ML072550055
| ML072550055 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/31/2007 |
| From: | NRC/RGN-II |
| To: | |
| References | |
| Download: ML072550055 (2) | |
Text
Browns Ferry Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2007 11:26:58 Report 22 1
60855.1
- OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 08/01/2007 09/30/2007 1
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 9
EB1-CDBI
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 10/29/2007 11/02/2007 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 11/12/2007 11/16/2007 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 11/26/2007 11/30/2007 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 12/10/2007 12/14/2007 1, 2, 3 7111121 IP Component Design Bases Inspection 1
EB3-ME
- MAINTENANCE EFFECTIVENESS Baseline Inspections 11/05/2007 11/09/2007 1, 2, 3 7111112B IP Maintenance Effectiveness 5
EB1-MODS
- MODIFICATIONS - 10CFR50.59 Baseline Inspections 01/14/2008 01/18/2008 1, 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/14/2008 01/18/2008 1, 2, 3 7111117B IP Permanent Plant Modifications 1
EB3HS
- HEAT SINK Baseline Inspections 01/28/2008 02/01/2008 1, 2, 3 7111107B IP Heat Sink Performance 3
OL EXAM
- INITIAL EXAM PREP Not Applicable 01/28/2008 02/01/2008 1
V23278 BROWNS FERRY/FEBRUARY 2008 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM Not Applicable 02/25/2008 03/07/2008 1
V23278 BROWNS FERRY/FEBRUARY 2008 EXAM AT POWER FACILITIES 1
EB3-ISI
- UNIT 3 - ISI Baseline Inspections 03/10/2008 03/14/2008 3
7111108G IP Inservice Inspection Activities - BWR 1
PSB1-RP
- RAD PROTECTION - ACCESS CONTROLS Baseline Inspections 03/24/2008 03/28/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/24/2008 03/28/2008 1, 2, 3 71151-OR01 IP Occupational Exposure Control Effectiveness 1
PSB1-EP
- EP INSP Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 7111402 IP Alert and Notification System Testing Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 71151-EP03 IP Alert & Notification System 3
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Browns Ferry Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2007 11:26:58 Report 22 3
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 06/02/2008 06/06/2008 1, 2, 3 71151-PR01 IP RETS/ODCM Radiological Effluent 1
- PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections 08/18/2008 08/22/2008 1, 2, 3 71152B IP Identification and Resolution of Problems 4
- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 09/29/2008 10/03/2008 1, 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 10/13/2008 10/17/2008 1, 2, 3 71152B IP Identification and Resolution of Problems 1
EB3ISI
- U1 ISI Baseline Inspections 11/03/2008 11/07/2008 1
7111108G IP Inservice Inspection Activities - BWR 2
- REQUAL INSPECTION Baseline Inspections 12/01/2008 12/05/2008 1, 2, 3 7111111B IP Licensed Operator Requalification Program 1
PSB1-RP
- RAD PROTECTION PRE-INSPECTION VISIT Baseline Inspections 01/26/2009 01/30/2009 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 3
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections 03/02/2009 03/06/2009 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/02/2009 03/06/2009 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 03/02/2009 03/06/2009 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/02/2009 03/06/2009 1, 2, 3 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 03/02/2009 03/06/2009 1, 2, 3 71151-PR01 IP RETS/ODCM Radiological Effluent 2
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections 03/16/2009 03/20/2009 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/16/2009 03/20/2009 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 03/16/2009 03/20/2009 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/16/2009 03/20/2009 1, 2, 3 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 03/16/2009 03/20/2009 1, 2, 3 71151-PR01 IP RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure