McGuire Nuclear Station UFSAR Appendix 9B. Figures Appendix 9B. Figures
McGuire Nuclear Station UFSAR Figure 9-1 (Page 1 of 1)
(14 OCT 2000)
Figure 9-1. Fuel Building - General Arrangement
McGuire Nuclear Station UFSAR Figure 9-3 (Page 2 of 3)
(14 OCT 2000)
McGuire Nuclear Station UFSAR Figure 9-3 (Page 3 of 3)
(14 OCT 2000)
McGuire Nuclear Station UFSAR Figure 9-4 (Page 1 of 1)
(27 MAR 2002)
Figure 9-4. Cask Drop Evaluation
McGuire Nuclear Station UFSAR Figure 9-5 (Page 1 of 1)
(14 OCT 2000)
Figure 9-5. Tornado Missile Study
McGuire Nuclear Station UFSAR Figure 9-6 (Page 1 of 1)
(14 OCT 2000)
Figure 9-6. Spent Fuel Pool Arrangement Unit 1
McGuire Nuclear Station UFSAR Figure 9-7 (Page 1 of 1)
(14 OCT 2000)
Figure 9-7. Spent Fuel Pool Arrangement Unit 2
McGuire Nuclear Station UFSAR Figure 9-8 (Page 1 of 1)
(14 OCT 2000)
Figure 9-8. Deleted Per 1996 Update
McGuire Nuclear Station UFSAR Figure 9-11 (Page 1 of 1)
(14 OCT 2000)
Figure 9-11. Region 1 Cell Layout
McGuire Nuclear Station UFSAR Figure 9-12 (Page 1 of 1)
(14 OCT 2000)
Figure 9-12. Region 2 Cell Layout
McGuire Nuclear Station UFSAR Figure 9-13 (Page 1 of 1)
(14 OCT 2000)
Figure 9-13. Summary Flow Diagram Spent Fuel Cooling System (KF)
McGuire Nuclear Station UFSAR Figure 9-14 (Page 1 of 1)
(30 NOV 2012)
Figure 9-14. Reactor Manipulator Crane
McGuire Nuclear Station UFSAR Figure 9-15 (Page 1 of 1)
(10 OCT 2009)
Figure 9-15. Deleted Per 2009 Update
McGuire Nuclear Station UFSAR Figure 9-16 (Page 1 of 1)
(30 NOV 2012)
Figure 9-16. Fuel Pool Manipulator Crane
McGuire Nuclear Station UFSAR Figure 9-17 (Page 1 of 1)
(14 OCT 2000)
Figure 9-17. New Fuel Elevator
McGuire Nuclear Station UFSAR Figure 9-18 (Page 1 of 1)
(14 OCT 2000)
Figure 9-18. Fuel Transfer System
McGuire Nuclear Station UFSAR Figure 9-19 (Page 1 of 1)
(14 OCT 2000)
Figure 9-19. Rod Cluster Control Changing Fixture
McGuire Nuclear Station UFSAR Figure 9-20 (Page 1 of 1)
(14 OCT 2000)
Figure 9-20. Spacer for Spent Fuel Storage
McGuire Nuclear Station UFSAR Figure 9-21 (Page 1 of 1)
(14 OCT 2000)
Figure 9-21. Reactor Vessel Head Lifting Device
McGuire Nuclear Station UFSAR Figure 9-22 (Page 1 of 1)
(14 OCT 2000)
Figure 9-22. Reactor Internals Lifting Device
McGuire Nuclear Station UFSAR Figure 9-23 (Page 1 of 1)
(14 OCT 2000)
Figure 9-23. Reactor Vessel Stud Tensioner
McGuire Nuclear Station UFSAR Figure 9-24 (Page 1 of 1)
(14 OCT 2000)
Figure 9-24. Auxiliary and Reactor Building Refueling Canal Layout/Longitudinal Section
McGuire Nuclear Station UFSAR Figure 9-25 (Page 1 of 1)
(30 NOV 2012)
Figure 9-25. Flow Diagram of Recirculated Cooling Water System
