ML20093E208

From kanterella
Jump to navigation Jump to search
Updated Final Safety Analysis Report, Chapter 7 Figures
ML20093E208
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/11/2019
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Croon G, NRR/DORL/LPL2-1, 415-1023
Shared Package
ML20093B880 List:
References
Download: ML20093E208 (95)


Text

McGuire Nuclear Station UFSAR Appendix 7B. Figures Appendix 7B. Figures

McGuire Nuclear Station UFSAR Figure 7-1 (Page 1 of 16)

(09 OCT 2015)

Figure 7-1. Instrumentation and Control System Logic Diagram

McGuire Nuclear Station UFSAR Figure 7-1 (Page 2 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 3 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 4 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 5 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 6 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 7 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 8 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 9 of 16)

(09 OCT 2015)

Deleted Per 2011 Update

McGuire Nuclear Station UFSAR Figure 7-1 (Page 10 of 16)

(09 OCT 2015)

Deleted Per 2011 Update

McGuire Nuclear Station UFSAR Figure 7-1 (Page 11 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 12 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 13 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 14 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 15 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-1 (Page 16 of 16)

(09 OCT 2015)

McGuire Nuclear Station UFSAR Figure 7-2 (Page 1 of 1)

(14 OCT 2000)

Figure 7-2. Setpoint Reduction Function for Overpower and Overtemperature Trips

McGuire Nuclear Station UFSAR Figure 7-3 (Page 1 of 1)

(14 OCT 2000)

Figure 7-3. Typical Illustration of High Trip. (T°F Tavg)

McGuire Nuclear Station UFSAR Figure 7-4 (Page 1 of 1)

(14 OCT 2000)

Figure 7-4. Design to Achieve Isolation Between Channels

McGuire Nuclear Station UFSAR Figure 7-5 (Page 1 of 1)

(14 OCT 2000)

Figure 7-5. Engineered Safeguards Test Cabinet-Index, Notes and Legend

McGuire Nuclear Station UFSAR Figure 7-6 (Page 1 of 1)

(14 OCT 2000)

Figure 7-6. Logic Diagram Nuclear Service Water System

McGuire Nuclear Station UFSAR Figure 7-7 (Page 1 of 1)

(14 OCT 2000)

Figure 7-7. Logic Diagram Component Cooling Water System

McGuire Nuclear Station UFSAR Figure 7-8 (Page 1 of 1)

(14 OCT 2000)

Figure 7-8. Logic Diagram Chemical and Volume Control System

McGuire Nuclear Station UFSAR Figure 7-9 (Page 1 of 1)

(14 OCT 2000)

Figure 7-9. Logic Diagram Residual Heat Removal System

McGuire Nuclear Station UFSAR Figure 7-10 and 7-11 (Page 1 of 1)

(14 OCT 2000)

Figure 7-10. Deleted Per 1996 Update Figure 7-11. Deleted Per 1996 Update

McGuire Nuclear Station UFSAR Figure 7-12 (Page 1 of 1)

(14 OCT 2000)

Figure 7-12. Logic Diagram - Annulus Vent System

McGuire Nuclear Station UFSAR Figure 7-13 (Page 1 of 1)

(14 OCT 2000)

Figure 7-13. Door Monitoring Zones

McGuire Nuclear Station UFSAR Figure 7-14 (Page 1 of 1)

(14 OCT 2000)

Figure 7-14. Logic Diagram - Lower Inlet Doors

McGuire Nuclear Station UFSAR Figure 7-15 (Page 1 of 1)

(24 APR 2014)

Figure 7-15. Logic Diagram: Lower Inlet Doors, Personnel Access Doors, Equipment Access Doors and Equipment Access Personnel Doors

McGuire Nuclear Station UFSAR Figure 7-16 (Page 1 of 1)

(24 APR 2014)

Figure 7-16. Logic Diagram: Equipment Access and Equipment Access Personnel Doors Note 1: The Equipment Access Door Seals (EADS) have been modified so that the Equipment Access Doors are permanently in the closed position with the Equipment Access Door seals deflated. Therefore, the alarm indication has been rewired to remove the Equipment Access Door Seal (EADS) alarm portion from the rest of the circuitry.

