Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19126A03028 June 2019Issuance of Amendments to Technical Specification 3.8.1, AC Sources-OperatingSafe Shutdown
High winds
Ultimate heat sink
Mission time
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Qualified Offsite Circuit
FLEX
Fukushima Dai-Ichi
Seismically rugged
Surveillance Frequency Control Program
Large early release frequency
Earthquake
Maintenance Rule Program
Offsite Circuit
Fire Protection Program
ML19128A32620 June 2019Alternative to Depth Sizing Qualification Examination of WeldsIncorporated by reference
Stress corrosion cracking
Eddy Current Testing
Dissimilar Metal Weld
ML19162A39111 June 2019NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Relief Request (19-GO-001) Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography
RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.4630 May 2019Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46
ML19142A48322 May 2019Emergency Preparedness Exercise Inspection Request for Information
RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations15 May 2019Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations
RA-19-0224, Submittal of McGuire Nuclear Station, Units 1 and 2, 2018 Annual Radiological Environmental Operating Report13 May 2019Submittal of McGuire Nuclear Station, Units 1 and 2, 2018 Annual Radiological Environmental Operating ReportAnnual Radiological Environmental Operating Report
IR 05000369/20190018 May 2019Nuclear Regulatory Commission Integrated Inspection Report 05000369/2019001 and 05000370/2019001
ML14224A3563 May 2019Letter to All Holders of Licenses for Operating Power Reactors - Rescission of Certain Power Reactor Security Orders Applicable to Nuclear Power Plants
ML19112A31124 April 2019Correction Letter to License Amendment Nos. 313 and 292 Removal of Heaters from Ventilation System Technical SpecificationsPost Accident Monitoring
ML19050A29718 April 2019McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding RemovalPost Accident Monitoring
Surveillance Frequency Control Program
Recently irradiated fuel
Fire Protection Program
ML19091A19417 April 2019Safety Evaluation Input for License Amendment Request to Revise the Technical Specifications 3.8.1, AC Sources - Operating.Safe Shutdown
Anticipated operational occurrence
Qualified Offsite Circuit
Commercial Grade
Offsite Circuit
RA-19-0203, Submittal of Cycle 27, Revision 0, Core Operating Limits Report15 April 2019Submittal of Cycle 27, Revision 0, Core Operating Limits Report
ML20093E62011 April 2019Updated Final Safety Analysis Report, Chapter 9Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
FLEX
B.5.b
Tornado Missile Protection
Design basis earthquake
Spent Fuel Pool Instrumentation
Overtravel
Earthquake
Control of Heavy Loads
Fuel cladding
Biofouling
Liquid penetrant
Fire Protection Program
Overspeed trip
Manual Operator Action
ML20093E23911 April 2019Updated Final Safety Analysis Report, Chapter 7 TablesBoric Acid
ML20093E58411 April 2019Updated Final Safety Analysis Report, Chapter 8 TablesBoric Acid
Surveillance Frequency Control Program
Battery sizing
Offsite Circuit
Overspeed trip
Manual Operator Action
ML20093E56511 April 2019Updated Final Safety Analysis Report, Chapter 8 Figures
ML20093E53611 April 2019Updated Final Safety Analysis Report, Chapter 8Safe Shutdown
Fire Barrier
FLEX
Battery sizing
Overspeed trip
ML20093D92611 April 2019Updated Final Safety Analysis Report, Chapter 5Boric Acid
Shutdown Margin
Loop seal
Grab sample
Stroke time
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
FLEX
Design basis earthquake
Foreign Material Exclusion
Stress corrosion cracking
Eddy Current Testing
Earthquake
Liquid penetrant
Pressure Boundary Leakage
Power change
Flow Induced Vibration
Coast down
Unidentified leakage
Unidentified leak
Power Uprate
Measurement Uncertainty Recapture
Overspeed trip
Thermal fatigue
ML20093E66111 April 2019Updated Final Safety Analysis Report, Chapter 9 FiguresTornado Missile
ML20093E69811 April 2019Updated Final Safety Analysis Report, Chapter 9 TablesBoric Acid
Grab sample
Hydrostatic
FLEX
ML20093G90311 April 2019Updated Final Safety Analysis Report, Chapter 10Safe Shutdown
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
FLEX
B.5.b
Turbine Missile
Power Uprate
Measurement Uncertainty Recapture
Overspeed trip
Manual Operator Action
Loss of condenser vacuum