McGuire Nuclear Station UFSAR Figure 9-26 (Page 1 of 1)
(14 APR 2005)
Figure 9-26. Flow Diagram of Recirculated Cooling Water System (KR)
McGuire Nuclear Station UFSAR Figure 9-27 (Page 1 of 1)
(06 OCT 2003)
Figure 9-27. Flow Diagram of Recirculated Cooling Water System (KR)
McGuire Nuclear Station UFSAR Figure 9-28 (Page 1 of 1)
(24 APR 2014)
Figure 9-28. Flow Diagram of Recirculated Cooling Water System (KR)
McGuire Nuclear Station UFSAR Figure 9-29 (Page 1 of 1)
(06 OCT 2003)
Figure 9-29. Flow Diagram of Recirculated Cooling Water System (KR)
McGuire Nuclear Station UFSAR Figure 9-31 (Page 1 of 1)
(09 OCT 2015)
Figure 9-31. Nuclear Service Water System (RN)
McGuire Nuclear Station UFSAR Figures 9 9-38 (Page 1 of 1)
(14 OCT 2000)
Figure 9-32. Deleted Per 1993 Update Figure 9-33. Deleted Per 1993 Update Figure 9-34. Deleted Per 1993 Update Figure 9-35. Deleted Per 1993 Update Figure 9-36. Deleted Per 1993 Update Figure 9-37. Deleted Per 1993 Update Figure 9-38. Deleted Per 1991 Update
McGuire Nuclear Station UFSAR Figure 9-39 (Page 1 of 1)
(09 OCT 2015)
Figure 9-39. Residual Decay Heat
McGuire Nuclear Station UFSAR Figure 9-40 (Page 1 of 1)
(09 OCT 2015)
Figure 9-40. Residual Decay Heat
McGuire Nuclear Station UFSAR Figure 9-41 (Page 1 of 1)
(09 OCT 2015)
Figure 9-41. Total Heat Rejected
McGuire Nuclear Station UFSAR Figure 9-42 (Page 1 of 1)
(14 OCT 2000)
Figure 9-42. Standby Nuclear Service Water Pond Area/Volume Curve
McGuire Nuclear Station UFSAR Figure 9-43 (Page 1 of 1)
(24 APR 2014)
Figure 9-43. Low Level Nuclear Service Water Pipe and Standby Nuclear Service Water Pipe Routing Plan
McGuire Nuclear Station UFSAR Figure 9-44 (Page 1 of 1)
(09 OCT 2015)
Figure 9-44. Profile of Standby Nuclear Service Water Pipes
McGuire Nuclear Station UFSAR Figure 9-45 (Page 1 of 1)
(24 APR 2014)
Figure 9-45. Profile of Low Level Nuclear Service Water Pipe
McGuire Nuclear Station UFSAR Figures 9 9-53 (Page 1 of 1)
(30 NOV 2012)
Figure 9-46. Deleted Per 2012 Update Figure 9-47. Deleted Per 2012 Update Figure 9-48. Deleted Per 2012 Update Figure 9-49. Deleted Per 2012 Update Figure 9-50. Deleted Per 2012 Update Figure 9-51. Deleted Per 2012 Update Figure 9-52. Deleted Per 2012 Update Figure 9-53. Deleted Per 2012 Update
McGuire Nuclear Station UFSAR Figure 9-54 (Page 1 of 1)
(09 OCT 2015)
Figure 9-54. Flow Diagram of Conventional Low Pressure Service Water System (RL)
McGuire Nuclear Station UFSAR Figure 9-55 (Page 1 of 1)
(14 OCT 2000)
Figure 9-55. Flow Diagram of Conventional Low Pressure Water System (RL) (Service Bldg.
