Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Protection of Safeguards Information from Unauthorized Disclosure
2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
ML07087012331 March 2007SG-CDME-07-7, Revision 1, Condition Monitoring and Operational Assessment: GL-95-05 Alternate Repair Criterion End of Cycle 14, 90 Day Report, Sequoyah Unit 2.
ML07080001729 March 2007Confirmatory Action LetterDM weld
TAC:MD145229 March 2007
ML07088005929 March 2007Request for Additional Information, Regarding Risk-Informed Inservice Inspection Program Relief RequestsProbabilistic Risk Assessment
Nondestructive Examination
VT-2
Dissimilar Metal Weld
ML07117057328 March 2007TVA - Decommissioning Funding Status Report
IR 05000327/200700722 March 2007IR 05000327-07-007 and 05000328-07-007, on 02/09/2007, Sequoyah, Unit 1 and 2, Special InspectionSafe Shutdown
Stroke time
Operator Manual Action
Significance Determination Process
Job Performance Measure
ML07081108122 March 2007Meeting Announcement - Public Meeting Sequoyah Nuclear Plant, Docket Nos. 50-327 and 50-328
TAC:MD514221 March 2007
ML07086038421 March 2007Cycle 14 (U2C14) 90-Day Inservice Inspection Summary ReportHydrostatic
Coatings
Nondestructive Examination
VT-2
Moisture barrier
ML07073007813 March 2007Notification of Sequoyah Nuclear Plant - Component Design Bases Inspection (CDBI) - NRC Inspection Report 05000327-07-006 and 05000328-07-006 and Information Request for CDBI
ML07075009812 March 2007Discharge Monitoring Report for February 2007Veliger
ML0713703097 March 2007Velan, Inc., Piston Check Cv Information
ML0706800407 March 2007Tennessee Valley Authority - 2006 Annual ReportIncorporated by reference
Earthquake
Pandemic
ML0707101026 March 2007Tennessee Multi-Sector General Permit (Tmsp) Annual Storm Water Monitoring Report for 2006Grab sample
ML0706701496 March 2007Enhancement of the Capability of the Containment Hydrogen Igniters
ML22195A1592 March 2007NSAL-06-6 LOCA Mass and Energy Release Analysis
IR 05000327/20070011 March 2007IR 05000327-07-001 and 05000328-07-001 for Sequoyah on 02/06/2007
ML0706005451 March 2007Inspection/Activity Plan 03/01/2007 - 09/30/2008
ML0706504451 March 2007Fitness for Duty (FFD) Program Performance Data: July - December 2006Fitness for Duty
Contraband
ML07058038528 February 2007Request for Additional Information Regarding Steam Generator Tube Integrity Technical Specification Amendment
TAC:MD418427 February 2007
ML07061009327 February 2007Commitment Letter Regarding Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt Welds
ML07065031726 February 2007Technical Specifications Change 07-01 Permanent Revision of Allowable Value for Reactor Trip System Turbine Trip on Low Trip System Pressure.
ML07068036022 February 2007Errata Letter for Sequoyah - Report 06-05 and 06-02Safe Shutdown
Boric Acid
Non-Destructive Examination
Fire Barrier
Locked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Fire Protection Program
IR 05000327/200600522 February 2007IR 05000327-06-005, IR 05000328-06-005; IR 07200034-06-002; 10/01/2006 - 12/31/2006; Sequoyah Nuclear Plant, Units 1 & 2; Licensed Operator Requalification ProgramSafe Shutdown
Boric Acid
Packing leak
High Radiation Area
Fire Barrier
Nondestructive Examination
VT-2
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Liquid penetrant
Fire Protection Program
Unidentified leakage
ML07072018122 February 2007Errata Letter for IR 05000327-06-005, IR 05000328-06-005; IR 07200034-06-002; 10/01/2006 - 12/31/2006; Sequoyah Nuclear Plant, Units 1 & 2; Licensed Operator Requalification ProgramSafe Shutdown
Boric Acid
Non-Destructive Examination
Fire Barrier
Locked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Fire Protection Program
ML07065044120 February 2007Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.Boric Acid
Nondestructive Examination
VT-2
Liquid penetrant
ML07057011620 February 2007National Pollutant Discharge Elimination System Permit No. TN0026450 - Addition of Sodium Hypochlorite (Liquid Bleach) to the Biocide/Corrosion Treatment Plan
ML07045012514 February 2007Licensed Operator Positive Alcohol TestFitness for Duty
ML07045009214 February 2007Meeting Summary Memo Betweem NRC and TVA - Sequoyah Nuclear Plant
ML07047064813 February 2007Changes to Distribution Lists for TVA Dockets; Updated Lists for Browns Ferry, Sequoyah, and Watts Bar Plants
ML07045010013 February 2007Attachment 2 - Sequoyah Nuclear Plant - Plant Performance
ML07052024912 February 2007Discharge Monitoring Report for January 2007Veliger
ML0703002096 February 2007Corrected Technical Specification Page for Amendment No. 304 Regarding Alternate Rod Position Monitoring Method (TS-06-04)
ML0703006126 February 2007NRC Staff Review of Steam Generator Tube Inspection Reports for the 2005 Refueling Outage
ML0703201946 February 2007Summary of Conference Call Regarding Steam Generator Tube Inspections
ML0703901525 February 20072006 Biocide/Corrosion Treatment Plan Annual Report - NPDES Permit No. TN0026450
ML0703202811 February 2007Special Inspection Charter to Evaluate Operations and Maintenance on Time Critical Manual ValvesSafe Shutdown
Significance Determination Process
Time Critical Operator Action
TAC:MD163231 January 2007
ML07033005131 January 20072 & 3; Sequoyah, Units 1 & 2 and Watts Bar, Unit 1 - Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and Impact on Plant Risk & Operability of Offsite PowerProbabilistic Risk Assessment
Large early release frequency
ML07033006231 January 2007Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt WeldsWeld Overlay
Pressure Boundary Leakage
Dissimilar Metal Weld
DM weld
ML07025018431 January 2007Response to Generic Letter 2006-03: Potentially Nonconforming Hemyc and MT Fire Barrier ConfigurationsSafe Shutdown
Fire Barrier
Hemyc
ML07044014731 January 2007Cycle 15 Core Operating Limits Report (COLR) Revision 1
TAC:MD418531 January 2007
ML07030088130 January 2007(Superceded-see ML070720224) IR 05000327-06-005, IR 05000328-06-005; IR 07200034-06-002; 10/01/06 - 12/31/06; Sequoyah Nuclear Plant, Units 1 & 2; Licensed Operator Requalification ProgramSafe Shutdown
Boric Acid
Packing leak
High Radiation Area
Non-Destructive Examination
Fire Barrier
Weld Overlay
Nondestructive Examination
VT-2
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Stress corrosion cracking
Integrated leak rate test
Eddy Current Testing
Liquid penetrant
Unidentified leakage
Loss of condenser vacuum
ML07053015526 January 2007Soch Model Data Input (Unit 5)
ML07053014326 January 2007Units 1 and 2 - Response to Request for Additional Information (RAI) for Technical Specifications (TS) Change 06-03Ultimate heat sink
ML06362005225 January 2007Bulletin 2004-01, Inspections of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors, Response for Sequoyah Nuclear Plant, Units 1 and 2Boric Acid
Nondestructive Examination
Through-Wall Leak