ML20093G93511 April 2019Updated Final Safety Analysis Report, Chapter 10 FiguresOverspeed trip
ML20093G95511 April 2019Updated Final Safety Analysis Report, Chapter 10 TablesSafe Shutdown
ML20093E20811 April 2019Updated Final Safety Analysis Report, Chapter 7 Figures
ML20093E17611 April 2019Updated Final Safety Analysis Report, Chapter 7Safe Shutdown
Boric Acid
Shutdown Margin
Anticipated operational occurrence
Water Inventory Control
Post Accident Monitoring
Emergency Lighting
Operability Determination
Earthquake
Maintenance Rule Program
Fuel cladding
Power change
Manual Operator Action
ML20093E14811 April 2019Updated Final Safety Analysis Report, Chapter 6 TablesSafe Shutdown
Boric Acid
Stroke time
Weld Overlay
Coatings
Design basis earthquake
Earthquake
GOTHIC
ML20093E10711 April 2019Updated Final Safety Analysis Report, Chapter 6 Figures
ML20093E06011 April 2019Updated Final Safety Analysis Report, Chapter 6Safe Shutdown
Boric Acid
Packing leak
Mission time
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
FLEX
B.5.b
Design basis earthquake
Excess Flow Check Valve
Earthquake
Fuel cladding
Liquid penetrant
GOTHIC
Manual Operator Action
Thermal fatigue
ML20093D98911 April 2019Updated Final Safety Analysis Report, Chapter 5 TablesBoric Acid
Stroke time
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Pressure Boundary Leakage
Unidentified leakage
ML20093D96011 April 2019Updated Final Safety Analysis Report, Chapter 5 Figures
ML20094P47411 April 2019Updated Final Safety Analysis Report, Chapter 13Fitness for Duty
Cyber Security
Safeguards Contingency Plan
Cyber attack
Loss of condenser vacuum
ML20093D59911 April 2019Updated Final Safety Analysis Report, Chapter 4 TablesShutdown Margin
ML20093D56211 April 2019Updated Final Safety Analysis Report, Chapter 4 Figures
ML20093D53811 April 2019Updated Final Safety Analysis Report, Chapter 4Boric Acid
Shutdown Margin
Safe Shutdown Earthquake
Nondestructive Examination
Design basis earthquake
Stress corrosion cracking
Earthquake
Fuel cladding
Power change
Flow Induced Vibration
Overspeed trip
ML20095H46311 April 2019Updated Final Safety Analysis Report, Chapter 14 Tables
ML20093D50511 April 2019Updated Final Safety Analysis Report, Chapter 3 TablesBoric Acid
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Tornado Generated Missile
Tornado Missile Protection
TORMIS
Turbine Missile
ML19087A06211 April 2019Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief RequestDissimilar Metal Weld
ML20095H45011 April 2019Updated Final Safety Analysis Report, Chapter 14Boric Acid
Shutdown Margin
Hydrostatic
Local Leak Rate Testing
Power Operated Valves
Negative Flux Rate Trip
ML20095H53711 April 2019Updated Final Safety Analysis Report, Chapter 18 TablesBoric Acid
Aging Management
Flow Accelerated Corrosion
License Renewal
Fire Protection Program
ML20095H52911 April 2019Updated Final Safety Analysis Report, Chapter 18Safe Shutdown
Boric Acid
Loop seal
Non-Destructive Examination
Weld Overlay
Coatings
VT-2
Incorporated by reference
Aging Management
Foreign Material Exclusion
Flow Accelerated Corrosion
Stress corrosion cracking
Eddy Current Testing
License Renewal
Earthquake
Biofouling
Through-Wall Leak
Fire Protection Program
Thermal fatigue
ML20095H52111 April 2019Updated Final Safety Analysis Report, Chapter 17Incorporated by reference
ML20095H51411 April 2019Updated Final Safety Analysis Report, Chapter 16
ML20095H49611 April 2019Updated Final Safety Analysis Report, Chapter 15 TablesLoop seal
Tornado Missile
Tornado Generated Missile
Fuel cladding
Coast down
ML20095H48311 April 2019Updated Final Safety Analysis Report, Chapter 15 Figures
ML20095H47011 April 2019Updated Final Safety Analysis Report, Chapter 15Boric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Tornado Missile
Tornado-Generated Missile
Tornado Missile Protection
Earthquake
Fuel cladding
Coast down
Power Uprate
Measurement Uncertainty Recapture
Overspeed trip
Manual Operator Action
Loss of condenser vacuum
ML20094N47411 April 2019Updated Final Safety Analysis Report, Chapter 11Boric Acid
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Fuel cladding
Pressure Boundary Leakage
ML20095H45511 April 2019Updated Final Safety Analysis Report, Chapter 14 Figures
ML20094P50611 April 2019Updated Final Safety Analysis Report, Chapter 13 Tables
ML20094P48511 April 2019Updated Final Safety Analysis Report, Chapter 13 Figures