McGuire Nuclear Station UFSAR Figure 7-17 (Page 1 of 1)

(14 OCT 2000)

Figure 7-17. Ice Condenser RTD Location

McGuire Nuclear Station UFSAR Figure 7-18 (Page 1 of 1)

(14 APR 2005)

Figure 7-18. Block Diagram: Ice Condenser Temperature Monitoring System

McGuire Nuclear Station UFSAR Figure 7-19 (Page 1 of 1)

(30 NOV 2012)

Figure 7-19. Containment Pressure Control System Logic

McGuire Nuclear Station UFSAR Figure 7-20 (Page 1 of 1)

(27 MAR 2002)

Figure 7-20. Reactor Coolant System Overpressure Protection - Train A

McGuire Nuclear Station UFSAR Figure 7-21 (Page 1 of 1)

(05 APR 2011)

Figure 7-21. Simplified Block Diagram of Reactor Control System

McGuire Nuclear Station UFSAR Figures 7 7-26 (Page 1 of 1)

(05 APR 2011)

Figure 7-22. Deleted Per 2011 Update Figure 7-23. Deleted Per 2011 Update Figure 7-24. Deleted Per 2011 Update Figure 7-25. Deleted Per 2011 Update Figure 7-26. Deleted Per 2011 Update

McGuire Nuclear Station UFSAR Figure 7-27 (Page 1 of 1)

(14 OCT 2000)

Figure 7-27. Basic Flux-Mapping System

McGuire Nuclear Station UFSAR Figure 7-28 (Page 1 of 1)

(14 OCT 2000)

Figure 7-28. Deleted Per 1996 Update.

McGuire Nuclear Station UFSAR Figure 7-29 (Page 1 of 1)

(05 APR 2011)

Figure 7-29. Control Room Layout

McGuire Nuclear Station UFSAR Figure 7-30 (Page 1 of 1)

(14 OCT 2000)

Figure 7-30. Rod Deviation Comparator

McGuire Nuclear Station UFSAR Figure 7-31 (Page 1 of 1)

(05 APR 2011)

Figure 7-31. Deleted Per 2011 Update

McGuire Nuclear Station UFSAR Figure 7-32 (Page 1 of 12)

(24 APR 2014)

Figure 7-32. DAP & DBP Reactor Control System Functional Diagrams

McGuire Nuclear Station UFSAR Figure 7-32 (Page 2 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-32 (Page 3 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-32 (Page 4 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-32 (Page 5 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-32 (Page 6 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-32 (Page 7 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-32 (Page 8 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-32 (Page 9 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-32 (Page 10 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-32 (Page 11 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-32 (Page 12 of 12)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-33 (Page 1 of 11)

(24 APR 2014)

Figure 7-33. DAP & DBP Steam Dump Control System Functional Diagrams

McGuire Nuclear Station UFSAR Figure 7-33 (Page 2 of 11)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-33 (Page 3 of 11)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-33 (Page 4 of 11)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-33 (Page 5 of 11)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-33 (Page 6 of 11)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-33 (Page 7 of 11)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-33 (Page 8 of 11)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-33 (Page 9 of 11)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-33 (Page 10 of 11)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-33 (Page 11 of 11)

(24 APR 2014)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 1 of 12)

(05 APR 2011)

Figure 7-34. DAP & DBP Pressurizer Pressure and Level Control System Functional Diagrams

McGuire Nuclear Station UFSAR Figure 7-34 (Page 2 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 3 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 4 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 5 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 6 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 7 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 8 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 9 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 10 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 11 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-34 (Page 12 of 12)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 1 of 18)

(05 APR 2011)

Figure 7-35. DAP & DBP Feedwater Control System Functional Diagrams

McGuire Nuclear Station UFSAR Figure 7-35 (Page 2 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 3 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 4 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 5 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 6 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 7 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 8 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 9 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 10 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 11 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 12 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 13 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 14 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 15 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 16 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 17 of 18)

(05 APR 2011)

McGuire Nuclear Station UFSAR Figure 7-35 (Page 18 of 18)

(05 APR 2011)