Cooling Coils)
McGuire Nuclear Station UFSAR Figure 9-56 (Page 1 of 1)
(09 OCT 2015)
Figure 9-56. Flow Diagram of Conventional Low Pressure Service Water System (RL)
McGuire Nuclear Station UFSAR Figure 9-57 (Page 1 of 1)
(14 OCT 2000)
Figure 9-57. Component Cooling System
McGuire Nuclear Station UFSAR Figures 9 9-64 (Page 1 of 1)
(14 OCT 2000)
Figure 9-58. Deleted Per 1996 Update Figure 9-59. Deleted Per 1996 Update Figure 9-60. Deleted Per 1996 Update Figure 9-61. Deleted Per 1996 Update Figure 9-62. Deleted Per 1996 Update Figure 9-63. Deleted Per 1996 Update Figure 9-64. Deleted Per 1996 Update
McGuire Nuclear Station UFSAR Figure 9-65 (Page 1 of 1)
(13 APR 2008)
Figure 9-65. Refueling Water System (FW)
McGuire Nuclear Station UFSAR Figure 9-66 (Page 1 of 1)
(24 APR 2014)
Figure 9-66. Flow Diagram of Filtered Water System
McGuire Nuclear Station UFSAR Figure 9-67 (Page 1 of 1)
(24 APR 2014)
Figure 9-67. Flow Diagram of Filtered Water System (YF)
McGuire Nuclear Station UFSAR Figure 9-68 (Page 1 of 1)
(24 APR 2014)
Figure 9-68. Filtered Water System (YF)
McGuire Nuclear Station UFSAR Figure 9-69 (Page 1 of 1)
(09 OCT 2015)
Figure 9-69. Flow Diagram of Makeup Demineralized Water System (YM)
McGuire Nuclear Station UFSAR Figure 9-70 (Page 1 of 1)
(24 APR 2014)
Figure 9-70. Flow Diagram of Makeup Demineralized Water System (YM)
McGuire Nuclear Station UFSAR Figure 9-71 (Page 1 of 1)
(24 APR 2014)
Figure 9-71. Flow Diagram of Makeup Demineralized Water System (YM)
McGuire Nuclear Station UFSAR Figure 9-72 (Page 1 of 1)
(09 OCT 2015)
Figure 9-72. Flow Diagram of Makeup Demineralized Water System (YM)
McGuire Nuclear Station UFSAR Figure 9-73 (Page 1 of 1)
(22 APR 2017)
Figure 9-73. Makeup Demineralized Water System (YM)
McGuire Nuclear Station UFSAR Figure 9-74 (Page 1 of 1)
(09 OCT 2015)
Figure 9-74. Flow Diagram of Makeup Demineralized Water System (YM)
McGuire Nuclear Station UFSAR Figure 9-75 (Page 1 of 2)
(09 OCT 2015)
Figure 9-75. Flow Diagram of Makeup Demineralized Water System (YM)
McGuire Nuclear Station UFSAR Figure 9-75 (Page 2 of 2)
(09 OCT 2015)
McGuire Nuclear Station UFSAR Figure 9-76 (Page 1 of 1)
(24 APR 2014)
Figure 9-76. Flow Diagram of Drinking Water System (YD)
McGuire Nuclear Station UFSAR Figure 9-77 (Page 1 of 1)
(09 OCT 2015)
Figure 9-77. Flow Diagram of Conventional Waste Water Treatment System (WC)
McGuire Nuclear Station UFSAR Figure 9-78 (Page 1 of 1)
(14 OCT 2000)
Figure 9-78. Deleted Per 1993 Update
McGuire Nuclear Station UFSAR Figure 9-79 (Page 1 of 1)
(05 APR 2011)
Figure 9-79. Summary Flow Diagram of Instrument Air System (VI)
McGuire Nuclear Station UFSAR Figures 9 9-82 (Page 1 of 1)
(14 OCT 2000)
Figure 9-80. Deleted Per 1993 Update Figure 9-81. Deleted Per 1993 Update Figure 9-82. Deleted Per 1993 Update
McGuire Nuclear Station UFSAR Figure 9-83 (Page 1 of 1)
(14 OCT 2000)
Figure 9-83. Flow Diagram of Station Air System This figure is currently unavailable in an electronic format. It can be located in a hardcopy version of the UFSAR.
