associated with this letter.
Please address any comments or questions regarding this matter to Paul Guill at (704) 382-4753 (paul.guill@duke-energy.com).
Sincerely, Benjamin C W( rrep Vice President-CorporateGovernance &
Operation Support
U.S. Nuclear Regulatory Commission October 28, 2013 Page 3 xc:
V. M. McCree, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 J. C. Paige, Project Manager (CNS & MNS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738 R. V. Guzman, Project Manager (ONS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 8 C2 Rockville, MD 20852-2738 E. L. Crowe NRC Senior Resident Inspector Oconee Nuclear Station J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station G. A. Hutto NRC Senior Resident Inspector Catawba Nuclear Station Justin Folkwein American Nuclear Insurers 95 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453 Ms. Sue Perkins-Grew, NEI Nuclear Energy Institute 1201 F St., NW, Suite 1100 Washington, DC 20004-1218
U.S. Nuclear Regulatory Commission October 28, 2013 Page 4 bxc:
C. J. Thomas (EC05P)
D. H. Llewellyn (EC09E)
G. D. Robison (EC09E)
M. C. Nolan (EC05P)
M. H. Austin EC05P)
L. E. Haynes (EC07F)
G. T. Johnson (EC07F)
R. E. Beckham (EC07F)
S. L. Batson (ONOIVP)
T. D. Ray (ON01VP)
R. H. Guy (ON01VP)
T. L. Patterson (ON01VP)
J. K. Bradley (ON01RT)
D.M. Hubbard (ON01VP)
D. C. Jones (ON03RC)
K. R. Alter (ON03RC)
D. C. Haile (ONO3RC)
ONS Master File (ON02DM, File OS 801.01)
S. D. Capps (MG01VP)
S. M. Snider (MG01VP)
J. N. Robertson (MG01RC)
G. M. Murphy (MG01RC)
MNS Master File (MG01DM, File MC 801.01)
K. Henderson (CN01VP)
R. T. Simril, Jr. (CN01VP)
C. S. Kamilaris (CN01VP)
R. N. Pryce (CN04MD)
R. D. Hart (CN01 RC)
CNS Master File (CN04DM, File CN 801.01)
RGC Date File (CN01RC)
NCMPA-1 PMPA NCEMC ELL (EC05P)