ML19126A030 | 28 June 2019 | Issuance of Amendments to Technical Specification 3.8.1, AC Sources-Operating | Safe Shutdown High winds Ultimate heat sink Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Qualified Offsite Circuit FLEX Fukushima Dai-Ichi Seismically rugged Surveillance Frequency Control Program Large early release frequency Earthquake Maintenance Rule Program Offsite Circuit Fire Protection Program |
ML19128A326 | 20 June 2019 | Alternative to Depth Sizing Qualification Examination of Welds | Incorporated by reference Stress corrosion cracking Eddy Current Testing Dissimilar Metal Weld |
ML19162A391 | 11 June 2019 | NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Relief Request (19-GO-001) Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography | |
RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 | 30 May 2019 | Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 | |
ML19142A483 | 22 May 2019 | Emergency Preparedness Exercise Inspection Request for Information | |
RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations | 15 May 2019 | Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations | |
RA-19-0224, Submittal of McGuire Nuclear Station, Units 1 and 2, 2018 Annual Radiological Environmental Operating Report | 13 May 2019 | Submittal of McGuire Nuclear Station, Units 1 and 2, 2018 Annual Radiological Environmental Operating Report | Annual Radiological Environmental Operating Report |
IR 05000369/2019001 | 8 May 2019 | Nuclear Regulatory Commission Integrated Inspection Report 05000369/2019001 and 05000370/2019001 | |
ML14224A356 | 3 May 2019 | Letter to All Holders of Licenses for Operating Power Reactors - Rescission of Certain Power Reactor Security Orders Applicable to Nuclear Power Plants | |
ML19112A311 | 24 April 2019 | Correction Letter to License Amendment Nos. 313 and 292 Removal of Heaters from Ventilation System Technical Specifications | Post Accident Monitoring |
ML19050A297 | 18 April 2019 | McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal | Post Accident Monitoring Surveillance Frequency Control Program Recently irradiated fuel Fire Protection Program |
ML19091A194 | 17 April 2019 | Safety Evaluation Input for License Amendment Request to Revise the Technical Specifications 3.8.1, AC Sources - Operating. | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Commercial Grade Offsite Circuit |
RA-19-0203, Submittal of Cycle 27, Revision 0, Core Operating Limits Report | 15 April 2019 | Submittal of Cycle 27, Revision 0, Core Operating Limits Report | |
ML20093E620 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 9 | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Non-Destructive Examination Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Enforcement Discretion Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting FLEX B.5.b Tornado Missile Protection Design basis earthquake Spent Fuel Pool Instrumentation Overtravel Earthquake Control of Heavy Loads Fuel cladding Biofouling Liquid penetrant Fire Protection Program Overspeed trip Manual Operator Action |
ML20093E239 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 7 Tables | Boric Acid |
ML20093E584 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 8 Tables | Boric Acid Surveillance Frequency Control Program Battery sizing Offsite Circuit Overspeed trip Manual Operator Action |
ML20093E565 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 8 Figures | |
ML20093E536 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 8 | Safe Shutdown Fire Barrier FLEX Battery sizing Overspeed trip |
ML20093D926 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 5 | Boric Acid Shutdown Margin Loop seal Grab sample Stroke time Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination FLEX Design basis earthquake Foreign Material Exclusion Stress corrosion cracking Eddy Current Testing Earthquake Liquid penetrant Pressure Boundary Leakage Power change Flow Induced Vibration Coast down Unidentified leakage Unidentified leak Power Uprate Measurement Uncertainty Recapture Overspeed trip Thermal fatigue |
ML20093E661 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 9 Figures | Tornado Missile |
ML20093E698 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 9 Tables | Boric Acid Grab sample Hydrostatic FLEX |
ML20093G903 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 10 | Safe Shutdown Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment FLEX B.5.b Turbine Missile Power Uprate Measurement Uncertainty Recapture Overspeed trip Manual Operator Action Loss of condenser vacuum |
ML20093G935 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 10 Figures | Overspeed trip |
ML20093G955 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 10 Tables | Safe Shutdown |
ML20093E208 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 7 Figures | |
ML20093E176 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 7 | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Emergency Lighting Operability Determination Earthquake Maintenance Rule Program Fuel cladding Power change Manual Operator Action |
ML20093E148 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 6 Tables | Safe Shutdown Boric Acid Stroke time Weld Overlay Coatings Design basis earthquake Earthquake GOTHIC |
ML20093E107 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 6 Figures | |
ML20093E060 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 6 | Safe Shutdown Boric Acid Packing leak Mission time Safe Shutdown Earthquake Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting FLEX B.5.b Design basis earthquake Excess Flow Check Valve Earthquake Fuel cladding Liquid penetrant GOTHIC Manual Operator Action Thermal fatigue |
ML20093D989 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 5 Tables | Boric Acid Stroke time Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Pressure Boundary Leakage Unidentified leakage |
ML20093D960 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 5 Figures | |
ML20094P474 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 13 | Fitness for Duty Cyber Security Safeguards Contingency Plan Cyber attack Loss of condenser vacuum |
ML20093D599 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 4 Tables | Shutdown Margin |
ML20093D562 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 4 Figures | |
ML20093D538 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 4 | Boric Acid Shutdown Margin Safe Shutdown Earthquake Nondestructive Examination Design basis earthquake Stress corrosion cracking Earthquake Fuel cladding Power change Flow Induced Vibration Overspeed trip |
ML20095H463 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 14 Tables | |
ML20093D505 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 3 Tables | Boric Acid Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Tornado Generated Missile Tornado Missile Protection TORMIS Turbine Missile |
ML19087A062 | 11 April 2019 | Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request | Dissimilar Metal Weld |
ML20095H450 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 14 | Boric Acid Shutdown Margin Hydrostatic Local Leak Rate Testing Power Operated Valves Negative Flux Rate Trip |
ML20095H537 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 18 Tables | Boric Acid Aging Management Flow Accelerated Corrosion License Renewal Fire Protection Program |
ML20095H529 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 18 | Safe Shutdown Boric Acid Loop seal Non-Destructive Examination Weld Overlay Coatings VT-2 Incorporated by reference Aging Management Foreign Material Exclusion Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing License Renewal Earthquake Biofouling Through-Wall Leak Fire Protection Program Thermal fatigue |
ML20095H521 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 17 | Incorporated by reference |
ML20095H514 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 16 | |
ML20095H496 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 15 Tables | Loop seal Tornado Missile Tornado Generated Missile Fuel cladding Coast down |
ML20095H483 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 15 Figures | |
ML20095H470 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 15 | Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Tornado Missile Tornado-Generated Missile Tornado Missile Protection Earthquake Fuel cladding Coast down Power Uprate Measurement Uncertainty Recapture Overspeed trip Manual Operator Action Loss of condenser vacuum |
ML20094N474 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 11 | Boric Acid Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Fuel cladding Pressure Boundary Leakage |
ML20095H455 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 14 Figures | |
ML20094P506 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 13 Tables | |
ML20094P485 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 13 Figures | |