McGuire Nuclear Station UFSAR Figures 9 9-89 (Page 1 of 1)
(14 OCT 2000)
Figure 9-84. Deleted Per 1993 Update Figure 9-85. Deleted Per 1993 Update Figure 9-86. Deleted Per 1993 Update Figure 9-87. Deleted Per 1993 Update Figure 9-88. Deleted Per 1993 Update Figure 9-89. Deleted Per 1993 Update
McGuire Nuclear Station UFSAR Figure 9-90 (Page 1 of 1)
(11 NOV 2006)
Figure 9-90. Summary Flow Diagram Of Nuclear Sampling System (NM)
McGuire Nuclear Station UFSAR Figure 9-91 (Page 1 of 1)
(14 OCT 2000)
Figure 9-91. Flow Diagram of Nuclear Sampling System
McGuire Nuclear Station UFSAR Figure 9-92 (Page 1 of 1)
(09 OCT 2015)
Figure 9-92. Flow Diagram of Nuclear Sampling System
McGuire Nuclear Station UFSAR Figures 9-93 95 (Page 1 of 1)
(14 OCT 2000)
Figure 9-93. Deleted Per 1996 Update Figure 9-94. Deleted Per 1993 Update Figure 9-95. Deleted Per 1993 Update
McGuire Nuclear Station UFSAR Figure 9-96 (Page 1 of 1)
(14 OCT 2000)
Figure 9-96. Flow Diagram of Chemical and Volume Control System
McGuire Nuclear Station UFSAR Figure 9-97 (Page 1 of 1)
(14 OCT 2000)
Figure 9-97. Deleted Per 1993 Update
McGuire Nuclear Station UFSAR Figure 9-98 (Page 1 of 1)
(24 APR 2014)
Figure 9-98. Summary Flow Diagram of Chemical and Volume Control System (NV)
McGuire Nuclear Station UFSAR Figures 9 9-106 (Page 1 of 1)
(14 OCT 2000)
Figure 9-99. Deleted Per 1993 Update Figure 9-100. Deleted Per 1993 Update Figure 9-101. Deleted Per 1993 Update Figure 9-102. Deleted Per 1993 Update Figure 9-103. Deleted Per 1993 Update Figure 9-104. Deleted Per 1993 Update Figure 9-105. Deleted Per 1993 Update Figure 9-106. Deleted Per 1993 Update
McGuire Nuclear Station UFSAR Figure 9-107 (Page 1 of 1)
(30 NOV 2012)
Figure 9-107. Flow Diagram of Boron Thermal Regeneration System (NR)
McGuire Nuclear Station UFSAR Figure 9-108 (Page 1 of 1)
(30 NOV 2012)
Figure 9-108. Flow Diagram of Boron Thermal Regeneration System
McGuire Nuclear Station UFSAR Figure 9-109 (Page 1 of 1)
(30 NOV 2012)
Figure 9-109. Deleted Per 2012 Update
McGuire Nuclear Station UFSAR Figure 9-110 (Page 1 of 1)
(14 OCT 2000)
Figure 9-110. Flow Diagram of Boron Recycle System (NB)
McGuire Nuclear Station UFSAR Figures 9-111 116 (Page 1 of 1)
(14 OCT 2000)
Figure 9-111. Deleted Per 1994 Update Figure 9-112. Deleted Per 1994 Update Figure 9-113. Deleted Per 1994 Update Figure 9-114. Deleted Per 1994 Update Figure 9-115. Deleted Per 1994 Update Figure 9-116. Deleted Per 2002 Update
McGuire Nuclear Station UFSAR Figure 9-117 (Page 1 of 1)
(14 OCT 2000)
Figure 9-117. Flow Diagram of Auxiliary Building Ventilation System
McGuire Nuclear Station UFSAR Figure 9-118 (Page 1 of 1)
(14 OCT 2000)
Figure 9-118. Flow Diagram of Auxiliary Building Ventilation System
McGuire Nuclear Station UFSAR Figure 9-119 (Page 1 of 2)
(14 OCT 2000)
Figure 9-119. Summary Flow Diagram of Auxiliary Building Ventilation (VA) System
McGuire Nuclear Station UFSAR Figure 9-119 (Page 2 of 2)
(14 OCT 2000)
McGuire Nuclear Station UFSAR Figure 9-120 (Page 1 of 1)
(10 OCT 2009)
Figure 9-120. Flow Diagram of Turbine Building Ventilation System
McGuire Nuclear Station UFSAR Figure 9-121 (Page 1 of 1)
(13 APR 2008)
