ML070600545

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan 03/01/2007 - 09/30/2008
ML070600545
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/01/2007
From:
Reactor Projects Region 2 Branch 6
To:
Tennessee Valley Authority
Shared Package
ML070600539 List:
References
Download: ML070600545 (2)


Text

Page 1 of 2 Sequoyah 03/01/2007 14:28:47 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 60855.1 - OPERATIONAL ISFSI INSPECTION BY RESIDENT 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 03/01/2007 04/30/2007 Other Routine OL PREP - INITIAL EXAM PREP 3 1 V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES 03/19/2007 03/23/2007 Not Applicable EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 03/26/2007 03/30/2007 Baseline Inspections OL EXAM - INITIAL EXAM WEEK 1 3 1 V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES 04/09/2007 04/13/2007 Not Applicable PSB1-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 05/07/2007 05/11/2007 Baseline Inspections EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 6 1, 2 IP 7111121 Component Design Bases Inspection 05/14/2007 05/18/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/04/2007 06/08/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/18/2007 06/22/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 07/09/2007 07/13/2007 Baseline Inspections RPB6-PIR - BIENNIAL PI&R INSPECTION 4 1, 2 IP 71152B Identification and Resolution of Problems 07/23/2007 07/27/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 08/06/2007 08/10/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/04/2007 09/06/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/01/2007 10/05/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/01/2007 10/05/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/01/2007 10/05/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/01/2007 10/05/2007 Baseline Inspections EB3ISI - U1 ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/15/2007 10/19/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. Package ML070600539 Enclosure ML070600545 This report shows only on-site and announced inspection procedures.

Page 2 of 2 Sequoyah 03/01/2007 14:28:47 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 10/22/2007 10/26/2007 Safety Issues EB3ISI - U1 TI-150 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 10/22/2007 10/26/2007 Safety Issues PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK 2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/22/2007 10/26/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 1 V23276 SEQUOYAH/JANUARY 2008 EXAM AT POWER FACILITIES 01/07/2008 01/11/2008 Not Applicable OL EXAM - INITIAL EXAM 2 1 V23276 SEQUOYAH/JANUARY 2008 EXAM AT POWER FACILITIES 01/28/2008 02/01/2008 Not Applicable PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/28/2008 04/30/2008 Baseline Inspections EB3-ISI - UNIT 2 - ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/28/2008 05/02/2008 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION 5 1, 2 IP 7111105T Fire Protection [Triennial] 05/06/2008 05/08/2008 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 05/19/2008 05/23/2008 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 06/02/2008 06/06/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 06/16/2008 06/20/2008 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23287 SEQUOYAH/SEPTEMBER 2008 EXAM AT POWER FACILITIES 09/01/2008 09/05/2008 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23287 SEQUOYAH/SEPTEMBER 2008 EXAM AT POWER FACILITIES 09/22/2008 10/03/2008 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.