MONTHYEARML23215A1632023-06-0101 June 2023 Bf 2023-301 File 2B - Exam Administrative Items (Normal Release) ML20255A0002020-09-24024 September 2020 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic ML17125A0702017-05-0505 May 2017 FAQ 16-04 ML16145A1142016-05-24024 May 2016 ASP Analysis- Reject- Browns Ferry Nuclear Plant, Unit 3, High Pressure Coolant Injection and Reactor Core Isolation Cooling Inoperable Due to No Suction Source Aligned (LER 296-2015-001) ML15282A1682015-09-21021 September 2015 List of Regulatory Commitments NL-15-169, Browns Ferry, Units 1, 2 and 3 - List of Regulatory Commitments2015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - List of Regulatory Commitments ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML15014A1602015-01-14014 January 2015 Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15014A1532015-01-14014 January 2015 Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML12170B1032012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #3 Scenario ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1127100332011-09-28028 September 2011 ROP Tabletop Examples and Results ML1122005052011-08-0404 August 2011 Crop Tabletop Example Findings ML1119901412011-07-15015 July 2011 Brown'S Ferry Unit 3, Initial On-Site Findings of the Independent Reactor Decommissioning Trust Fund Oversight Analysis ML1119901152011-07-15015 July 2011 Brown'S Ferry Unit 1, Initial On-Site Finding of the Independent Reactor Decommissioning Trust Fund Oversight Analysis ML1119901272011-07-0707 July 2011 Brown'S Ferry Unit 2, Initial On-Site Findings of the Independent Reactor Decommissioning Trust Fund Oversight Analysis ML12227A7102010-09-0202 September 2010 Geris 2000 Examination Reports and Associated Records ML1019303172010-06-0909 June 2010 Onsite Ground/Surface Water Monitoring Questionnaire for Browns Ferry ML1010404552010-04-14014 April 2010 EN-10-018 - Issuance of Final Significance Determination and Notice of Violation, Browns Ferry, 1, 2 & 3 ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML1011605162009-10-31031 October 2009 Part 1: Previous NRC Requests for Additional Information Matrix and Text, Part 2: Browns Ferry Unit 1 - Summary of Response to Request for Additional Information, ANP-2860(NP), Rev. 2, Browns Ferry Unit 1 - Summary of Responses to Requests ML0907108072009-03-23023 March 2009 Submittal of Request for Additional Information from ACRS to NRC on Transmittal of ACRS Members' Concerns Regarding Containment Overpressure Credit for Browns Ferry Extended Power Uprate. ML0810104522008-04-0404 April 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 and Round 16 Requests for Additional Information (RAI) Regarding Steam Dryer Analyses ML0730300342007-10-25025 October 2007 Supplemental Reply to NRC Regulatory Issue Summary (RIS) 2007-17, Preparation and Scheduling of Operator Licensing Examinations ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0713003882007-05-0202 May 2007 Enclosure 3, List of Attendees for Discussion of ORAT Inspection Results. 05/02/2007 Summary of Public Meeting with Tennessee Valley Authority, Regarding Oversight of the Browns Ferry Unit 1 Restart Project Status by the Restart Oversight P ML0713003802007-05-0202 May 2007 Enclosure 1, List of Attendees for Browns Ferry Unit 1 Recovery Status. 05/02/2007 Summary of Public Meeting with Tennessee Valley Authority, Regarding Oversight of the Browns Ferry Unit 1 Restart Project Status by the Restart Oversight Pan ML0527000442005-09-21021 September 2005 Attachment 10, FAQ Log 9/21/05 ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML18283B5501978-01-24024 January 1978 Questionnaire for Nuclear Regulatory Commission Reliability Study of Standby Diesel Generator Units 2023-06-01
[Table view] Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 Brian O'Grady Vice President, Browns Ferry Nuclear Plant October 25, 2007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001
Dear Sir:
In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - SUPPLEMENTAL REPLY TO NRC REGULATORY ISSUE
SUMMARY
(RIS) 2007-17, PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS This letter provides a supplemental reply to TVA's initial response to an NRC RIS dated July 12, 2007. Based on further review of our current Operator training schedule, TVA is requesting for NRC to schedule an additional initial Operator license examination for February in calendar year 2008.
This issue was discussed and complies with Region II staff who requested TVA to submit this supplemental reply.
Enclosed is a revised NRC Form 536, Operator Licensing Examination Data, which provides BFN's current schedules for the specific information requested in the RIS.
0o03 Printed on recycled paper
Nuclear Regulatory Commission Paae 2 October 25, 2007 If you have any questions concerning these schedules for the graded written examinations or the proposed examination schedules, please contact E. R. Scillian at (256) 729-3439.
Sincerely, Brian O'Grady Enclosure Cc (Enclosure)
Dr. William D. Travers, Regional Administrator U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Malcolm T. Widmann, Chief Operator Licensing and Human Performance Branch U.S. Nuclear Regulatory Commission Region II Sam Nunn Atianta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970
ENCLOSURE Enclosure Operator Licensing Examination Data (Data as defined on NRC Form 536)
FACILITY BROWNS FERRY NUCLEAR PLANT I NRC REGION H A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY-2008 ESTIMATED NUMBER OF 2 LICENSEE PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 NRC PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY-2008 CY-2009 CY-2010 CY-2011 NUMBER OF REACTOR 5 - 11 6 6 - 6 6 OPERATORS NUMBER OF SENIOR REACTOR 4 - 2 5 3 - 3 3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 - 2 1 3 - 3 3 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 2/25/2008 - 10/20/2008 4/20/2009 4/19/2010 - 10/25/2010 10/24/2011 ALTERNATE DATE 3/03/2008 - 11/03/2008 05/04/2009 05/3/2010 - 11/8/2010 11/7/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY-2008 CY-2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MAR JUNE SEPTEMBER DECEMBER CH ESTIMATED I1 0 0 0 9 0 9 0 NUMBER OF CANDIDATES