Figure 9-121. Flow Diagram of Containment Purge and Ventilation System (VP)
McGuire Nuclear Station UFSAR Figure 9-122 (Page 1 of 1)
(14 OCT 2000)
Figure 9-122. Deleted Per 1994 Update
McGuire Nuclear Station UFSAR Figure 9-123 (Page 1 of 1)
(27 MAR 2002)
Figure 9-123. Flow Diagram of Diesel Building Ventilation System
McGuire Nuclear Station UFSAR Figure 9-124 (Page 1 of 1)
(13 OCT 2018)
Figure 9-124. Deleted Per 2018 Update
McGuire Nuclear Station UFSAR Figure 9-125 (Page 1 of 1)
(13 OCT 2018)
Figure 9-125. Deleted Per 2018 Update
McGuire Nuclear Station UFSAR Figures 9-126 131 (Page 1 of 1)
(14 OCT 2000)
Figure 9-126. Deleted Per 1993 Update Figure 9-127. Deleted Per 1993 Update Figure 9-128. Deleted Per 1993 Update Figure 9-129. Deleted Per 1993 Update Figure 9-130. Deleted Per 1993 Update Figure 9-131. Deleted Per 1993 Update
McGuire Nuclear Station UFSAR Figure 9-132 (Page 1 of 1)
(14 OCT 2000)
Figure 9-132. Communication Systems
McGuire Nuclear Station UFSAR Figure 9-133 (Page 1 of 1)
(14 OCT 2000)
Figure 9-133. Communication Systems
McGuire Nuclear Station UFSAR Figure 9-134 (Page 1 of 1)
(14 OCT 2000)
Figure 9-134. Communication Systems
McGuire Nuclear Station UFSAR Figure 9-135 (Page 1 of 1)
(14 OCT 2000)
Figure 9-135. Communication Systems
McGuire Nuclear Station UFSAR Figure 9-136 (Page 1 of 1)
(14 OCT 2000)
Figure 9-136. Communication Systems
McGuire Nuclear Station UFSAR Figure 9-137 (Page 1 of 1)
(14 OCT 2000)
Figure 9-137. Communication Systems
McGuire Nuclear Station UFSAR Figure 9-138 (Page 1 of 1)
(14 OCT 2000)
Figure 9-138. Communication Systems
McGuire Nuclear Station UFSAR Figure 9-139 (Page 1 of 1)
(14 OCT 2000)
Figure 9-139. Flow Diagram of Diesel Generator Engine "1A" Fuel Oil System
McGuire Nuclear Station UFSAR Figure 9-140 (Page 1 of 1)
(14 OCT 2000)
Figure 9-140. Deleted Per 1993 Update
McGuire Nuclear Station UFSAR Figure 9-141 (Page 1 of 1)
(14 OCT 2000)
Figure 9-141. Flow Diagram of Diesel Generator Engine Cooling Water System
McGuire Nuclear Station UFSAR Figure 9-142 (Page 1 of 1)
(14 OCT 2000)
Figure 9-142. Deleted Per 1993 Update
McGuire Nuclear Station UFSAR Figure 9-143 (Page 1 of 1)
(13 OCT 2018)
Figure 9-143. Flow Diagram of Diesel Generator Engine Starting Air System (VG)
McGuire Nuclear Station UFSAR Figure 9-144 (Page 1 of 1)
(14 OCT 2000)
Figure 9-144. Flow Diagram of Diesel Generator Engine Lube Oil System
McGuire Nuclear Station UFSAR Figure 9-145 (Page 1 of 1)
(14 OCT 2000)
Figure 9-145. Deleted Per 1993 Update
McGuire Nuclear Station UFSAR Figure 9-146 (Page 1 of 1)
(14 OCT 2000)
Figure 9-146. Groundwater Drainage System
McGuire Nuclear Station UFSAR Figure 9-147 (Page 1 of 1)
(14 OCT 2000)
Figure 9-147. Flow Diagram of Diesel Generator Engine Crankcase Vacuum System
McGuire Nuclear Station UFSAR Figure 9-148 (Page 1 of 1)
(14 OCT 2000)
Figure 9-148. Flow Diagram of Diesel Generator Room Sump Pump System
McGuire Nuclear Station UFSAR Figure 9-149 (Page 1 of 1)
(14 OCT 2000)
Figure 9-149. Flow Diagram of Diesel Generator Engine Air Intake & Exhaust System
McGuire Nuclear Station UFSAR Figure 9-150 (Page 1 of 1)
(14 OCT 2000)
Figure 9-150. Containment Air Release and Addition System