 Issue dateTitleTopic
ML07346075719 December 2007Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac No. MD5262, MD5263 and MD5264)
ML07351018014 December 2007Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Schedule Regarding Analysis for Steam Dryers
ML0734402117 December 2007Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters
TAC:MD72976 December 2007
ML0733204126 December 2007Application Performance Indicators and Augmented Inspection ProgramPower change
ML0732407336 December 2007G20070793/LTR-07-0754/EDATS: SECY-2007-0507 - Rep. Bud Cramer Ltr. Potential Impact of Proposed Rock Quarry on Operations at the Browns Ferry Nuclear PlantEarthquake
TAC:MD29806 December 2007
ML0733901705 December 2007Forthcoming Meeting Notice with the Tennessee Valley, to Discuss the Latest Request for Additional Information Regarding the Browns Ferry Extended Power Uprate
ML0734400414 December 2007Transmittal of Update to TVA Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Rev. 18 for Browns Ferry, Sequoyah, and Watts BarFitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
B.5.b
Process Control Program
Fire Protection Program
ML07338126329 November 2007Plants - Changes to Distribution Lists for TVA Dockets
ML07333048321 November 2007Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Preliminary Findings on Steam Dryer Stress Analysis
ML07323002619 November 2007Notice of Meeting with the Tennessee Valley Authority to Discuss the Browns Ferry Nuclear Plant Extended Power Uprate Schedule Revision
IR 05000259/200740316 November 2007IR 05000259-07-403, IR 05000260-07-403, & IR 05000296-07-403, Completed on 11/01/2007, Browns Ferry NRC Physical Security Baseline Inspection Report SubmittalAffidavit
ML07323034815 November 2007Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure APLA-35/37Hot Short
Safe Shutdown
Fire Barrier
Fire Protection Program
ML0731000279 November 2007Request for Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418-S)
ML20311A6546 November 20072017 Q1-Q4 ROP Performance IndicatorsSafe Shutdown
Unanalyzed Condition
High Radiation Area
Tornado Missile
Past operability
Operator Manual Action
Fire Protection Program
Power change
IR 05000253/20072016 November 2007Security Inspection 05000253-07-201, 05000260-07-201 and 05000296-07-201 on 09/27/2007 for Browns Ferry Nuclear Plant
ML0731304706 November 2007G20070793/LTR-07-0754/EDATS: SECY-2007-0507 - Ltr. Rep. Bud Cramer Potential Impact of Proposed Rock Quarry on Operations at the Browns Ferry Nuclear Plant
ML0731000821 November 2007Notification of Potential 10 CFR Part 21 of an Error in BWR MCPR CalculationAnticipated operational occurrence
IR 05000259/200700430 October 2007IR 05000259-07-004, 05000260-07-004 & 05000296-07-004; on 07/01/2007 - 09/30/2007; Browns Ferry Nuclear Plants, Units 1, 2, & 3; Event Followup Integrated Inspection ReportSafe Shutdown
Fire Barrier
Temporary Modification
Tornado Generated Missile
Significance Determination Process
Pressure Boundary Leakage
Fire Protection Program
Downpower
Power Uprate
ML07305002325 October 2007Letter Submitting Changes to Distribution Lists for TVA Dockets
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07303003425 October 2007Supplemental Reply to NRC Regulatory Issue Summary (RIS) 2007-17, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML07304052725 October 2007No Candidates for Generic Fundamentals Examination Section (Gfes) ExaminationGeneric Fundamentals Examination
ML07303031824 October 2007Technical Specifications (TS) Change TS-418 - Extended Power Uprate (EPU) - Response to Round 14 Request for Additional Information (RAI) - SBWB-85 (TAC Nos. MC5263 and MC5264)
PNO-II-07-013, Browns Ferry Refueling Floor Crane Cable Deformation24 October 2007PNO-II-07-013: Browns Ferry Refueling Floor Crane Cable Deformation
ML07296031122 October 2007Technical Specification (TS) Changes TS-431 & TS-418, Extended Power Uprate - EPU Large Transient Testing
ML07289023718 October 2007Request for Withholding Information from Public Disclosure Concerning Round 13 Request for Additional Information for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263 and MD5264)
ML07285090512 October 2007Special Report 296/2007-001 for Inoperable Post Accident Monitoring (PAM) InstrumentationPost Accident Monitoring
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
IR 05000259/20070089 October 2007IR 05000259-07-008, 05000260-07-008, 05000296-07-008; on 08/6-10, 08/20-24/2007; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Biennial Baseline Inspection of the Problem Identification and Resolution ProgramSignificance Determination Process
Operability Determination
Through-Wall Leak
Grace period
ML0727606609 October 2007Request for Additional Information for Extended Power Uprate - Round 14 (TS-418)
ML0728303348 October 2007Notification of Potential Part 21 Report - Areva Minimum Critical Power RatioAnticipated operational occurrence
ML0727601462 October 2007Region II Management Change in Operator Licensing
ML0727601121 October 2007Changes to Distribution Lists for TVA Dockets
IR 05000259/20073011 October 2007Er 05000259-07-301, Er 05000260-07-301 and Er 05000296-07-301, on 08/27-29/2007 & 08/31/2007, Browns Ferry Nuclear Plant, Units 1, 2 & 3, Licensed Operator Examinations
PNO-II-07-011, A - Update, Browns Ferry, Unit 3, Pressure Boundary Leakage Discovered During Drywell Inspection1 October 2007PNO-II-07-011A - Update, Browns Ferry, Unit 3, Pressure Boundary Leakage Discovered During Drywell InspectionPressure Boundary Leakage
ML07267051124 September 2007PNO-II-07-011: Browns Ferry Unit 3, Pressure Boundary Leakage Discovered During Drywell InspectionPressure Boundary Leakage
Power change
ML07275004424 September 2007(BFN) - Unit 3 - Extended Power Uprate (EPU) - Reload Analysis Report
ML07275004524 September 2007ANP-2631, Revision 0, Browns Ferry Unit 3 Cycle 14 Reload Analysis Report.Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Feedwater Controller Failure
MELLLA
Fuel cladding
ML07256055431 August 2007Transmits Browns Ferry Unit 1, American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inspection (Iwe), & Repair & Replacement Programs - Summary Reports (NIS-1 & NIS-2) for Cycles 6 & 6Nondestructive Examination
ML07248018131 August 2007Mid-Cycle Letter. Mid-Cycle Performance Review and Inspection Plan - Browns Ferry
ML07256055731 August 2007American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inspection (Iwe), & Repair & Replacement Programs - Summary Reports (NIS-1 & NIS-2) for Cycles 6 & 6R Operation, Part 2 of 3Hydrostatic
Anchor Darling
Pressure boundary leak
ML07248054731 August 2007Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment OverpressureHot Short
Safe Shutdown
Mission time
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Fuel cladding
ML07248019431 August 2007Report 22 - Mid-Cycle Performance Review and Inspection Report
ML07256055831 August 2007American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inspection (Iwe), & Repair & Replacement Programs - Summary Reports (NIS-1 & NIS-2) for Cycles 6 & 6R Operation, Part 3 of 3
ML07256055631 August 2007American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inspection (Iwe), & Repair & Replacement Programs - Summary Reports (NIS-1 & NIS-2) for Cycles 6 & 6R Operation, Part 1 of 3
ML07255005531 August 2007Report 22, Inspection/Activity Plan 09/01/2007 - 03/311/2009
ML07236026231 August 200707-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 1, Revision 0Finite Element Analysis
ML07236026331 August 200707-31NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 2 and 3, Revision 0Finite Element Analysis